Loading…
Loading…
42,209 results • Best match
De-silting of outfall drain to Eluru Road from Seetharamapuram to Vijaya talkies, Kothavanthena and Vijaya talkies road(by manual means)
De-silting of out fall drain South side of Eluru Road from police control room to Anjaneyaswamy temple. (by manual means)
De-silting of Aeration tank, Clarifier and outlet chamber of C.C tank at Auto Nagar 10MLD STP in VMC. (3rd call)
O&M De-silting of Ampapuram UT Medium Drain between Km. 0.000 to Km. 2.400 in Bapulapadu Mandal in Krishna Dt.
De silting of Guntu Tippa Drain from Auto Nagar STP to Pantakalava Road in Works Division 3 1st Call General Funds
De-silting of outfall drain to UDA Colony Road from Flood Bank to NSC Bose Nagar main road (by manual means)
De silting of Guntu Tippa Drain from Bayina Bapuji Road to Ryves Canal in Works Division-3. 1st Call General Funds
Jungle clearance of Mallela tank, Mallela vagu& De-silting of Mallela vagu near Mallela village in Thondur Mandal of YSR District.
De-silting of Major drain from Good shepherd school to cambridge school in ward no:80 in Anakapalle Zone of G.V.M.C
De-silting of Bhuddavaram north side drain from Rajeev nagar colony to Pedaoutipally UT at Buddavaram village, Gannavaram M, Krishna Dt.
Construction of C.C. Lining , de-silting and strengthening of canal bank in-between RD 4500m to 6500m of LMC of SIP.
De-silting of settling ponds, earthen and RCC drains in different places of South kaliapani mines in the district of Jajpur
De-silting and Removing the Silt from Vellakuttai Odai by using Excavated Machineries and Tippers in Div No - 45 Kondalampatty Zone.
De-silting and Removing the Silt from Rajavaikal Odai by using Excavated Machineries and Tippers in Div No - 50 Kondalampatty Zone.
De-silting job of Cooling Pond No.2 (Both Hot and Cold-Water Chamber), Package 02 at Bokaro Steel City, Jharkhand
Thiruvalla Municipality Project No 309 De silting and removing pola payal and cleaning Varappalam Thodu for smooth flow of water
De-silting of Storm water Drain and minor repairs to Storm water Drain in various streets of various divisions Zone2 Package 2
T/M of SWD System in R-IV Division during 2020-21. Sub Head-De-silting of RCC Pipe at Vinay Marg towards Nehru Park side by Super Sucker Machine
De-silting/cleaning of sewer line at Unchagaon road, from Rathour Chowk to Punjabi Dharamshala in Ward No. 38,39 and 40, Ballabgarh.
Repair of CD at RD.14.580Km, channeling, De-silting and strengthening in between RD.14.370Km to RD.15.030Km of Wollempalli Distributary Canal.
ESTIMATE FOR CLEANING AND DE SILTING OF MAIN SEWER LINE IN GREEN BELT FROM BIKANER CHOWK TO 37 DISPOSAL UNDER MCG, Recall
Provision of De-silting of 300mm dia. Sewer line through Bucket type Machine in the area of Ward no.7, NIT Faridabad
Cleaning / de-silting of sewer line using by Bucket machine in for Sector 40 in Ward no-13 under Zone 3A MCG.
De-silting and Strengthening of Canal embankments and cement concrete channeling from RD.0.180Km to RD.0.400Km of Mudakhal Su-Minor-III.
Repair of CD at RD.4.500Km, channeling, De-silting and strengthening in between RD.4.000Km to RD.5.000Km of Wollempalli Distributary Canal.
Provision of De-silting of 450mm dia. Sewer line through Bucket type Machine in the area of Ward no.7, NIT Faridabad
Estimate for cleaning/de-silting of nallah mechanically with videography, for rainy season in ward no. 07, Div-I, NIT Constituency, Faridabad
Estimate for De-silting and dewatering of pond near Govt School (small pond) in village Bhatola (Recently transferred in Municipal Corporation Faridabad).
De-Silting by Super sucker Machine/removing of floating material of sumps at various pumps houses under South-West Sub-Division-II
Work contract for De silting work at Channel and Fore bay area of CW pump house at 2x600 MW, SSTPP, MPPGCL, Dongalia
De silting of Disuse canal drain from SDM office Rani Garden to Patparganj Road in W.NO 24E Geeta Colony Sh. S. Zone
Estimate for internal clearance of New Abulkhurana Disty From RD 0-43000 and De-silting of New Abulkhurana from RD 43000-60600
Estimate for the cost of de-silting of Check Dam in 2001 TP at Elival section under Olavakkode Range during 2019-20
De-silting/cleaning of sewer line with help of super sucker machine from Raheja Square to KUMA, Sector-2 at IMT Manesar.
De-silting/ cleaning of Storm water drains of 500mm to 700mm dia by super sucker machine at Ph-III at I.E Kundli.
TCMC - De-silting the Existing Cheannel from Pachiappan Nagar to 200ft Radial Road (Via Bharathi Nagar,Kamarajar Nagar,Thiruvalluvar Nagar,RKV Avenue)
Supply of slabs for missing locations and damaged during de-silting operation at Mpl store in ward no. 165 Madangir South Zone
De-silting of Hari Singh Gurudwara drain from Bala Sweets Ram Nagar to Jagatpuri drain in W.No. 22E Anarkali Sh. South Zone
M/o various scheme under Nazul A/c-II (EZ). Sub-Head- De-silting of S.W. drain at I.P. Extension (Extended area).
De-silting of JJR Nalla, Inderpuri Nalla and Budh Nagar Nalla for (Phase-I Phase-II) in Inderpuri ward No. 140/KBZ.
M/o various scheme under Nazul A/c-II (EZ).Sub- Head De-silting of S.W. drain at I.P. Extension (Extended area)
Sanitation work and De Silting of Nalla and Drains Main Rohtak Bhiwani Road in Kalanaur under flood control scheme and NGT Kalanaur
REJUVENATION AND STRENGTHENING WORKS OF TALAB KALAPIPAL, PANKHEDI (KALAPIPAL) UNDER AMRUT 2.0 SCHEME (PLANTATION, DE-SILTING, TOE WALL, STONE PITCHING,FENCING WORK)
De-Silting and Improvement Works to Existing Strom Water Drain at Various Street in Division-67,68 and 70,Unit-16, Zone -06
DE SILTING OF SEDIMENTED SLUDGE SEWAGE FROM SEWAGE COLLECTION WELL NEAR TO 1900 KLD CAPACITY STP AT GC CRPF AVADI CHENNAI 65
De-Silting and Improvement Works to Existing Strom Water Drain at Various Street in Division-64, and 66,Unit-15A, Zone -06
De-silting of Subway sump and other electrical works at Ganeshapuram Subway in Dr.Ambetkar College Road , Division -71, Unit-17A, Zone-06
De-Silting and Improvement Works to Existing Strom Water Drain at Various Street in Division-65, and 69,Unit-15, Zone -06
Construction of CC lining d, De-silting and strengthening of canal bank in between RD 17000m to 19000m of LMC of SIP
Construction of CC lining d, De-silting and strengthening of canal bank in between RD 13500m to 15000m of LMC of SIP