Loading…
Loading…
7,205 live4,675 closing this weekmost from Directorate of Local Bodies UP and Directorate Urban Administration and Development
7,205 results • Best match
house of javid ah najar, bashir ahmad and others at upper chan mohalla and Construction of drain near house of Javid ah najar to road , protection bund near house of bashir ah bhat , majid bhat at herpora watakaloo
Construction of Drain from house of Pintu Sk to house of Lalbabu Sk at AILERUPAR (EASTERN SIDE)(S.C.-078) in ward no - 20 within Jangipur Municipality under HFA (urban) as ID Component for the Financial Year 2020 - 2021
Construction of Drain from house of Aalim Imtiaz Banday to house of Mohammad Siraj Para and Construction of of P Bund from house of Ab Khaliq Para to house of Mushtaq Ahmad Para Ward No 4 at Najan
170/25-26 Pachakunnu Azhiyur Vayal road-Drainage improvement
Construction of RCC nala from sanigawan to sajari ward-62 under zone-2
Construction of Nala from Hawaldar house to Haji Aladdin House at vill Salaheri
CONSTRUCTION OF WALL FROM MOKAMPURA TO NAHARIYA NALA 1500 RMT. (6 FEET HEIGHT)
CONSTRUCTION OF WALL FROM MOKAMPURA TO NAHARIYA NALA 1500 RMT. (6 FEET HEIGHT)
ward 09 me rafik ke makan se puliya tak rcc nala nirman kary
ward 16 ramsufhl ke makan se shivani palece tak rcc nala nirman kary
Nirman RCC Nala Rais Ahmad Ke Plot Se Nadi Tak Ward No 15
Cont. Of Boundary Wall on Ganda Nala On Different Places Of M.C Nabha
in ward 5 sebu mobile shop to nihal water factory covered RCC nala
in ward 11 umashanker Maurya house to lochanganj tiraha RCC covered nala work
Construction Of Road And Gutter From House Of Shri Nandkant Thakur To Nala
Reconstruction of Sabir ke khet to nala in barwala road in Distt Muzaffarnagar
Engineering, Procurement and Construction (EPC) work for Integrated Irrigation, Drainage and Water Infrastructure Modernization Project in Sorthi Ghed Phase-2 Package-1: - Construction of Bank Protection Works Sub Package-2: - Construction of Bank ... River/ Drains around ...
Drilling & grouting to body of Talakalale dam including reaming of body & foundation drains.
REPAIR TO FOOTPATH/ HARDSTANDING, DRAINS, CULVERT, ETC.AT 5 AFH UNDER GE (AF) JORHAT
Repair of drains and const. of chambers in Amarpura under ward number -27
Improvement to link drains of Mugura dc including construction of VRB under DIP
Repairing and Maintenance of Motor room and drains at Baniahir under Lodna Area
Const of Drains and Ladikaran at Namdev Jagdale Chawl, Hanuman Tekdi, Bhandup West
Sindh Nallah - Flood Protection work on R/S at Village Shallabugh at RD 90.80 KM to 90.91 KM
Restoration of LIS Rattanpur paras by way of providing Toe/Retaining wall along with the local nallah (Choi).
Rejuvenation of Devika River/Nallah in Udhampur Town Near Shamshan Ghat by way of Installation of Trash Racks
P/F CC PAVERS AND COVERD DRAIN WARD 8-10
Maintenance and Repair works to the drain Flooring at Nggo colony 3rd street, Nggo colony 8th street, SKC Road, OA Ramasamy street, Muthusamy street, ECM Layout, and storm water drain at Deva street in ward no - 34 and 46
139/27- PARAMBINTHALA CHULLIYOOR ROAD RE-TARRING AND DRAINAGE RENOVATION
OM THRIKKAVU TEMPLE ROAD TO ACHARATH PARAMBU DRAINAGE - WARD 29
CONSTRCUTION OF 66 COLONY DRAINAGE WARD 43-General Civil Work
Drainage and allied works at Moaza Humhama near Panchayat Ghar
Foley's Rubber Catheter (for Prolonged Urinary Drainage) Conformingto IS11497 (Q2)
Construction of drainage system at Alsafa colony A (Phase 1st)
Cleaning of drainage system at Various Ind. areas at Pali
Construction of Footpath / tiling including side drainage for Leh City
GENERAL Revised Budget Work 2026 27 20 provision Upgradation work Providng Bit BM and BC Overlay to Pallimukku Eravipuram Road From Ch 0 000 2 600 and Construction of Drain under kollam corporation in Eravipuram LAC General Civil Work
Construction of lane from house of Mohd Yousuf Mir to Main road Construction of Drain from Bashir Ahmad Bhat to Farooq Ahmad Parry and Tile path at new colony and Stairsteps near house of Gh Mohd shah at Goripora
construction of drain from house ofmohd yousuf dar to house ofibrahim dar with p/b near house ofgh ahmad mir,ishaq mir others at lakhripora construction of pbund near house of manzoor ahmad malik, Tariq malik others at lakhripora
Construction of drain with mesh flooring from House of Fayaz Ahmad Mir to House of Jalal-ud-din Sheikh at Tanghar and development of road from House of Shabir Ahmad Dar to Bashir Ahmad Rather at Tanghar Dharambagh A
ward 03 13 15 17 me nali crass ka nirman kary
Ward No. 1 me Covered RCC Nali evam CC Road Karya
Ward No. 16 me Covered RCC Nali evam CC Road Karya
Ward No. 3 me Covered RCC Nali evam CC Road Karya
Ward No. 3 me Covered RCC Nali evam CC Road Karya
Ward No. 3 me Covered RCC Nali evam CC Road Karya
Ward No. 8 me Covered RCC Nali evam CC Road Karya
Kabristan ke pathway Nirman avm nali marmmat sahit Anya Nirman karya
Bodheshwar Mandir to Kanha Gaushla Tak CC Road and nali work
CONSTRUCTION OF RCC NALI KAMLESWAR PAYASI TO LAXCHMI NARAYAN TIWARI HOUSE AT WARD NO 01 NAGAR PARISH