Loading…
Loading…
1,189 results • Best match
Silt clearance of Belicharana Minor, Gadi Garh Minor and Rohi Minor of D-9 of Main Ranbir Canal including T-xing.
Jungle clearance of Distributary D-5 of MRC RD 0-6200M and silt clearance from RD 2500-4000M and 5000-6200M
Silt clearance from D9A TFC RD 0 to 1300M Hakkal Khul RD 0 to 2560M and Satwari Khul RD 0 to 2500M
Silt Clearance from Getla khul RD 0 to 4000M Chatha khul Rd 0 to 4150M and Burj khul Rd 0 to 3900M
Cleaning of Intake well Kathanu by way of removal of mud mulba/silt clearance and allied works under WSS Sunderbani Town (SDRF).
Silt Clearance from Disty 7A of MRC between RD 50 to 1500M including construction of crossing for Rama Krishna Mission hospital Jammu
Silt Clearance from Getla Khul RD 0 to 3900M Chatha Khul Rd 0 to 4300M and Burj Khul RD 0 to 4100M
Jungle clearance/silt clearance/removal of mulba from Rajal Main canal from RD 7000 to 7300, RD 7500 to 7850M at spots.
Silt clearance of Khanna Chak Minor of D-10A of D-10 of MRC from RD 5 to 5400 Mtr under MandR.
Silt Clearance from Chatha Khul RD 0 to 4300M and Burj Khul Rd 0 to 4100M
Silt Clearance from Hakkal khul of disty No.D-9A between RD 150 to 2560M at places
Upgradation of lighting systems at Jetty stores and dredging machines of FMD Baramulla.
Silt Clearance of Lord Shiva Branch from RD 0 to 448M and Rathua branch from RD 0 to 2200M of Ghou Manhasa Khul
Silt Clearance from Bhadrore Supply Channel RD 0- 2850 M, Bhadrore Khul RD 3200- 8600 M and Seora Khul RD 0- 2500 M.
Restoration of M-1 of D-5 of MRC by way of silt clearance, walling channel section RD 0 to 150M at places
Silt Clearance from Tawi Feeder Channel RD 1740 to 3600M, Mandal Khul RD 0 to 7323 and Sump Khul RD 0 to 7500M
Silt clearance of Mooley Chak Minor of D-14 of MRC from RD 0 to 2240 Mtr and RD 2950 to 4000 Mtr.
Clearance of Jungle from Distributary, D-5 of Main Ravi Canal from RD 0-6200M at places and silt clearance from 5000-6200M.
Silt Clearance from Karloop khul Rd 0 to 2000M, Kouley chak khul Rd 0 to 1600M and Burj Feeder RD 0 to 450M
Silt Clearance from Harmkund Flora Khul Rd 0 to 380M Dhatriyal khul RD 40 to 3050M and LIS Dhatriyal RD 0 to 100M
Silt clearance of Mooley Chak Minor of D-14 of MRC from RD 0 to 2240 Mtr and RD 2950 to 4000 Mtr.
Jungle and silt clearance from D/S side of Maggar Syphon upto RD 21187 M to RD 21720 M of Main Ravi Canal.
Silt Clearance of Bhadrore Supply Channel from RD 0 to 3200M Bhadrore khul from RD 3200-8600M and Seora khul from RD 0to 2550m
Silt Clearance from Harm kund Flora khul RD 0 to 3500M Dhatriyal khul RD 0 to 3050M and Karloop khul RD 0 to 2000M
Silt Clearance of Karwali branch of New Ghou Manhsa Khul from RD 0 to 2270M and Ghou Manhasan Khul from RD 0 to 6200M
Silt Clearance from Bhadrore supply channel RD 0 to 2800M Bhadrore khul RD 3200 to 8600M and Seora khul RD 0 to 2500 M
Silt Clearance from Marh Bagh Khul RD 0 to 3000M Khalsey chak RD 0 to 3100M and Heera chak khul Rd 0 to 1700M
Silt Clearance from Marh Bagh Khul RD 0 to 3000M Kalasey chak Khul RD 0 to 3100M and Heera Chak Khul Rd 0 to 1700M
Silt Clearance from Budhu Chak khul from RD 0 to 2000M Bhulley chak khul RD 0 to 2000M and LIS Suhagani RD 0 to 750M
Cleaning of Dugwell at Khui Khater by way of removal of mud mulba, silt clearance and other allied work under WSS Lower Kangri (Non Plan).
Silt clearance from D9A TFC RD 1300 to 2825 M Escape channel RD 1300 to 2500 and Khandwal Minor and its sub minor and branches
Cleaning of 02 Nos Dugwells by way of removal of mud mulba and Silt clearance under WSS Nonial and WSS Chowki Hundan (District Capex Budget).
Bathymetry Survey of Wular Lake as part of External Third Party Monitoring of Dredging Work.
Silt Clearance from distributary No 2B RD 0 to 5250M of MRC Khul 8500 RD 0 to 4100M Khul 9500 RD 0 to 5200M of D2B
Cleaning of Collection/Sump Tank at Chajja Thandapani by way of removal of mud mulba, silt clearance and other allied work under WSS Thandapani (Non Plan).
Silt Clearance from Haram Kund Flora Khul RD 0 to 3800M Dhaatriyal Khul RD 400 to 3050 M and LIS Dhatriyal Khul RD 0 to 100M
Silt Clearance from Margh Bagh Khul Rd 0 to 3000M Khalasay chak Khul RD 0 to 3100M and Heera Chak Khul from Rd 0 to 1700M
Jungle clearance/silt clearance/ removal of mulba from Rajal Main canal from RD 5620 to 6350, Rd 6365 to 6490, RD 6510 to 7000Mtrs at places.
Jungle/Silt clearance of M-2 (0-600M) and M-3(0-1000M of D-3 (Distributory-3) of MRC and D-3 RD 0 to 2400M
Silt Clearance of Haram kund flora khul from Rd 0 to 3800M Dhatriyal Khul from Rd 0 to 400 to 3050M and LIS Dhatriyal Rd 0 to 100M
Maintenance of SRs/OHTs/PSTs/Sumps and Silt Clearance by way of Construction of Chain Link Fencing around various structures for WSS Gofbal Kwaikibazar under M and R
Silt Clearance of Hakkal khul, Satwari Khul Rd 0 to 320M Mlitary Farm Rajpura to covered portion at RD 975M downstream trash racks at under culverts at places
Silt Clearance from Hakkal khul market area satwari khul RD 0 t0 205 near Muttans Farm and covered channel part on downstream RD 975 trash racks under culverts
Vehicle mounted manhole desilting machine
Desilting of structures at vari
Desilting of pond at Dandi
Desilting of earthen Field channel
Jungle and Silt Clearance from LIS Bathera D1 RD 0 to 2600M D2 RD 0 to 1650M D3 RD 0 to 650M and Bathera khul Rd 40 to 1850M
Silt Clearance from Tikri Rakhwala II RD 0 to 2100 MLA branch RD 0 to 980 D1 RD 0 to 500M and new Gho manhasan RD 0 to 6200M
Silt Clearance of intakes channels and sumps and removal of Blockades at various sites of Iand FC Sub-division Eidgah (Irrigation Sector) Stage contract for the year 2022-23