Loading…
Loading…
26 live17 closing this weekmost from Pune Municipal Corporation and National Highways Authority of India
26 results • Best match
Consultancy Services for preparation of DPR /Feasibility Report for new Mumbai-Pune greenfield expressway in the State of Maharashtra (Approx. Length 130 km)
Consultancy Services for preparation of DPR / Feasibility Report for Jaigad Port Chiplun Satara (Junction with NH-48) Greenfield Alignment in the State of Maharashtra (98 km)
Surveying and Preparation of DPR on water, waste water and Environment conservation measures at major railway stations/colonies of NGP Division. (ITR, TMR, G, DGG, NAB, CAF, NIR & CWA).
Consultancy Services for preparation of DPR for Widening to Six lane of Dhule Palesnar (MP/MH Border) section of NH-52 in the State of Maharashtra (Approx. Length 89 km.) (2nd Call).
Consultancy Services for the work of Preparation of Detailed Project Report DPR for Upgradation Widening of Ausa Omerga Section of NH548B from Existing 2Lane with Paved Shoulder 2LPS to 4Lane with Paved Shoulder 4LPS from Km 217.400 to Km 233.400 Lam
Consultancy Services for the work of Preparation of Detailed Project Report DPR for Upgradation Widening of Ausa Omerga Section of NH548B from Existing 2Lane with Paved Shoulder 2LPS to 4Lane with Paved Shoulder 4LPS from Km 233.400 to 249.200 Narang
Consultancy Services for the work of Preparation of Detailed Project Report DPR for Upgradation Widening of Ausa Omerga Section of NH548B from Existing 2Lane with Paved Shoulder 2LPS to 4Lane with Paved Shoulder 4LPS from Km 201.400 to Km 217.400 Aus
Carrying out borehole drilling (boreholes) from Km 58 to Km 84 (total length 26 km) for conducting surveys and investigations for preparing the Design, Estimates, and Detailed Project Report (DPR) for the project to supply Krishna River water to dro
Carrying out borehole drilling (boreholes) from Km 29 to Km 58 (total length 29 km) for conducting surveys and investigations for preparing the Design, Estimates, and Detailed Project Report (DPR) for the project to supply Krishna River water to dro
Carrying out borehole drilling (boreholes) from Km 1 to Km 29 (total length 29 km) for conducting surveys and investigations for preparing the Design, Estimates, and Detailed Project Report (DPR) for the project to supply Krishna River water to drou
Appointment of PMC for Improvement of Last Mile Connectivity in the Economic and IT Hub of Hinjewadi, including Preparation of DPR, Detailed Estimates, Drawings, Geometric Designs and Cross-Sections as per Urban Street Design Guidelines, Tender Doc.
Request for Proposal (RFP) for appointment of consultants for preparation of designs and detailed project reports (DPRs) of integrated urban flood risk management project for Greater Mumbai. For Package 3
Request for Proposal (RFP) for appointment of consultants for preparation of designs and detailed project reports (DPRs) of integrated urban flood risk management project for Greater Mumbai for Package 1
Request for Proposal (RFP) for appointment of consultants for preparation of designs and detailed project reports (DPRs) of integrated urban flood risk management project for Greater Mumbai for Package 2
Consultancy Services for Preparation of Detailed Project Report for 4 lane Access Controlled Development of existing 4-Lane from Solapur to Sangareddy Section of NH-65 (Length 246Km).
MPD-Expert services for TPV DPR/NDPR File Name
The Appointment Of Architectural Firm For Comprehensive Architectural Services For Preparation Of Detailed Master Plan, Layout Approval And Comprehensive Design Consultancy For Development Of Academic Blocks And Hostel Buildings (2 Nos.) For VJTI.
Hiring of Consultants - Milestone/Deliverable Based - Infrastructure development plan; DPR, RFP Preparation & Bid Process Management; Yes; Hybrid(As specified in scope of work)
SPECIFICATION OF 7.4 VOLT, 2000 MA", LI-JON BATTERY PACK FOR VERTEL DPR-7000 VHF HB wrr