Loading…
Loading…
7,167 results • Best match
Construction of Boundary Wall and footpath for Shishu Vatika after demolish of abandoned 53 Seater Jan Suvidha Complex in J J Cluster , Chowki No-4 , GTK Road, Azadpur in AC-18 Model Town . PID NO-13128
building work
Restoration of Old Main Campus (Grade II A category Heritage Building) at Raja Bazar, Bose Institute. SH: Works to be executed for immediate protection and i/c demolishing of staff quarter of Main Campus, Bose Institute (Phase-I) by CPWD. SW: Face lifting & renovation of outside of Botany building along the Vidyasagar Street Bose Institute, Raja Bazar, Kolkata. (Remaining Work)
Emergency Work for dismantling and demolishing of damaged parapet wall,damaged balcony facia & window chajja,cornis and protection of roof at AF Block, Sector-I, Saltlake,Kolkata - 700064.Block New Campus (1-6, 17-32, 33-58, 49-64, 65-80, 81-96, 97-112,113-128, 129-144, 145-160) Old Campus Block (273-288, 465-480) Total 12 Blocks.
Construction of New boundary wall and demolishing of old boundary wall for Type III and Type IV campus at N-1, GST Colony, Aurangabad (MS).. SH: Providing and fixing water storage tanks on terrace for Type III Quarters and providing and laying water supply connection for Type III and Type IV Quarters at CGST and Customs Staff Quarters, N-1, CIDCO, Aurangabad
Divisional Engineer/East/Palakkad section: Left over works in connection with : CTR (P) 23.293 Km (between PTJ-SRR, SRR-CLT) such as provision for ballasted track for a total length of 0.800 Km duly demolishing existing damaged CC apron at Rd No.4 of PGT yard ( Km 533.800-534.600 (on B line)) and RCC side drain for a length of 800 mtrs.
Divisional Engineer/East/Palakkad section: Left over works in connection with : CTR (P) 23.293 Km (between PTJ-SRR, SRR-CLT) such as provision for ballasted track for a total length of 0.800 Km duly demolishing existing damaged CC apron at Rd No.4 of PGT yard ( Km 533.800-534.600 (on B line)) and RCC side drain for a length of 800 mtrs.
Demolishing and Reconstruction of roads and repair of side drains in Sultanpur Majra Gaon in Sultanpur Majra Constituency AC 10
Dismantling and demolishing, Flooring, Solid block masonry, plastering, False ceiling, Roofing with Aluminium zinc sheet, Painting, Interlocking, Plumbing, wood work
Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Platering etc
The provision included in this estimate are demolishing brick work dismantling tile work in floor and roof laid in cm
Construction of compound wall using cement blocks including demolishing of the existing damaged brick wall at Peyad Telephone Exchange,Trivandrum
Cleaning of RCC Box Drain, Demolishing of brick work, Dismantling steel work, Cleaning of covered nallah / RCC type box drain
Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Platering etc
Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Platering etc
Demolishing two buildings one RCC building and a tiled roof building and proposed building is of G plus 2 floors
DPR PREPARATION OF Ward No. 07 by demolishing the old complex, construction of shop and construction of modular toilet G1
Demolishing and Reconstruction of RCC Retaining wall on Left Bank D S RD 21650 m of Supplementary Drain Emergent Work
Demolishing of existing single storey and its Reconstruction as triple storied at Satgarh Chaupal at Village Karala Mundka AC 08.
Tree cutting, Demolishing work, Earth work in excavation, Foundation work, Brick work, P.C.C, R.C.C, Fencing work,Synthetic painting work etc.
Demolishing of existing Single Storey Chaupal and Reconstruction of Two Storey Chaupal at Village Tihar in Hari Nagar AC 28
Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Platering etc
SH Demolishing existing boundary wall and Reconstruction of Boundary wall Repainting different Building Blocks Construction of Steel Stair Case etcetera
-DEMOLISHING WATERLOGGED CEMENT CONCRETE ROADS AND PROVIDING INTERLOCKING AND CONCRETING RECONCRETING AND PROVIDING RAINPITS TO VARIOUS ROADS OF Pallithura Ward
Demolishing and Reconstruction of double storey Balmiki Chaupal in Balmiki Basti at Village Bakhtawarpur in Narela Constituency in Distt. North.
Demolishing of existing single storey and its Reconstruction as triple storied Panchayat Ghar at Village Rasoolpur in Mundka AC 08.
Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Platering etc
Demolishing and Re-construction of Double storey SC / ST Chaupal at Village Akbarpur Majra in Narela Assembly Constituency(AC-01).
clearing grass,demolishing CC, earth work,cement concrete, centering and shuttering,steel reinforcement, plastering, engaging labour,NP2 CLASS RCC pipe
Items such as Cubicles in office,blind for windows,painting,demolishing old door and replacing new door ,tile work etc
Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Platering etc
After demolishing Mahendra Complex, scrap material like iron rods, iron shutters etc. is around 8 tonnes at Ward no 13
Demolishing and Reconstruction of wall on left bank in upstream of Rohtak Road Bridge RD 48314 on N G Drain
Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Platering etc
Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Platering etc
Demolishing of compound wall, Earth work excavation, PCC, RR, RCC, Solid block masonry, plastering, primer, painting and G I Gate.
Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Platering etc
Demolishing and Laying of Cement concrete road and IPB various Streets in village Saharwa and all other works contingent thereto
SH- Construction of new 8.00 mtrs span slab culvert at km. 7/660 and demolishing of old damaged slab culvert
Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Platering etc
Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Platering etc
Construction of 40 seater prefab JSC after demolishing existing dilapidated conventional JSC at site services at Hot Mix Plant Khyala.
Demolishing of existing damaged parapet wall and construction of new parapet wall at T-III staff quarters Sec-36A, Chandigarh
Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Platering etc
Demolishing of existing Two storey Community Centre and Reconstruction of Double storey Community Centre at village Nilothi in Distt. West.
Demolishing of existing Single Storey Chaupal and Reconstruction of Two Storey Chaupal at Village Tihar in Hari Nagar AC-28
Demolishing and Re-construction of Dr. Bheemrao Ambedkar Chaupal at village Shahbad Daulatpur in District North in Bawana AC-07.
Demolishing of old/unserviceable item at M Block water store in Vikaspuri AC-31 under EE(C)-22. (Re-invited)
Civil works
Construction of 1st Floor, 2nd Floor, Mumty, Toilet Block at Terrace including finishing work at Ground Floor in Balmiki Chaupal at Village Badli Assembly Constituecny-05