Loading…
Loading…
7,302 live4,077 closing this weekmost from Directorate of Local Bodies UP and Directorate Urban Administration and Development
7,302 results • Best match
In Ward-93, Kaila Bhatta, work of drain and CC road from Bhai Ji Dairy to Abid to New Mosque and from Qayyum to Tahir, Babudin and Faizan Wali Gali.
Road construction work through interlocking tiles and drain from National Medical Shop to Rakesh house and in the street in front of Pandey in Ward 35 Akbarpur Bahrampur Buddha Vihar.
Construction of CC road and drain from B-124 to B-168 via B-153 and B-152 to B-174 in B Block, Sector 11, Ward 55, Pratap Vihar.
Work of drain and interlocking tiles from Tejpal to Anju and from Vinod Pal to Pushpa Tyagi in Ward-06, Uttaranchal Nagar and from Devendra to Mumtaz house in Deendayalpuri.
Construction of interlocking tiles and drain on both sides of the side track of the road from RDC flyover (Khurana Mortus) to PWD Quarters in City Zone Ward-08, Maliwada.
Work of construction of interlocking tiles and drain from Hari Ram to Sundar Panchal via Yadav ji and from Bittu to Neeraj Tyagi in Ward-13, Ghukna Gali No. 01.
Repair work of drain and CC in the damaged lane from Basanti Bhawan to Aamir Dabas and from Mohammad Razza to Rahul Kanojia house in Kailash Park, Ward 38, Arthala.
Construction of CC road and drain from Billu shop to Raju house and from Moolchand Verma to the park in City Zone, Ward-52 Old Arya Nagar, Street No. 04A.
In Ward 21 Bhowapur village, construction work of drain and CC road from Jagat house to Billa house and from Billa to Shri Ram Medicos and in Sundar Wali Gali.
In Ward-41 Maharajpur, from Khan Medical Store to Sanjay house, from Haji Ghulam Masood to Badi Masjid and in Pal Gali, drain repair and construction work of CC road.
Construction of CC Road and Drain from Exchange Tarouli Main Road to the Front of the House of Janki Dhanuk in Ward No. 14. Under Municipal Council Mau distt. Bhind
Construction of RCC drain in Ward No. 02 of Municipal Council Suar, from Munshiganj intersection in the north direction via Naseer Bhai saw mill to beyond the Chak Rok mod.
Under District Lucknow, Construction of interlocking road and drain from B.N. Lal Road in Srinagar of Ramji Lal Ward to Shivshakti Mandir to Shri Chandrashekhar Mishra house, Lot No 1
Under District Lucknow, Construction of CC road and drain from Euler showroom to Raj State School gate on Alamnagar Para Ring Road in New Haiderganj Third Ward, Lot No 8
THE SUPPLY OF MATERIALS FOR THE CONSTRUCTION OF DEVELOPMENT OF THE STORMWATER DRAIN FROM DASTGIRKHAN SITE IN HALASURU VILLAGE TO HANIF SAAB S HOUSE UNDER VB G RAM G SCHEME
Construction of a CC road and drain covers in Ward No 03 extending from Midhdhi Crossing near Jyoti Sweets via Ramkeshar Bhavan and Shanti to Peter England and Amul Milk
construction of lane/Drain in ward no 5, Gujjar basti , Gole pattan, tehsil marh, District Jammu. Pyt Gango chak. Block-Marh under CD and Pyt for the year 2026 27
Construction of Lane drain from PMGSY Road to NHO Joginder Kumar Mohalla , Ward.No.01 in Pyt. Bhabber Brahmana Block and Distt Reasi under capex PRI for the year 2026-27
(A) S&T estimate in connection with Provision of 1st FOB at Rishikund & Sarobag station. (B) S&T estimate in connection with Provisioning of Existing stair case with 2 nos of lift at PF No- 1 and PF No-2 &3 at same FOB at BGP stn (C) Upgradation of ... and drainage facilities ... & drainage facilities ...
Providing UW Cementitious Grout, Deeper Cavity Filling & UW Pointing to the balance Portion of Bhadra Dam on Upstream Side from Level 2066 ft to 2000 ft & Reaming of Porous Holes, Foundation Drainage Holes, Stability & Resetting of Saddle 1 &2. 2) ... & Drain works ... in drainage gallery. ...
MAINTENANCE OF DRAINAGE LINE AT 9, BAIDYANATH MULLICK LANE, 12, ROY LANE AND DIFFERENT PLACES IN WARD NO-23
Construction of Road including Cross Drainage works and 5 years Routine Maintenance for Grp. 34 (Package No. AS15688, AS15705)
Providing Paver Block Road with drainage and Drinage at Ward No 4 Indira memorial Colony in Rayagiri Town Panchayat.
