Loading…
Loading…
4,272 results • Best match
Work of digging pitching and interlocking on the way in Madan dam located in Bhitar Badi in Bayana municipality area
cleaning work of complete premises of surpura dam garden, baradari building, toilet, path-way, land scapping garden and footpath parking
RECLAMATION OF STORAGE CAPACITY OF SOM KAMLA AMBA DAM BY DESILTING OF RESERVOIR DISTRICT DUNGARPUR, RAJASTHAN (Guaranteed Annual Return Contract
Shifting of Public asset Chabutras (Shiv ji, Jind Ji, Mata Ji, Bheru ji, Kshetrpal Ji) at Kherlimaharaj which is affected dur to submergence of Navnera Barrage Project across River Kalisindh Dist. Kota
Strengthening of face wall from ch.1 to ch.10 of Bundi Ka Gothra Dam Tehsil Hindoli District Bundi and Re-construction of Damaged face wall and strengthening of face wall from ch.10 to ch.19.25 of Bundi Ka Gothra Dam Tehsil Hindoli District Bundi
Drain construction work up to the drain near the dam of Johad in Ward No. 4 Meena Padi
1_Construction of Field Bunding(13) on Arable Land, Earthen Checkdam(3), Suken Pond(1), W.H.S.(2), Pacca Checkdam(6) and Renovation of Anicut(1) Work, GP Kewalpura, Bansi Block Barisadari Distt. Chittorgarh under RGJSY
Name of Work Construction of Anicut, CCT, PT, Pakka Checkdam in Village Andok, Bhanwarda, Bhooripara, Haloopara, Khankhariya, Kundiya, Varsala Gram Panchayat Bagayacha, Bhanwarda, Chokhwara, Mohkampura, Patan, Varsala under MJSA 2.0 Phase - II of B
Anicut Renovation (1), Desilting Old Structure (1), MPT(3), Pakka Checkdam(1), Recharging Shaft for Aquifers (1), Restoration of WHS (1), Talab Renovation (2) and WHS (1) in Gram Panchayat -Kuwathal, Kundwa and Pardi
Construction of Anicut (06), Roof Top Water Harvesting Structure (04) and Talai (Talab) (01) in various Villages Gokulpura, Chandrawla, Dungarjya, Zalimpura G.P. Zallimpura, Kotsuva and Dungarjya P.S. Sultanpur Distt. Kota (MJSA 2.2 State Fund)
Construction of Anicut (no. of work 2) AND Pakka Checkdam (no. of work 5) AND MPT (no. of work 1) AND PT (no. of work 1) under MJSA 2.2 in Project Area P.S.- Nainwa
Construction of NRM works under PMKSY 2.0 WDC-4/2021-22 Amrit Sarovar (2), Anicut (7), WHS Cum Rafat (7), Talai (Talab) (3) and Farmpond (3) at various Villages of P.S. Sultanpur District Kota.
Survey,Planning,Designing and construction of Kasarwadi Anicut across Anas river and solar based MicroIrrigastionScheme at MuniyaKhunta Teh.Sajjangarh Dist.Banswara and its OandM for the period of 10 years on EPC Single Responsibility turnkey basis
9_Construction of WHS / Anicut Rnnovation works (7) , PCD (4) ( Total Works 11 ) Gram Panchyat Kana Khera, Phalasiya, Bhupalsagar and Jashma Block Bhupalsagar Under Project MJSA 2.0 Phase 2nd Water Conservation Cess Fund District Chittorgarh
1 Construction of Anicut 8 work PCD 4 Work Total Works 12 Gram Panchyat Bhadesar Asawara Potla Kalan Nannana Bhalundi Block Bhadesar Under Project MJSA 2 Phase 2nd Water Conservation Cess Fund District Chittorgarh
Construction of Pasture Development (Overseeding of grassland, fencing, gate, Chowkidar Hut, Water Tankfb and Earthen check dam in Adol (RGJSY)
Repair and Renovation Of Todi anicut
Construction of Field Bunding, Peripharal bund, ECD and waste weir in Gram panchayat Bhooda, Bhuleri, Rampura, Itolli, Jamdoli, Reni, Saloli, Tehtra, Dera, Perbaini in IWMP 30/2013-14 P.S. Renni.
Construction of Pakka Checkdam, Field Outlet (Waste Weir), Bawdi and Talab Renovation at villages Nimola, Khatoli, Farera, Lakhani and Jatwada G.P. Neemola, Khatoli and Jatwada Panchayat Samiti Itawa Distt. Kota
Rate contract of providing lying jointing and testing HDPE/DI pipe line including defect liability period of one year at Division Weir in Urban/Rural area District Bharatpur.
