Loading…
Loading…
23 live19 closing this weekmost from CCE Potteru Irr.Project,Balimela and Municipal Bodies
23 results • Best match
Providing cement concrete channeling and de-silting within RD 11.700 km to RD 12.000 km of Tatiguda Distributary
Providing cement concrete channeling within RD 0.300 km to RD 0.500 km, de-silting and bank strengthening of Tatiguda S/M-III
Construction of cement concrete channeling within RD 0.200 km to RD 1.200 km, de-silting and bank strengthening of Gumuka S/M-I
Construction of Settling Pond and De-silting of existing Pond, Garland drain, Check dam at Kodingamali Bauxite Mines in the district of Koraput
De-silting to increase water capacity and repairing of ghats of Dumalpada Pond, Badabahali Pond and Kadamkata Pond of Gandapatrapali village under CSR Scheme 2026-27
Providing CC Channeling from RD 0.390 km to RD 0.723 km, de-silting and raising of bank from RD 0.750 km to RD 1.250 km of Chidupalli S/M-III
Providing CC Channeling from RD 0.000 km to RD 0.231 km, de-silting and raising of bank from RD 0.900 km to RD 1.440 km of Mariwada S/M-VII
Street Sweeping, Drain De-silting, Bush Uprooting, De-weeding, Conservancy Cleaning, Door-to-Door Waste Collection (Both Household and Commercial) with Transportation, and Municipal Waste Collection and Transportation in SMC
STREET SWEEPING DRAIN DE-SILTING, BUSH UPROOTING, DE-WEEDING, CONSERVANCY CLEANING, DOOR-TO-DOOR WASTE COLLECTION AND TRANSPORTATION OF MUNICIPAL SOLID WASTE (BOTH HOUSEHOLD AND COMMERCIAL), AND MUNICIPAL WASTE COLLECTION AND TRANSPORTATION (ZONE-3)
STREET SWEEPING DRAIN DE-SILTING, BUSH UPROOTING, DE-WEEDING, CONSERVANCY CLEANING, DOOR-TO-DOOR WASTE COLLECTION AND TRANSPORTATION OF MUNICIPAL SOLID WASTE (BOTH HOUSEHOLD AND COMMERCIAL) AND MUNICIPAL WASTE COLLECTION AND TRANSPORTATION FOR ZONE-2
Providing cement concrete channeling within RD 8.500 km to RD 8.700 km of Tatiguda Distributary and cement concrete channeling in between RD 0.140 km to RD 0.265 km and de-silting of Tatiguda S/M-IV
Repair to fall at RD 0.870 km, CC Channeling within RD 1.050 km to RD 1.322 km, de-silting and bank re-sectioning within RD 1.050 km to RD 1.440 km of T. Salimarikonda S/M-III
Repair of fall at RD 0.060 km, RD 0.224 km, CC Channeling from RD 0.000 km to RD 0.250 km, de-silting and bank strengthening within RD 0.000 km to RD 1.200 km of Ambaguda S/M-I
Repair of fall at RD 0.300 km, RD 0.390 km and RD 1.020 km, CC Channeling within RD 0.280 km to RD 0.540 km and within RD 1.000 km to RD 1.040 km, de-silting and bank strengthening within RD 0.000 km to RD 1.350 km of Eragonda S/M-II
Dredging and Reclamation work for establishment of an Industrial Estate at Paradip, Odisha, India
Maintenance Dredging of Approach Channel, Entrance Channel, Turning Circles and Docks of Paradip Port Authority for the period of 03(three) years i.e for the years 2027-28 to 2029-30
earth work, Dredging , structural work
Dredging, Earth work, Structural work
Construction of C.C. guard wall with bed lining from RD 6530m to 6610m with desilting from RD 4460m to 7060m of Sankara distributary of Talsara Irrigation Project.
Construction of C.C. guard wall with bed lining from RD 1978m to 2000m of Sankara Distributary with desilting from RD 1100m to 4446m of Sankara distributary of Talsara Irrigation Project.
Construction of C.C. guard wall with bed lining from RD 7435m to 7450m RD 7660m to 7670m with desilting from RD 7070m to 11540m of Sankara Distributary of Talsara Irrigation Project.
Sweeping of roads, desilting of drains and Bush uprooting in both sides of roads, and transportation of Municipal Solid Waste including other waste to the identified Disposal Centers located at Wealth Center within Nilgiri NAC area