Construction of 45 Mtr. wide Master Road between Sector 16/17 including Footpath and Drainage in U/E Sonipat
Provn of Breast wall, Provn of Retaining wall, Soling with GSB, Provn of Drainage, Provn of Hume pipe Culverts
NIRMAN KARYA
NIRMAN KARYA
NIRMAN KARYA
(SH- Providing laying jointing and testing of G.I pipe line from spring source Khanori Nallah to Gadi Banani and Gadi Banani to Tandi storage tank of various dia ) Under PDNA code 19267
Construction of side drains and providing and laying Interlocking Tiles in Main Road 25 Futta, D-Block Amrit Vihar in Burari in AC-02.
25 mm PMC ,WBM, Widening, Patch WBM, Patch Grouting, Cross Drainaige Works, Protection Works and Surface Drains along with Road Furniture and Marking etc
Providing CC Road with Drains from Moparthi Bosubabu (H) to Mannava Hanumantharao (H) in Chintapallipadu (V) of vatticherukuru (M) Estimate Cost Rs.7.00 Lakhs
25 mm PMC, WBM, Widening, Patch WBM, Patch Grouting, Cross Drainaige Works, Protection Works and Surface Drains along with Road Furniture and Marking etc
Providing CC Drains and WMM Roads at Beside Decathlon Cross Road And Vijay Collection Cross Road in Div no :48 under AE-8 section
Construction of P.C.C. Road and Drain from Ashok Saini house to Rakesh Acharya Ji house and Narendra house to Faheem in Ward No. 07 Murtjanagar at Nagar Panchayat Moosanagar, Kanpur-Dehat.
Construction of a CC road and drain in Ward Paliya, extending from Gerawan Road passing by the houses of Rajendra, Kallu Rawat, and Rajaram Rawat up to the house of Ramhetu
Construction of PCC Drain Sukul Tudu House Towards Mostan Soren House, Mouza- Kamardanga, JL-77, Plot-122 at Deucha GP Under Md Bazar Panchayat Samity,Fund-15th CFC(CODE NO-142924465)
Construction of PCC Drain at Damra Manasha Mandir to Ghoshal Pukur End, Mouza- Damra, JL-15, Plot-719 at Gonpur GP Under Md. Bazar Panchayat SamityFund-15th CFC,(CODE NO-142919074)
Construction of R.C.C Drain with slab in in Mango ward no. 31 From House of Mangal Murmu to House of Aatish Sharma (Kaveri road Hanuman mandir) Daiguttu and different cross road.
Cutting of drain in depillaring panel No. 4J-8(4J-8A and 4J-8B) in 4A seam for flowing of water for the period of one year at Jhiria UG Mine.
constt of lane with drain and tile work from link road to house of Shiv Kumar W.No 4 Pyt Amb Block Bhalwal under CDF for the year 2026-27 ( BLOCK LEVEL)
(Moulik Nidhi) Construction of C.C. Road and Drain From mama Ki Dukan to Brajendra house Krishna Vihar Colony Gram Mau Zone No. 23 ward no. 63 file no. 495/26X3/6
Maulik Nidhi) Construction of C.C. Road and Drain at From Mohar Singh Yadav house to Ajmer Lodhi house Gram Jalapur, Zone No. 23 Ward No. 63 File No. 496/26x3/6
Construction of a CC road and drain in Ward No. 25, Mohalla Harna Takiya extending from the culvert near Zahid flour mill to Dr. Arshad house at the three-way junction.
Re-Construction of RCC Drain/naala from Police mess to House no. 1129 /22B, House no. 1040 to House no. 786/22B Ward No.3 Division 3A under MCG. Re-call
Improvement work of road by laying drain and interlocking tiles from house G-595 to Vimlesh Agarwal house G-597 in Mohalla G Sector under Zone 6 Ward 23 Housing Development.
Road improvement work by laying drain and interlocking tiles from Raj Rathors shop to Manju Dubey house in Mohalla Guba Garden under Zone-6 Ward-35 Kalyanpur North, Old Shivli Road
948/2026-27 DIVISION49 KARMALARANI TRAINING CENTREEASTSIDE DRAIN MAINTANENCE DMRA NAGAR JONAKAPPURAM PALLI NORTH TO SOUTH NEELAMTHOTTAM PADINJARETHODI KALLELI VAYAL PURAYIDAM OLD PALLI PURAYIDAM FRONT VADDY PANAMOOD PURAYIDAM ROAD VADDY PALLI