Loading…
Loading…
4,272 results • Best match
Anicut, PCD, ECD and Anicut Renovation in villages -Chheench, Hamerpura,Itauwa, Pateliya, Bodigama and Pandeliya GP - Chheench, Jalda, Itauwa, Bodigama and Pindarma Block- Bagidora
Construction of Anicut, Pakka Checkdam IN VILLAGE Ramgarh, sakrinal
Work of Conversion from HP to piped WSS Bevar n WSS Pali Tehsil Weir to provide FHTCs including one year Defect Liability Period under JJM in the jurisdiction of PHED Division Bayana Distt. Bharatpur.
Consultancy work for Preparation of Detailed Project Report(DPR) including land Acquisition for Construction Bhusawar Bye Pass ( Chhoukarwada Road at Kanchanpura to Weir Bhusawar Road Via ItamdaMoosepur) length 4.50 km (Project cost Rs. 33.50 crore)
Construction of Pakka Check Dam/ WHS Work Gram Panchayat Kavita and Rama Village Barodiya and Jindoli Panchayat samiti Badgaon (RGJSY State Fund) District Udaipur (Raj.)
Lining Work of Channel (Gajadharpura STP To Kalakh Dam) Ch 1350 m to 2070 m and 2370 m to 15240 m Bandi River District Jaipur
Rate Contract for Hiring of tractor driven burma and coffer dam for alternative arrangement of water supply during canal closure period 2026 under UWSS Loonkarasnar
Flood Damaged work of Nahargarh talab ki dam and canals ki chain 10 to 80 tak repair work of main canal and minor (1.50 Km.)
Supply Installation, Testing, Commissioning and Maintenance of supervisory control and data acquisition (SCADA) at Jawahar Sagar Dam of WRD Rajasthan under National Hydrology Project (NHP)
Construction of Khadeen with waste wier / Pipe Outlet (10 Nos.) and Earthen Check dam (01 Nos.) in W.C. Devandi, Village Devandi, P.S. Siwana, District Barmer.
Estimate for emergent Jungle and Silt Clearance and Minor repair for regulation of LMC and RMC of Hamjakheri and Chachakheri Dam of Sub Division Pratapgarh
Rejuvenation and strengthening of existing 4.1 MLD Filter plant at Nandsamand dam, UWSS Nathdwara, inluding twelve months defect liability period on single point responsiblity basis.
Operation and Maintenance work of Regional WSS of Villages Peeth Simalwara enroute 11 Villages from Amarpura Dam, Tehsil Simalwara District Dungarpur NIT 207/2024-25
Renovation and modification work of Runija dam Tehsil Hindoli District Bundi and Renovation work of canals of Runija minor Irrigation project Tehsil Hindoli District Bundi
CONSTRUCTION OF EARTHEN DOLA/ BUND/ DAM FOR 100 ACRE NEW RESERVOIR, 30 ACRE PROPOSED PAN AREA PROTECTION AND 90 ACRE CONDENSER BOUNDARY, AT NAWA KYAR
Dismantlling and Shifting work of 132 KV S-C Tonk-CKB Line for Isarsa Dam Project at Banetha Distt.Tonk (Length-7.5 KM. APPROX.) (Deposit work)
Drinking water supply project for providing FHTCs in 36 villages and 3 towns Sirohi, Pindawara and Bhanwari through Battisa Dam of District Sirohi under JJM
Renovation of Canals of Kejad dam and Diversion of Mansoon surplus water to pander talab through canal no 4 PS Sarada Distt salumber phase Ist
Planning,Design and Construction of anicut and Solar based Micro Irrigation Schemes at Hakdi Ghati and Pawati ka Vara GP Bharkundi on Jakham Riverof District Pratapgarh and its OandM for a period of 8 years on EPC single responsibility turnkey basis
Work of P/L/J testing and commissioning of Pipe Line, Construction and Commissioning of TW, RCC Reservoir, FHTCs etc......Conversion from HP to piped water supply scheme Mokhroli, Tehsil Weir, Distt. Bharatpur
Work of Conversion of HP to piped WSS Mudiya Gandhar to provide FHTCs including one year Defect Liability period under Tehsil Weir under JJM in the jurisdiction of PHED Division Bayana Distt. Bharatpur
Work of Conversion of HP to piped WSS Mudiya Jat to provide FHTCs including one year Defect Liability period under Tehsil Weir under JJM in the jurisdiction of PHED Division Bayana Distt. Bharatpur
Work of Conversion from HP to piped WSS Nagla Bandh n WSS Singhrawali Tehsil Weir to provide FHTCs including one year Defect Liability Period under JJM in the jurisdiction of PHED Division Bayana Distt. Bharatpur.
