Loading…
Loading…
4,267 results • Best match
Construction of protection wall to Regularise of Down stream Dam Water at Hathiyadeh Dam MIP Tehsil Kishanganj District Baran
Field Bund with Waste weir , Earthen bund with Waste weir, Periphearl Bund, Sub Surface Barrier,Cattle Shed ,Manger And Tanka with Agor Construction For Project Jalore-25 (IWMP) 13-14 Block Jaswantpura
19_Construction of Percolation Tank with Wasteweir (1), WHS (1), Anicut Cum Causeway(1) and Renovation fo Anicut (1) (Total 4 Works) in GP Bhatoli Bagriyan,Bhatoli Gujaran, Nadakheda, Chikarda PMKSY 2.0 Project Chittorgarh WDC-5 Block Dungla Distric
3_Construction of Anicut, Farm Pond, MPT, PT, Pacca Checkdam, WHS, Talab and Renovation of Anicut, WHS, Talab, Amrit Sarowar Work (Total 51 Works) in GP Luhariya, Mandesara, Sanita PMKSY 2.0 Project Chittorgarh WDC-3 Block Bhainsrodgarh District Chit
2_Construction of Anicut, Pacca Chekdam, WHS, Sunken Pond, Farm Pond, MPT, Other N.R.M. Work, Amrit Sarovar Work and Rennovation of Anicut (Total 46 Works)in GP Peepalwas, Sukhwara, Nahargarh, Kannoj PMKSY 2.0 Project Chittorgarh WDC-2 Block Bhadesar
Selection of Bidder for Collection of User Fee through Fee Collecting Agency on the basis of competitive bidding through eProcurement basis on Bari Baseri Bayana Weir Bhusawar Chhonkarwara Kherili Road Km. 0/00 to 122/00 on urgent temporary basis for
Renovation work of canal of Siriyari Dam
Urgent Repair of Motipura Dam (2022-23)
deposite work TOW rehabilitation colony Takli dam
CC ROAD CONSTRUCTION ON KAMAL HAUS DAM
Repair work of byewash of Borband dam
Forest clearing and earthworks of Hinglot dam.
PAKKA CHECK DAM WORK BISHANPURA RANGE HINDOLI
Repairs and Renovation work Bhawani Ganv Dam
Renovation remaining Sub minors of Chikalwas Dam
Forest clearing and earthworks of Hinglot dam.
baradari building remaining work at surpura dam
Deposite work TOW Rehabitalation colony Takli dam
Repair of outlet of Jaswant Sagar Dam
CONSTRUCTION OF PAKKA CHECK DAM (PCD 1)
2_pakka chek dam nirman karya,borda,Atun
2_pakka chek dam nirman karya,kundiya kala
Construction of Pakka Check Dam PS Baran
Construction of Emergency Gate in Giroliya Dam
Construction of PCD, Anicut Renovation, Nadi, PT, SP, FP, Khadin, Bank Stabilization in Block Pisangan under PMKSY 2.0
Construction of Farm Pond, Khadin, Sunken Pond, Anicut and Parcolation Tank in Gp Dhal, Sanod, Tilana, Ramser, Mavsiya, lavera, Dilwara and Derathoo of PS Srinagar
Renovation and modification work of Bundi Ka Gothra dam Tehsil Hindoli District Bundi and Paibalapura dam Tehsil Nainwan District Bundi
Rehabilitation and improvement works of Mahi Bajaj Sagar Dam District Banswara under Dam Rehabilitation and Improvement Project DRIP Phase II
7_Construction of Anicut Cum Causeway(5), Anicut(6), Waste Wier (3), Farm Pond (2), Amrit Sarowar(1), Roof Top Rain Water Harvesting Structure With Recharge Shaft (4) and Renovation of Waste Wier (3) GP Chikarada, Nadakheda, Bhatoli Gujran, Bhatoli
ANNUAL WORK CONTRACT OF ROUTINE / BREAKDOWN AND CAPITAL (ELECTRICAL WORKS) MAINT OF RIV WAT SYSTEM, OPRN OF PUMPS FROM RAW WATER CTRL ROOM/DAM SITE, OPRN OF 33KV S/S AT DAM SITE, AT KATPP SITE AND OPRN OF 33/11KV CONST POWER S/S AT KATPP, JHALAWAR
Earthen chek dams, Talai, Mini Percolation Tank, Percolation Tank,whs,-RTWHS/Recharges shaft And other water harvesting Structures PMKSY 2.0 Block Sawai madhopur
Anicuts, Pakka chek dams, Talai,farm pond, talai renovasion,sunken pond,whs,rtwhs And other water harvesting Structures under pmksy 2.0 Block Gangapurcity
Anicuts, Pakka chek dams, ECD,Farm pond,whs ,Amrit sarover,talai,talai renovation,And other water harvesting Structures under PMKSY 2.0 Block Bamanwas
Inspection Path Stair for D/s of Ubeshwar Mahadev Anicut Part I village - Ubeshwar Tehsil - Girwa 006
Inspection Path Stair for D/s of Ubeshwar Mahadev Anicut Part II village - Ubeshwar Tehsil - Girwa 07
ANICUT WORK WHS SAWA NALA NO 2A (WORK ID 974845) FOREST BLOCK MACHALA G.P SAWA RANGE NIMBAHERA
Construction of Anicut and Pakka Checkdam Gram Panchayat Dehri, Savan ka Kayra PS Kotda ( By PMKSY 2.0)
Restoration of Anicut at Kundi Ka Nallah and Chadiyo Ka Nallah Village Bamanheda Tehsil and District Beawer
2 - Construction of Dhanora Anicut (Kailash Dhakar ke Khet ke Pass) GP- Govindpura, P.S. - Begun, District - Chittorgarh
Construction of Anicut at Parbati River near Sanjapuri Ashram Village Barai, G.P. Barai, P.S. Baseri District Dholpur
Range Aklera mein Patankhema Road ke Pass Datila mein Anicut Nirman Kary (As per G- Schedule 4)
Repair of Banediya Purana anicut and other rehabilitation work Tehsil Toda Raisingh District Tonk under Bisalpur Project
Construction of Anicut , PCD and DSMP at Dhamniya and Bharev Gram Panchayat PS Lasadiya ( By IWMP 20)
Construction of Anicut and Packka Checkdam Work at GP Kadiya, Antri, Vardara PS Kumbhalgarh Under RGJSY Ist
Renovation of Soil Con. Anicut 2 at Mandliya ( Jodhpura ) PIV KOT LAD JO DLT WHS ART 000548011
Construction of Anicut Work under RGJSY-1 in Gram Panchayat Purushottampura,Dawarikapura and Dantil PS Paota Jaipur
Inspection Path Stair for D/s of Ubeshwar Mahadev Anicut Part III village - Ubeshwar Tehsil - Girwa 008
Construction of Anicut across Pachel Khadi and Protection wall near Village Pachel Kalan Tehsil Anta District Baran
4_Construction of Anicut(6) and Percolation Tank(2) GP Bhainsrodgarh, Shripura, Dhangadmahu Kalan Block Bhainsrodgarh under RGJSY
7_Construction Anicut(6), WHS(1), Pacca Checkdam(10) in GP Bhainsrodgarh, Shripura, Dhangadmaukala Block Bhainsrodgarh under RGJSY