Loading…
Loading…
4,272 results • Best match
bid no 04 Construction of Anicut and Pakka Checkdam in villages Jher Moti , Bordabra GP Jher Moti Block Gagartalai
Construction of Anicut 02 No, MPT 02 No PT 03 No under MJSA 2.2, Ex.En. WDSC Block Neemkathana, Sikar
Construction of Anicut 03 No, MPT 01 No PT 01 No under MJSA 2.2, A.En. WDSC Block Patan, Sikar
Supply Erection Testing and Commissioning of Wall Penal mounted Non Contact Clamp on Fixed Type Ultrasonic Water Meter cum Flow Meter for Intake River Water System Parvati Bethali and Hinglot Dam Pump House Unit 1 to 4 CTPP Chhabra
Repair Work of Kalitalai, Raghunathpura, Asaondiya, Nandpura, Sunwas-II, Borband, Kalyanpura, from RD 0 to Tail off-taking from the LMC, Raipur, Sunwas Distributary and Minors off-taking from RMC Fatehgarh, Khejrapur Minor-I and II of Chauli Dam
refer bids
refer bids
BID09 Construction of Anicut Renovation and WHS Renovation in villages- Bordabra, Jhermoti and Rola GP- Jhermoti and Lankai Block-Gangartalai
Pucca Work - Recharge Shaft Works and Anicut/PCD Works (Total 18 Works), GP - Satola, Karanpur Kalan, PS- Chhotisadri (WDC-2)
Laying of R.C.C. pipe line Form STP to Dam
Construction of Mini Percolation Tank and Masonry Check Dam
MJSA 2.3 NRM WORKS
Water Supply Project of 353 villages Chikhli, Simalwara Jonthary and Galiyakot block of District Dungarpur form Kadana Back Water (Mahi Dam Package -2 cluster and VD system including FHTC under JJM with OandM for 10 Y after DLP of 1 Y
Consultancy Services for Preparation of Survey Plan prep. DPR work for Const. of HLB (across Back Water of Isarda Dam) on Banas River between Sheopuri to Arniya Kedar Roadm Chironj Mandawar Road incl. village Roads (length Approx 30 kms) in Dist.Tonk
Proposal for making coffer dam in running flow of canal at RD 243 of Suratgarh branch (IGNP) and Hiring of Tractor driven berma for filling RWST of various schemes under JEN Jaitsar Sub. Dn. Srivijaynagar Dn. Anoopgarh (Canal Closure 2026)
Estimate for Reconstruction Of Interloking Tiles to be Required Cutting for laying drinking water Pipeline on Various On Nagar Palika Mahwa Roads Under Water Supply Project for work of Transmission Main From Isarda Dam To WTP, IPS Bagri and CWR From
131-Proposal for replacement of rising main pipe line from Pachanpura dam intake well to WTP Chand Ji Ki Khedi 1 OHSR and other works in Reg. water supply Scheme Pachanpura Block Bijoliya Distt. Bhilwara on single point responsibility turnkey basis
WSP of 367 villages Pkg02 of Blocks Jhallara119 Salumbar90 Lasadiya62 Kurabad66 and Semari30 villages of Udaipur district from Som Kamala Amba Dam Cluster and VD System including FHTC under JJM With OandM for 10 Years After DLP of 1 Year
Construction of Pump House with intake at Mez Anycut, rising main, delivery cistern, tunnel and feeder drain up to submergence of Galwa dam, Head work at Galwa, feeder up to Isarda submergence, Modification of Galwa River, Construction of Pump House
Bids for The Retrofitting work for providing water supply through FHTC as per JJM guidelines in 202 Main Habitations and 355 Other Habitations of Ajmer Rural, Arain and Silora Blocks of District Ajmer from Bisalpur dam System under Jal Jeevan Mission
Retrofitting work for providing Water Supply through FHTC as per JJM guidelines in 255 Villages of Bhinay and Masuda Block District Ajmer from Bisalpur Dam System under Jal Jeevan Mission with Operation and Maintenance for Ten (10) Years after Defect
WSP of 367 villages Pkg01 of Blocks Jhallara119 Salumbar90 Lasadiya6, Kurabad66 and Semari30 villages of Udaipur district from Som Kamala Amba Dam Intake well WTP and including entire transmission system up to OHSRs under JJM With OandM for 10 Years
Consultancy services for GAD preparation and DPR for Strengthening and Widening Work Ghosunda Dam Choraha to Singhpur via Satpuda Gadri Khera (Satpuda) to Kanthariya, Netawal Maharaj, Bejnathiya, Chapri Km. 2/300 to 4/800 and 10/300 to 20/700.
