Loading…
Loading…
2,409 results • Best match
Replacement of bearing of 280KW(CNE-33), 990 rpm V.T Pump no 5 and 630 amp MCCB with of allied works at Intake (Raw water)pumping station near Durgapur Barrage Block Borjora, Dist Bankura under Bankura I,II and Barjora Block under BMD PHE Dte.
Supply delivery at site 3 nos 400 mm dia MS column pipe and fittings for 280KW,990 rpm V.T Pump Motor set (at Intake (Raw water) pumping station near Durgapur Barrage Block Borjora,Dist Bankura under Bankura i,ii, Barjora Block under BMD PHE dte
M R to various canals including operating and guarding of Cross regulator gate at Ch.182.50 of TSMC N and ch.454.50 of TSMC N and Head regulator gates of TSMC N during Rabi irrigation under Tarafeni Barrage Section and Silda Section-I of Silabati
Repair Maintenance of 3 Nos Flap Shutters and 3 Nos Draw Shutter at Indira Colony under Ward No 01 of Jalpaiguri Municipality on the left bank of river Karala under the jurisdcition of TBESD I of Teesta Barrage Electrical Division for FY 2025 26
Construction of concrete road, including culvert, towards the H/o Rabin Ghosh and construction of Protection wall in the both side of the dam. Part No.12,Narna-XI
Supply and Installation of spare parts for repairing of damaged hoisting system at spillway gate no01, 06 of Silabati dam ,to be executed by Kangsabati Mechanical Division,Khatra,Bankura.
Excavation Of Water Harvesting Structure Mouza- Nauria dam J.L- 671 Plot No -568 in Jhargram Block in Jhargram District under RKVY 2023-24 of A.D.A (Admn) Soil Survey, Medinipur.
Restoration of Head Regulator room of HMC, adjacent staircase and Head regulator gate allied civil work under Dam Section of Hinglow (I)Sub Division during the year 2018-19.
Slope stabilisation work to protect landslide at 15.15 km of Kalijhora Dam to Mandir Khola Road via Panbu Dara Road under Kalimpong Division, PWD in the district of Kalimpong
Supplying labour for operation of gates of Kankalitala Check Dam and maintenance of Rest Shed under Bolpur (I) Sub Division of Mayurakshi South Canals Division during the year 2023-24.
Excavation Of Water Harvesting Structure Mouza- Nauria dam J.L- 671 Plot No -310 in Gopibllavpur-I Block in Jhargram District under RKVY 2023-24 of A.D.A (Admn) Soil Survey, Medinipur.
Supply of labour for operation of head regulator gates and guarding of Maliarajore Dam in connection with Kharif Irrigation-2025 under P.S Block-Gangajalghati, Dist. - Bankura of Asansol Irrigation Division.
Reconstruction of guard rail over spillway bridge of Barabhum Dam in connection with Barabhum (I) Scheme in Block and P.S- Barabazar, Dist.-Purulia, under Purulia construction Division (Irrgn.) (2nd Call).
Sarbari Tiluri Panchet Dam Road (Panchet Portion)- Repair and maintenance work chainage from 0.00 Km to 7.30 Km (in stretches) in the district of Purulia during the year 2025-2026
Restoration of concrete check dam with Ancillary structure as and when needed at Harirampur Intake Site of Para W/S Scheme under Raghunathpur Sub-Division, Under Purulia Division, PHE Dte.
Cross Dam Road, Widening and Strengthening work from 0.00 Kmp to 1.10 Km under Diamond Harbour Division, PWD in the district of South-24-Parganas during the year 2024 25
DEVELOPMENT OF MARKET LINK CONCRETE ROAD FROM MOYNAPUR PASCHIM PARA TO DAMODER RIVER DAM NEAR MOYNAPUR BAZAR ULUBERIA I DEVELOPMENT BLOCK WITHIN THE JURISDICTION OF HOWRAH ZILLA REGULATED MARKET COMMITTEE
Electrical maintenance work of all electrical installations at Khoai Inspection Banglow and its campus, South Canals Division office, Sub-Division office, colonys, Shyambati Garden and Kankalitala Check Dam at Bolpur.
Construction of Hatibari Check Dam No I at Mouza Hatibari Jl 166 Plot No 121 of Dubrajpur GP within Simlapal Block District Bankura Under RKVY of the yr 2023 24
Cutting and clearing jungles 4 times throughout the year Dam joining area Mechanical and Electrical office area Store area Hospital area SDO Office Hilltop and New colony area at Massanjore
Sarbari Tiluri Panchet Dam Road Tiluri from 0 Kmp to 9_50 Kmp Strengthening work under RIDF XXVII in the district of Purulia under Purulia Division PWD during the year 2020_21
Supply of Unarmed Security Guards of the Premises of Massanjore Dam Mayurakshi Garden and Mayurakshi Bhaban Massanjore Dumka Jharkhand, for a period of one year under Mayurakshi Head Quarter Division
Repairing of automatic plumb line, DAS and networking system for data logger which is installed at drainage gallery of Massanjore dam under I W D during the year 2025-26.
