Loading…
Loading…
3,579 results • Best match
O and M Category A 2020-21 khariff Desilting of Supply Channel in Utchuru Big Tank at Utchuru Village in D.V.Satram Mandal of SPSR Nellore District
Desilting and Improvements to Right Main Canal of Madduvalasa Reservoir Project From Km . 36.500 to Km.39.000 near V.R.Peta (V) of G.Sigadam (M) in Srikakulam District.
Desilting of Drain to Eluru road north side from shalini wines to chinthalakodu drain (Muggu bazar cross road junction) in ward no 4 in Gudivada Municipality
Desilting and Repairs to Masonry to Kotha Kalva, Vattapadu, Mittachenu, Veerlagudipadu, Achangari Kalava near ST Colony of Apparaopalem Village in Atmakur Mandal of SPSR Nellore District
O & M Desilting of Modi minor drain from Km 0.00 to 3.630 of Kalavapudi Village Limits under Drainage Section No.3, Elurupadu in West Godavari District
Desilting of drain from Kapadipalem to Railway track near Atmakur Bus stand via Subedarpet Basota Hotel DRDA office in Division no. 51 in Nellore Municipal Corporation
Desilting and Improvements to Right Main Canal of Madduvalasa Reservoir Project From Km . 44.000 to Km.45.500 near Mettavalasa (V) of G.Sigadam (M) in Srikakulam District.
Desilting of Out Fall Drain on Eluru Road Main Drain from Machavaram Anjaneya Temple to Padavala Revu Center Gunadala in 2nd Division.1st Call General Funds
Desilting of Major Drain, Culverts From D No 16/401 at KTR College Road to Tractor Shed at Chenchu Colony in 19th ward of Gudivada Municipality
Desilting and Improvements to Right Main Canal of Madduvalasa Reservoir Project From Km . 49.000 to Km.50.200 near Madhupam (V) of G.Sigadam (M) in Srikakulam District
O&M - Desilting of Atkur Medium Drain in between km 0.000 to km 3.000 and strengthening of Banks at vulnerable reaches in Nandivada Mandal, Krishna District
Desilting of Irrigation canal including both side drains from Phool bagh Community toilet to JL high school in ward no 81 in Anakapalle Zone of GVMC
O&M Such as Desilting of Budameru Above the Velagaleru Regulator near Vellaturu Village limits of G.Konduru Mandal in Krishna District for the year 2022-23.
Providing quarry rubbish Bund formation for desilting of out fall drain along Rama Rajya Nagar Canal from cross road upto Cvr flyover in circle (1st call)
O&M Such as Desilting of Budameru Above the Velagaleru Regulator near Morusumilli Village limits of Mylavaram Mandal in Krishna District for the year 2022-23
O&M Jungle clearance and desilting of Boddedulavanka feeder channel to Peruru tank near Perumallapalli (V) in Tirupati Rural Mandal of Tirupathi District (Item No 06)
Construction of Recharge Trenches, Recharge Pit, Recharge Borewell, Desilting Chambers and Diversion Chambers in Police Parade Grounds under SAM 2.0, AMRUT 2.0 in Tirupati Municipal Corporation.
Desilting of drain from Kapadipalem to railway track near Atmakur bus stand via Subedarpeta, Basota hotel, DRDA office in Division no. 51 in Nellore Municipal Corporation.
Removing of excess Bund and Desilting of Pothuraju Canal from Guntur Road Bridge west side to 60 Feet Road Bridge east side in Ongole Municipal Corporation
Desilting of outfall drain to south side of BRTS Road in 27th Division (By manual means & Mechanical means) in Circle II Area for the year 2023
Desilting, Filling of gullies and Jungle clearance on Mylavaram South Canal in the reaches from Km.35.270 to Km.39.480 under Mylavaram Reservoir of Kadapa Dist
Desilting, Filling of gullies and Jungle clearance on Mylavaram South Canal in the reaches from Km.27.150 to Km.31.475 under Mylavaram Reservoir of Kadapa Dist
O&M Desilting of West Thammileru Drain from Km 2.650 to 3.000 in Ponangi of Eluru for free flow of flood water in West Godavari District
Desilting and Improvements to Right Main Canal of Madduvalasa Reservoir Project From Km . 49.000 to Km.50.200 near Madhupam (V) of G.Sigadam (M) in Srikakulam District.