Construction of Pakka Checkdam and Anicut Renovation in village- Amlikhera,Laxmangarh Jhari, Parla Ganeshilal GP- Bor Khera, Laxmangarh jhari, Chacha kota
bid no 01 Construction of Channel lining (water course) and Anicut renovation in villages- Amla, Mundri. GP- Jher, Mundri, Block-Anandpuri
Motor or Painal ka rakh rakhav and Dam Cleaning work
Supply and Transportation of material 0 to 50 andla dam
Supply and Transportation of material for hamawas dam kantra canal
Construction of LMC of Ambamata Dam Malpur Village GP Malpur
RESTRENTHENING AND FOREST CUTTING WORK AT PUNDLU DAMDAM
Villages-Heengi,Pilodi,khedla,Pancholi,Murlipura,Kailai,Sikrai,Kundera Doongar,Sikrai Doongar,Mundiya kheda,Namner,Mored,Geejgarh,Bujot,Patan,Chainpura,Jaisinghpura,Ghoomana,Ghadoli,Ghadi,jagsaypura, Banepura.
O and M Work Of Intake Pump House,Treatment Plant, Pipe line, Pump Houses at Various places,T/Wells, Open Wells, GLRs and OHSRs,Valves etc. of UWSS Nathdwara from Nandsamand Dam, Including Handling District Rajasmand For a Period 1 Year on SRB.
Work Of Augmentation and Strengthening of Cluster WSP Of 82 Villages from Survaniya Dam of Block Bagidora Banswara and Talwara Of District Banswara Under JJM With O And M For 10 Years After Defect Liability Period Of One Year On SPR Turnkey Basis
Bids for Construction of Intake, RWR , WTP at Masi Dam, Pump house and connecting it with CWR for Conjunctive use including O and M work for ten years after one year Defect liability Period for Bisalpur-Niwai- Tonk WSP under JJM Package-III
WSP of 353 villages Chikhli Simalwara Jonthary and Galiyakot block of District Dungarpur form Kadana Back Water Mahi Dam Pkg-1 intake well WTP and entire transmission system up to OHSRs under JJM with OandM for 10 Y after DLP of 1 Y
WSP of 250 villages 238 Villages of Ghatol block and 12 enroute villages of Banswara block of District Banswara from Mahi Dam Pkg 02 Cluster and VD system including FHTCs under JJM with OandM for 10 Y after DLP of 1 Y
Bid no 02 Construction of Anicut and Pakka Checkdam in villages- Khera, Sarei Choti, Vajwana GP- Khera, Sarei Choti, Vajwana Block-Garhi
BID6Construction of Pakka Checkdam and Renovation of Anicut in villages Borwat Malwasa Choubison Ka Parda GP Borwat Malwasa Umari Tamatiya Block Talwara
bid no 04 Construction of Anicut, Pakka Checkdam and DSMP in villages- nathji ka garha, kherdipara, negred GP- kherwa, goliyawara Block-Ghatol
BID20 20. Construction of ANICUT ,DCCT, PERIFERAL BUND ,DIVERSION CHENNEL in villages- NADIYA, DERI , FEFER GP- NADIYA, DERI, FEFER Block-choti servan
Watershed Development and Soil Conservation Work (Construction of CHECK DAM) PSBASOOR
Watershed Development and Soil Conservation Work (Construction of CHECK DAM) PSMANDAV
Villages-Heengi,Pilodi,khedla,Pancholi,Murlipura,Kailai,Sikrai,Kundera Doongar,Sikrai Doongar,Mundiya kheda,Namner,Mored,Geejgarh,Bujot,Patan,Chainpura,Jaisinghpura,Ghoomana,Ghadoli,Ghadi,jagsaypura,Banepura.
MJSA 2.3 NRM WORKS
Pucca Work - Recharge Shaft Works, Anicut cum causeway and RTWHS (Total 11 Works), GP- Narani, Gagrol, Kesunda, Semrada, Carunda, PS- Chhotisadri (WDC-3)
ANICUT,GABION, DIGGI, PCD, TANKA, RTWHS, MPT, PT, CVH, SSB, WHS, DEEP CCT, PRT, DSMP WORK AT GP-BHATUND AND BERA, PS-BALI
SSB,NADI, SUNKUN POND , ANICUT,KHADIN WITH PAKKA WEST WEAR FARM POND , TANKA WITH AGOR AND ROOPTOP TANKA UNDER PMKSY 2.0 BLOCK AHORE