Loading…
Loading…
7,395 results • Best match
Design and development of Web and Mobile based Dam storage and safety, Flood Management system for Maharashtra Water Resources Department
Repair to Erosion of Ogee Surface Filling pot holes at Gate No.2 of Pawana Dam Tal. Maval Dist. Pune
Cleaning the Vertical Porous Drain at R/s including removing leaching material,grout material in inspection Gallery of Bhatsa Dam.
Construction of Sakav (C.D. Work) and Road Work Between Kashele Baudhawada to Dam Road Part-2 Tal-Karjat Dist-Raigad.
Raising Height of Barvi Dam Rehabilitation work Providing Grampanchayat building, weather shed, kitchen shed at Kachkoli I Gaothan. -- 2nd Call
Repairs to head regualtor and guard stone and construction of gate on dam bund of Ghodazari medium project Dist. Chandrapur
Providing Manpower To Perform Work Of Labour, Pump Operator At Upper Wardha Dam, Lbhr, Rbhr, And Gurukunj Lift Irrigation Scheme
Constructing R.C.C. steps on Us of Deoghar dam for watching water level for fixing water storage,Tal. Kankavali, Dist. Sindhudurg
Repairing Of Earthen Dam Pitching and Regradation Of Local Nalla Of Alur M I Tank Tq Omerga and Dist Osmanabad
Supply, Erection, Testing and Commissioning of ESE based Lightning Arrestor System on the Dam of Lower Pus Project, Dist Yavatmal.
STBT on Tirora Kawalewada Dam Approch Road VR -105 Km 0/00 to 12/00 in Taluka Tirora Dist Gondia
GRAVITY MAIN UJANI DAM MAIN WALL TO EXISTING OVERHEAD TANK AT MATSYABIJ KENDRA HINGAON , Tal. Indapur , Dist. Pune (2nd Call)
Construction of Road Vasundri To Pise Dam, Ch. No. 0/300 To 0/500, VR 144, Taluka Kalyan, District Thane.
Cleaning the Vertical Porous Drain at L/s including removing leaching material, grout material in inspection Gallery of Bhatsa Dam.
Beutification of premices, Boating arrangement and tent city at Waghur Dam backwater premices (Old Shingayat Shivar), Tal- Jamner, Dist-Jalgaon.
Construction of Balance Pitching work Divide wall of Dam and allied works of Lower Pedhi Project Tal Bhatkuli Dist Amravati
Outsourcing on Dam measuring level, Sinchan Vasuli and preparing Akarni Prapatra in Warna Irrigation Sub Division kodoli for 2020-21
Maintenance and Repairs to veer Dam removing trees and cleaning the toe drains, relief well and Repairs to parapet wall
Constructing Revetment to Bearm of Earthen Dam,Toe Drain and Outside Cross Drain of Savaladbara Storage Tank Tq.Soygaon Dist Aurangabad
Sherina regarding desilting the jackwell at the pumping station and installing a coffer dam in the drain on the outside.
M and R to Dam of TambveM.I. Tank by Removing thorny shrubs and bushes, siltation of drain and repairing bankwork
Outsourcing on Dam measuring level, Sinchan Vasuli and preparing Akarni Prapatra in Warna Irrigation Sub Dn for Year 2021 - 22
BBM Carpet On Haldani to Gatadi Dam road km 2 00 to 3 500 V R184 Tal Navapur Dist Nandurbar
M and R to WSS at Addl. Dindori Talegaon Akrale Industrial Area.. Desilting of jackwell at Palkhed Dam. Rs. 37,67,400.00
Construction of road at NH-222 to Manivali (Gho) Katkarwadi Dam in Taluka-Murbad, District-Thane. (Under 5054 Tribal work)
CONST. OF HPC ON WARLA TO IRRIGATION DAM ROAD AT. SHELU KH TQ DIST. WASHIM ( UNDER MP FUND 19-20)
Carrying out Geotechnical Investigation works for the proposed Raw Water Tunnel from Kondhane dam site to Mohope Village.(2ND CALL)
Construction of Cement Concrete road at Jambhe Dam to Neharoli Lenad road in Taluka-Shahapur, District-Thane. (Under Tourism Programme)
PROPOSED CONSTRUCTION OF W.B.M. ROAD and Other Works FROM TALEGAON DAM TO KAPARESHWAR MANDIR, TALEGAON Igatpuri Tal Igatpuri Dist Nashik
Construction of dry rubble Check Dam At Khadakwadi F C No 257, At Kurvandi F C No 217, Manchar Range
Construction of Road to ODR-63 to Latipada Dam Road VR-83 Km.0/00 to 2/00 Tal.Sakri Dist.Dhule
Cleaning by redrilling the vertical porous drain pipes and repairs to ceiling in the foundation gallery of Navegaon Khairy Dam
Construction of structure at junction of ICPO pf Mahu Dam,_ Main Canal No_1 under Kudali Medium Irrigation Project,Tal_Jawali,Dist_Satara
Constructing R.C.C. steps on Us of Deoghar dam for watching water level for fixing water storage,Tal. Kankavali, Dist. Sindhudurg
Repairs to Radial gate 12 x 6.5 m 20 nos by replacing wire ropes at wadgaon dam lower venna project
Providing and Engaging Mechanical and Technical Manpower for Maintenance, Surveillance, Upkeep of Ujjani Dam in Rabbi and Hot Weather Season.