Engaging of JCB, Tractor and 70 Chain Mounted Machine for Jungle Clearance, Removal of Debris and Desilting of Drains at various places in Division No.14
O&M Such as Desilting of Budameru Above the Velagaleru Regulator near Morusumilli Village limits of Mylavaram Mandal in Krishna District for the year 2022-23
Supply and Delivery of Nalaman with 3 Cubic hopper Capacity for desilting and cleaning of municipal open drains in Vijayawada Municipal Corporation . (15FCG AQ 2021-22)
Desilting of Ravikampadu Major - 1 from Km 0.000 to Km 3.419 & Ravikampadu Major - 2 from Km 0.000 to Km 3.280 in Block No 16 of NSLBC
O&M Jungle clearance and desilting of feeder channel to Chinnacheruvu near Yanamalavaripalli H/o Kamalaiahgaripalli Village in Yerravaripalem Mandal in Tirupati District(Item No 03)
Repairs to Shutters on Kotha Calva and Panta Calva, Desilting of Kelangirivari Calva Offtake of Panta Calva, Prakkapotu Calva Offtake of Hanumanthu Calva in Pithapuram Mandal
Desilting of out fall drain on Pinnamaneni Polyclinic Road from Mother Theresa Statue along Lalitha Jewelery to Service Road in 8th Division. 1st Call General Funds
Desilting of drain from HP Gas road to NTR statue at canal road and flyover down to railway electrical substation in 28th ward of Tadepalligudem Municipality
O&M Such as Desilting of Budameru Above the Velagaleru Regulator near Chilukuruvarigudem Village limits of Mylavaram Mandal in Krishna District for the year 2022-23.
O&M - Desilting of Supply channel and Removal of weed growth from Cherukuvaripalli CD to Bapana Cheruvu near Mittapalli (V) in Somala (M) of Chittoor District
Desilting of Out Fall Drain in Patel Road E/s & W/s from Liberty Hospital to Yanamalakuduru lakulu in 12th & 13th Division.1st Call General Funds
Desilting of Drain from TGP Office SE Office to Railway Track via Urdu Scgool backside baba Nagar at Angadiveedhi in 17th Division of kadapa Municipal Corporation
General funds 2024-25- Engaging of 140 Capacity of Hitachi for Desilting of SW Drains from Sanavulla Compound to Masjid to Pungamma Cheruvu Morava Punganur Municipality
Desilting of Major Storm Water Drain from 16/1039 to 16/1116 and 16/1116 to 16/1184-2 at Masapeta in 26th Division of KMC
Desilting of Yadlapalli channel from west canal to parimi road under the programme of "Jaladhara -Jalahaarathi" in 23rd ward of Tenali Municipality Under Municipal General funds
Desilting of CC Drain along the main roads in 1 to 10 wards and providing way in kacha drains at outfall major drains in Kandukur Municipality
Construction of Recharge Trenches, Recharge Pit, Recharge Borewell, Desilting Chambers and Diversion Chambers in Police Parade Grounds under SAM 2.0, AMRUT 2.0 in Tirupati Municipal Corporation.
Desilting of 19 TE1 Minor 18 L and IR subminor On 19TE-2 of Sambatoor distributory of Mylavaram South canal under Mylavaram Reservoir of Kadapa (Dt)
Puttur Municipality - B.P.S - 2019 and L.R.S - 2020 Fund 2026 and 2027 Desilting of Small and Medium Drains from Ward No.01 to 13 in Puttur Municipality.
O and M to Desilting of Minor Drains infalling into Mekalakaluva Medium Drain and SEA in Nagayalanka Mandal of Krishna district for the year 2021 22
Desilting of Drain from Kapadipalem to railway track near Atmakur Bus stand via Subedarpet Basota Hotel DRDA office in Division no. 51 in Nellore Municipal Corporation
Removal of Jammu, Hyacinth and Desilting of Low level sluice channel (Major irrigation drain) from Mansoor Nagar Arch to Gatchu Kaluva at Sri Potti Sreeramulu Statue
Supply delivery and fixing of stationary desilting machines for removing silt from drainage pumping stations with 3 Months Maintenance in Circle-I area. (Rc.V1-107183/2025)
Desilting of out fall Drain in High School Road from Bandar Road to Autonagar 100ft road via Pantakaluva Road in 11th Division.1st Call General Funds
O&M Such as Desilting of Budameru Above the Velagaleru Regulator near Pulluru Village limits of Mylavaram Mandal in Krishna District for the year 2022-23
Desilting of out fall Drain in High School Road from Bandar Road to autonagar 100ft road via pantakaluva road in 11th Division.1st Call General Funds