In-situ machining of Journal of vertical turbine shaft to clear ovality formed due to silt erosion of One Unit of Power House
Modified Re-Babbitting of 01 (One) no. Turbine Guide Bearing (TGB) shell for Power House of TLD-III PS
Providing, laying, installation and commissioning of Water treatment plant (20KLD) at cellular wall of TLD-III PS, Rambi
Power house right bank road terrace protection works damaged to due to severe flood occurred in Teesta River
RRT protection wall in 29th mile bazar area at LTD-III Power Station
Maintenance and operation at regulator gate at Anderson weir and ch. 0.00 of Escape channel including maintenance of canal for ch. 0.00 to tail of Escape channel, Village channel and 738 W/C in connection with Boro Irrigation 2022 23 under Head works
Annual maintenance for servicing of hoisting equipment of cross regulatory radial gates at ch-324,540, 730, 874, 1222 of LBMC and sluice gate at ch-130,428,588 at ajoy river and Anderson weir gate at Damodar river under...during the year 2026-27
As per bid document
As per bid document
M/R to regulator gate and structure including canal banks in connection with Kharif Irrigation 2024 from Ch.0.00 to Ch.502.00 of canal Dy-7A/MDBC under Kotasur (I) section of Md.Bazar (I) Sub-Division under MNCDivision during the period July 2024 to
As per bid document
Palliative work on RB of river Ganga for a length of 30 M Near Maya Talkies Ward No 4 in Between Ch 13200 M and Ch 13250 M of DS of Farakka Barrage under Dhulian Municipality, PS-Samserganj, Dist- Murshidabad under JISD-II of GAED-I
Palltve restoration work to reduce the intensity of damages on the RB of river Ganga for a length of 60M in between Ch20300M to Ch20360M Of DS Of Farakka Barrage in Vill- Shibpur GP- Chachanda, Block PS- Samserganj, Dist-MSD under JISD-II of GAED-I
Gajoldoba Barrage to Kranti Odlabari Connector at Baganbari More from 0.00 Kmp to 6.850 Km (except from 4.200 Km to 4.650 km and from 5.200 km to 5.950 km), Strengthening work and from 6.850 km to 11.00 kmp (except 8.150 km to 8.300 km), etc..etc..
M/R to removal of jungle and deposited earth from canal bed in between Ch. 0.00 and Ch. 30.00, Ch. 178.00 and Ch. 233 of Dy no-6 of DBMC under Brahmani Barrage Section of Rampurhat (I) Sub-Division within M.N.C.D during the year 2026-27
Bishkodar Tentulberiya CD 19 Mouza Bishkodar Tentulberiya JL No 91 67 under Jhunjka Gram Panchayat under Block Chhatna in the district of Bankura under WBADMI Project
26028C CASING SIDE DUCT SUCTION EYE FOR FAN DIA 1915 L 0, 26028C CASING SIDE DUCT SUCTION EYE FOR FAN DIA 1915 R 0, 26028C 5 BLADED DISCH DAM PER FOR FAN DIA 1915 RH, 26028C 5 BLADED DISCH DAM PER FOR FAN DIA 1915 LH, 26028C 7 BLADED INLET DI DVC DAMPER FOR FAN DIA 1915 LH, 26028C 7 BLADED INLET DI DVC DAMPER FOR FAN DIA 1915 RH
Construction of Check Dam (W.H.S.) with Pump Set of PMKSY/BKSY 2019-20 at Mouza-Chunagari (Khatian no-352,92, Plot no.-260) in Kulti Block under ADA (Admn), Durgapur, Paschim Bardhaman.
Construction of Check Dam (W.H.S.) with Pump Set of PMKSY/BKSY 2019-20 at Mouza-Chunagari (Khatian no-238, Plot no.-185) in Kulti Block under ADA (Admn), Durgapur, Paschim Bardhaman.
Construction of Check Dam (W.H.S.)with Pump Set of PMKSY/BKSY 2019-20 at Mouza-Chunagari (Khatian no-48, Plot no.-526) in Kulti Block under ADA (Admn), Durgapur, Paschim Bardhaman.
Construction of Check Dam (W.H.S.)with Pump Set of PMKSY/BKSY 2019-20 at Mouza-Mohira (Khatian no-561, Plot no.-432) in Andal Block under ADA (Admn), Durgapur, Paschim Bardhaman.
Ramkanali Railway Station to Panchet Dam Road from 0 kmp to 11 kmp Widening and Strengthening work under Purulia Division PWD in the district of Purulia West Bengal under RIDF XXXI
Construction of Check Dam (W.H.S.) with Pump Set of PMKSY/BKSY 2019-20 at Mouza-Chinakuri (Khatian no-421, Plot no.-124) in Kulti Block under ADA (Admn), Durgapur, Paschim Bardhaman.
Construction of Check Dam (W.H.S) with Pump Set of PMKSY/BKSY 2019-20 at Mouza- Chinakuri (Khatian no-426, Plot no.-791) in Kulti Block under ADA (Admn), Durgapur, Paschim Bardhaman
Protection work to the right bank of River Kopai for a length of 185.00 mtr at downstream portion of Kankalitala Check Dam, G.P.-Kankali, Block and P.S. - Bolpur-Srineketan, Dist. Birbhum.
MR to gate operation of HR gate US gate other canal gates allied works like gauge reading of dam etc in cw Khairabera Irrigation Scheme at Block PS Baghmundi Dist Purulia
Annual maintenance of Mayurakshi Bhaban and its surrounding Garden area MR to pipelines and cleaning of over head reservoirs at Hill Top colony and new colony under Massanjore Dam Sub Division