Construction Of Cement Concrete Protection Wall to right side of Hetawane dam direct approach road Ch 80 to Ch 120.
Construction of Concrete Check Dam at Vil, Koshimbe (Old Survey No. 472, New Survey No. 761 Tal. Vasai Dist. Palghar
Repairs to Verticle Lift Gate of Size 15 x 5 Mtr - 21 Nos by Overhauling bottom Track roller 4 nos with replacement of bearing Mangrul Barrage on Godavari River.Tq-Ghansavangi Dist. Jalna
Maintenance of Vertical Lift Gates of size 15m x 9 m.-27 Nos. and allied Mechanical Equipment at Prakasha Barrage under Executive Engineer, Dhule Irrigation Division Dhule For the year 2019-20.
Proposed Seven Barrage on Girna River Dist. Jalgaon by Tapi Irrigation Development Corporation Jalgaon M.S. PIN. 425001 Tapi Irrigation Development Corporation Jalgaon is Government of Maharashtra undertaking Proposal for Environmental Mangement Pla
Repairs and maintenance of Vertical lift gates of size 15 X 5 mtr -16 Nos , Hoist 60MT cap.,Goliath crane 25 MT cap. and stop log gate maintenance at Mudgal Barrage Dis.Parbhani
Painting of VLG of size 15x10 Mtr and embedments Hoist bridge Pylon structure Canopy ladders etc at Ghungashi Barrage Dist Akola under Executive Engineer Irrigation Projects and Water Resources Investigation Division Amravati
Jobwork of Manufacturing, supply erection of End Drives combined cabin (between 2 Gates) 6.1 x 2.4 - 4 Nos., Central and End Drive Cabin 3.0 x 2.5 - 7 Nos. and Pannel box Cabin 1.25 2.5 Mtr - 1No. For Radial Gate 12 5 - 5Nos at Nira Deoghar Dam.
Remaining works to be carried out at Uchangi Dam (Construction ofal supply- Installation of CCTV camera
Repair Maintenance And Paint ing Work Of Trash Rack Panels09 Nos. For Power Outlet Emergency Gate Work Of Pe riodic Repair And Maintenance Of Various Gates And Allied Work At Pawana Dam Project
Repair of waste ware bar wall of Uma dam under Uma project, Fixing of chainage stone on Dam wall and Marking by Colour on selected area ,Lining at selected places from R.D. 8800 mto 13680 m on Main canal under Uma project, Siphon repair at R.D.560
4702 M .I. Projects - Resectioning of U/S and D/S Embankment and U/S Pitching as per design section of dam, Strengthening and renovation of Existing Flank Wall, W.W. Bar, H. R. Well an Intake Structure etc. and other dam safety related works of M.I.
Removal of vegetation shrubs, bushes, grass, small trees from Downstream slopes of Right flank earthen dam RD 6808.90 m to 8056 m and Left flank earthen dam D/s slopes RD - 3300.00 m to 0.00 m and from 0.00 m to 5905.00 m and Supplying labour GP
A Job work of Repairs to Escape Gate of Size 1000 mm X 800 mm- 02 Nos. for Right Bank Canal at 55 M. n Escape Gate of Size 1000 mm X 800 mm- 02 Nos. for Right Bank Canal at 11 Km.at Kawadas Dam Surya Project Tal. Vikramgad Dist. Palghar.