Construction of Anicut in village- Khatwa GP- Barliya Block- Anandpuri
Construction of Anicut in villages- bariya GP- malana Block-arthoona
Anicut repairing works at village Bhawad GP Bhawad PS Baori
ROOP TOP TANKA , FARMPOND ,MPT , TAALAI, ANICUT , ECD , KHDEEN NIRMAN
Construction of PCD, WHS ANICUT AND CCT n MJSA 2.2Desuri
Watershed Development and Soil Conservation Work (Construction of PAKKA ANICUT)
Raising of existing road in submergence area of Roshanbari Dam from Sunel-Raipur Road to Kotrapratap of Roshanbari MIP Gram panchayat Semla, Teh. Sunel, Distt. Jhalawar.
Construction work of Toilets/Urinals at various places in Nagar Palika area (Cinema Chouraha, Balram Chouraha and Dam side / Kota Barier / 16 Nos. Wadhwa ji shop)
Supply Installation, Testing, Commissioning and Maintenance of supervisory control and data acquisition (SCADA) at Rana Pratap Sagar Dam of WRD Rajasthan under National Hydrology Project (NHP)
Flood Damaged work of Chhatrapura talab ki dam and canal ki chain 14 to 80 tak and repair work of main canal and minor (2.4 Km.)
Raising and strengthening of existing road of affected villages sarthal to kharan majra kakodikheda, Baday, Achalpura, and Bhavpura under submergence of Parwan Dam in district Baran
Repair work of main canal and minor between chain 332 to 565 of flood damaged main canal of Gopalpura Dam (On both side bank 59.86 Km.)
Construction of MPT, PT, Recharge Shaft, Pacca Check Dam in Gram panchayat Bhooda, Bhuleri, Rampura, Itolli, Jamdoli, Saloli, Tehtra in IWMP 30/2013-14 P.S. Renni.
Additiional work of Dismantlling and Shifting work of 132 KV SC Tonk CKB Line for Isarda Dam Project at Banetha Distt. Tonk Length 3.5 KM. APPROX
Consultancy Services for obtaining wildlife clearance from Ministry of Environment, Forest and climate change MOEFandCC for the construction of Doongri Dam Tehsil Khandar district Sawai Madhopur
Flood Damaged work of Kalisot talab ki Dam and canal chain from 10 to 165 tak And repair work of main canal And minor (5.80 Km.)
Repair work of main canal and minor between chain 181 to 332 of flood damaged main canal of Gopalpura Dam (On both side bank 38.53 Km.)
Construction of Shamshan Ghat Shades for rehabilatation Colonies Dudakali, Dadiya, Tamoliya, Sarankhedi, Sohanpura, Talyabadi and Raghunathpura of Takli Dam, tehsil- Ramganjmandi, under Takli Medium Irrigation Project
Construction of WHS/Pakka Check Dam in village Navalsingh ka Guda,Kaliwali in G.P Parmada and in village Bemala G P Bemala PS Kurabar (RGJSY-I)
Consultancy Services for obtaining Forest clearance from Ministry of Environment, Forest and climate change MOEFandCC)for the construction of Doongri Dam Tehsil Khandar district Sawai Madhopur
Flood Damaged work of Mahodari talab ki dam and canals ki chain 10 to 90 tak and repair work of main canal and minor (5.20 Km.)
Watershed Development and Soil Conservation work (M.P.T., Med Bandi, ECD, Pakka Check Dam) G.P. Dhambola G.P. Saddiya G.P. Shithal G.P. Dhuved G.P. Gada Patta Peeth PSSimalwara
Construction of Earthen Check dam , Field Bunding and Sunkun Pond in Gram Panchayat Baan kalan, Mallara, Shyampura, Semari, Surkhand Khera and Badgaon of (RGJSY) SEMARI block
Watch and ward of Rest House ,Gauging,Oiling greasing of sluice gates and supply of earthfill bags at Gararda Dam, Dist.- Bundi for Year 2026-27
Utility shifting of 33/11 KV LT Line at Sunel Samariya Gelni Gelana Rajgarh dam from km 29/200 to 52/800 MDR 179 Distt. Jhalawar