Loading…
Loading…
16 live6 closing this weekmost from Ministry of Road Transport and Highways and IRD - Chief Engineer
16 results • Best match
DETAILED PROJECT REPORT OF STORM WATER DRAINAGE MASTER PLAN OF GOPESHWAR TOWN , DISTT. CHAMOLI
DETAILED PROJECT REPORT OF G.I.S. BASED DRAINAGE PLAN FOR BANBASA AREA DISTT. CHAMPAWAT
DETAILED PROJECT REPORT OF G.I.S. BASED DRAINAGE PLAN FOR TANAKPUR AREA DISTT. CHAMPAWAT
Consultancy Services for Preparation of Detailed Project Report DPR for Rehabilitation of Tambakhani Tunnel of Length 358.50 m at Km 97.327 on NH-34 (Rishikesh-Dharasu-Uttarkashi Road) in the State of Uttarakhand.
Detailed Project Report EDPR for proposed Ropeway Project at Jageshwar Dham Temple in Almora District Uttarakhand.
Providing Architectural and Engineering consultancy services including Master Plan, Architectural, Site development, Detailed Project Report, construction and allied consultancy services for Construction of Auditorium at M.C. Pry School, ED Block, Pitampura in ward no. 57-KPZ (AC-14), Delhi on Quality and Cost-Based System (QCBS) basis.
SURVEY AND PREPARATION OF DETAILED PROJECT REPORTS (DPRs) FOR REJUVENATION OF THE GAULA AND LADHIYA RIVER CATCHMENTS (5 ZONES), DISTRICT NAINITAL, UTTARAKHAND
Consultancy Services for Preparation of Detailed Project Report for Construction of Major Bridge (Approximate Span 400m) along with its approaches connecting NH-507 with NH-707A near Lakhwad Bend in the State of Uttarakhand
Widening of existing single /intermediate lane to 2-lane with paved shoulder from km. 175.00 to 311.00 (Bataghat to Maletha) on NH-707A in the State of Uttarakhand. (Length 136 km).
widening of existing Single / Intermediate lane to 2- lane with paved shoulder from km 0.00 to km 175.00 (Tyuni to Bataghat) of NH-707Ain the State of Uttarakhand. (Length-175 km).
Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from Km. 0.00 to 235.00 Jyolikot to Karanprayag of NH-109 (Old NH 87Ext) in the State of Uttarakhand.(Length- 235 km).
Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from Km. 0.00 to 80.00 Ghat to Udiyari Bend of NH-309A in the State of Uttarakhand. (Length 80 km).
Rehabilitation and Upgradation of existing road between km 0.00 to km 86.00 Gangotri to Heena from existing/single lane to double lane with paved shoulder specification on Gangotri Uttarkashi-Dharasu road NH34 in the State of Uttarakhand Length 86 Km
Rehabilitation and Upgradation of existing road between km 0.00 to km 76.00 (Bhairoghati-Nelong-Naga-Sonam-PDA-Medikey) from existing/single lane to double lane with paved shoulder specification on road Bhairoghati-Nelong-Naga Sonam-PDA-Medikey secti
Dimensional Consignments (HT-03) of 12-axle configuration carrying approx 100 Tonne Wire Ropes on bridge approaches and curves for the Kedarnath and Hemkund Sahib Ropeway Projects on Rudraprayag-Sonprayag (NH-107) and Rishikesh-Govindghat (NH-07
Empanelment of Third-Party Agency for preparation of PFR, DPR, Tender document, Energy audit and inspection, testing, performance evaluation/ audit of various equipment/ components during pre-dispatch phase and post-commissioning phase, under UREDA.