Rate contract of providing lying jointing and testing HDPE/DI pipe line including defect liability period of 1 year at Division Weir in Urban/Rural area District Bharatpur.
Construction of Earthen Check Dam, DSMP and Bench Terracing at Gram Panchayat Dhamniya, Bharev, Laku Kaleva PS LASADIYA ( By IWMP 20)
Urgent Repair of Damage Portion of Patti Chandipur I Padliya Micro Dam PS Manoharthana Distt Jhalawar (Under 20 Micro Irrigation Project)
Earthen Check Dam,Farm Pond,Sunken Pond And RTWHS, other water harvesting Structures under MJSA 2.0 Phase- IInd Block Malarna doongar
Earthen Check Dam,Farm Pond,Sunken Pond And Talab Renovation, other water harvesting Structures under MJSA 2.0 Phase- IInd Block Bamanwas
Repair and renovation of existing 4 nos anicuts in downstream of Moti sagar Dam under Bisalpur Project Telhsil and District Tonk
Immediate Restoration work of Tordi Puliya at Km. 60 (Near Tordi Sagar Dam) on Dudu Chhan BOT Road (SH 37 A)
Mitti Ke Check Dam, Farm Pond, Periferal Bund, Field Bunding and Water Conservation Work under Block Sawai Madhopur District Sawai Madhopur
Construction of Bedach Ka Naka Dam for Rural Water Supply Scheme of 11 MH and 48 OH Block Kumbhalgarh district Rajsamand
CONSTRUCTION OF PAKKA CHECK DAM AND GABION STRUCTURE AT W.C. PARAPEEPLI, RANAYRA UNDER PMKSY-2.0 (WDC-3) P.S. DAG DISTRICT JHALAWAR
Upkeeping of High Mast LED lights , Training Walls Lights, Street Light on Periphery Road and CCTV Cameras system of Bisalpur Dam
Construction of Farm Pond, Renovation / Restroration of WHS, Field Bund, Recharge Shaft for Aqifires and Pakka Check Dam in PS Chhabra
Jungle And Silt clearance of Canals of Arwar And Nahar sagar Dam for Rabi Irrigation 2021-22 Under M And R
Operation and Maintenance work of Regional WSS of Villages Peeth-Simalwara enroute 11 Villages from Amarpura Dam, Tehsil Simalwara District Dungarpur
Balance work Shifting work of Dhoinda Minor of RMC of Rajsamand Dam from ch 134 to 200 Tehsil-Rajsamand Distt-Rajsamand
RGJSY Phase 1 ( Jaswantpura Block ) Contour Continuous Trench (CCT) , Pakka check Dam, WHS and Sub Surface Barrier in Gram Panchyat Tatol
Urgent repair and Oiling greasing and gauge painting of Kalikhar Dam during rainy season year 2023-24 Tehsil Manoharthana District Jhalawar
Operation and Maintenance work of Regional WSS of Villages Peeth Simalwara enroute 11 Villages from Amarpura Dam, Tehsil Simalwara District Dungarpur
RFQ 10292 OPERATION OF PUMP AT SUMP NO 2 AND SEEPAGE PUMPING STATION NUMBER 2 AT TAILING DAM DURING 2023-2024
Oiling and greasing of 18 Nos radial gates,Service well gates and Gantry Crane of Bisalpur Dam for Year 2020-21
Urgent Replacement of Components of Radial Gate no. 3 and 8 including Repair of Stop log gate at Jawahar Sagar Dam
Silt, Jungle clearance and quarry rubbish work of Left Main canal Distributary No. 1 Ch. 0 to 250 of Bethli Dam
Silt, Jungle clearance and quarry rubbish work of Left Main canal Distributary No. 2 Ch. 0 to 250 of Bethli Dam
Operation and Maintenance work of Regional WSS of Villages Peeth Simalwara enroute 11 Villages from Amarpura Dam, Tehsil Simalwara District Dungarpur
Operation of Radial gates and Machinery during monsoon season (15June-15 Oct.) at Jawahar Sagar dam for the year 2024-25
Construction of Earthen check dam ,MPT ,DSMP at Gram Panchayat jodhpurkhurd, sajnot payra, bhabrana, ghated,matasula PS jhallara ( By IWMP 30)
Devolopement of Public Facilities as repairing work at Surya Mandir and Tourism facilites at Ranakpur Dam of Sadri, Desuri, Pali (RAJ).
Jungle and silt clearance of Lahsi Dam main canal RD 9600 m. to 10200 m. and minor No. 1 and 2
Development of katcha drainage work for Banetha to Dam site road Road of Isarda project , Village- Banetha, Tehsil -Uniyara , Dist -Tonk
Survey, Design and Construction of Kunjay Gated Dam on Karai River with Solar based Sprinkler Irrigation System Tehsil Shahabad District Baran.