Loading…
Loading…
42,257 results • Best match
silt clearance work
silt clearance work
silt clearance work
silt clearance work
Silt clearance work
silt clearance work
silt clearance work
silt clearance work
silt clearance work
silt clearance work
silt clearance work
silt clearance work
silt clearance work
silt clearance work
silt clearance work
silt clearance work
silt clearance work
silt clearance work
Silt clearance work
silt clearance work
silt clearance work
silt clearance work
silt clearance work
Nagercoil Corporation Silt Removal work at Karthikai Vadali, Marukalthalai vilai, Poochivilagam, Poovankudieruppu, Pazhavilai,Erubukadu, Thamathukonam, Melasoorankudi,Thengamputhoor at Corporation area
Silt clearance
Engaging of Machinery for De-silting and Removal/ Transportation of silt/ malba etc to SLF from drains under jurisdiction of Ward No. 70N Rampura.
De-silting and Strengthening of Canal from RD.1.950km to RD.2.540Km of Pendulbai Minor and from RD.4.700Km to RD.5.130Km of Ginnipalli Minor and cement concrete channeling from RD.1.950Km to RD.2.100Km and from RD.4.710Km to RD.4.810Km of Pendulbai M
Estimate for De-silting of main Sewer Line by Bucket Machine from Neelam Chowk to Bhagat Singh Chowk, Neelam Chowk to K.L Mehta Collage via B.K Chowk and Neelam chowk to Bata flyover and Bata Flyover to hardware chowk, Ward No.12and14, NIT Faridabad.
De-silting of canal bed from RD 0.00 km to tail, construction of cement concrete channel wall from RD 0.150 km to RD 0.450 km and 15 m length up-stream of fall no.9,8,7,6 and 5 of Ambaguda Sub-Minor of Koimetla Distributary
Major repair of road and flyover nazul A/c-II in project zone.SH-Cleaning and scavenging of road from NH-8 to Ch. 725 i/c de-silting of sumps and its connecting drain of underpass at circulation road of Domestic Airport road connecting Dwarka.
Repair of fall and H/R structures, Cement concrete channel to the U/S of fall and vulnerable reaches, De-silting and Re-sectioning from RD.0.00Km to RD.1.650Km of Purnaguda Minor and from RD.0.00Km to RD.1.170Km of Purnaguda S/M Canal.
De-silting of Mahila colony drain from Geeta colony drain to Jheel chowk Krishna Nagar Drain from Delhi Darbar to Mandir Marg, Radhey Puri Drain H- Block from Radhey puri H-12 to Arjun nagar Dhalao, Drain at Krishna nagar from vijay Chowk to Lajp
AR and MO PWD Roads under Sub Division 3 of Division C and ND Roads during 2020 21 SH De silting and Cleaning of road side storm water drains manually and mechanically with Super Sucker Machine and Providing Diesel Pump Sets for removing water loggin
Hiring of Tractor Trolley (Hydraulic) and JCB with Driver and Diesel for de-silting of nallahs at 60ft road nallah from 60ft road end to in front of Durga Mata Mandir and Chacha Chowk to 60ft road enad in ward no. 6, N.I.T. Faridabad
Repair of fall at RD.4.050Km, RD.5.080Km and RD.5.370Km of Goraspalli Minor, De-silting and Strengthening of Canal embankments and cement concrete channeling at vulnerable reaches in between RD.0.00Km to RD.3.690Km of Goraspalli S/M-III and from RD.1
Jungle clearance, De-silting and strengthening of Canal embankments in between RD.0.100Km to RD.2.370Km of Malavaram S/M-V and cement concrete channelling from RD.1.780Km to RD.1.895Km of Malavaram S/M-V and from RD.0.750Km to RD.0.845Km of Malavaram
De-silting of Pucca Drains i). Along KN Road from Fly Over to Ranga Statue in 26th, 29th, 30th & 31st wards, ii). From Mutyalamma Puntha Road in Yagarlapalli in 24th & 25th wards, iii). From Women's College Road to Railway Track main drain in 28th ward.
Repair of Fall at RD.3.210Km, RD.3.330Km, RD.3.930Km, RD.3.990Km, RD.4.230Km, RD.4.365Km and RD.4.890Km and cement concrete channeling to the U/S of Falls, De-silting and Re-sectioning of Canal from RD.3.180Km to RD.5.430Km of Purunaguda Minor
Repair of fall at RD 0.420 km and RD 0.510 km, Providing CC Channeling from RD 0.570 km to RD 0.720 km of Mariwada SM-V, De-silting and Raising of bank from RD 0.00 km to Tail of Mariwada SM-V and VI
De-silting and Strengthening of Canal from RD.0.300Km to RD.1.890Km of Bapanpalli Minor-I, RD.0.270Km to RD.1.890Km of Bapanpalli Minor-II, Cement concrete channelling from RD.0.580Km to RD.0.700Km of Bapanpalli Minor-I and RD.1.570Km to RD.1.690Km o
Channeling with bed concrete from RD.0.090Km to RD.0.440Km of Pendikonda S/M-I, De-silting and Strengthening of Canal embankments from RD.0.00Km to RD.3.00Km of Pendikonda S/M-I and RD.0.00Km to RD.0.540Km of Pendikonda S/M-II.
O&M - Removal of Weed Growth in Guntur No.2 Drain in between km 0.000 to 5.00 & its minor drains and de-silting of Guntur No.2 drain in between km 10.200 to km 5.00, No.4 minor drain in the village limits of Budampadu
Dredging and Desilting of Shoreline of Dal Lake Near NPL Bund Nishat.
Desilting and Dredging work forebay of intake well at Hirani Under NWSP.
Est.for the cost of de-silting water holes and Check dams in Kizhukanam Section in IWLS during 2025-26
silt clearance and jali (screening) repair of PS 1 of JNVLC for the year 2022-23
Silt clearance/Removal of blown sand from lined canal section of Chandnia mr. 0 to tail
silt clearance of Sonasi minor
silt clearance of Kudhwa minor
Silt clearance of Binnaur minor