Loading…
Loading…
17,555 results • Best match
Water course x ing at RD 12350 R Baroda Mr. RD 50400 Ishapur Kheri Drain.
Internal Clearance of Butana Bichpari Link drain from RD 0 to tail during 6 2021
Re-construction of W/C X-ing at RD 39022 of Lakhan Majra Link Drain
Unplugging of sewer line from Rampura chowk to HSIIDC Drain in Division-2 under MCM.
Providing and Laying of P.V.C/R.C.C Pipe to cover the drain in ward no.1
Pavement of Street With IPB along with drain at village Pali, Block Khol, Distt. Rewari
Construction of IPB Street along With Drain from Raju Master to Manju Verma in Ward
Construction of IPB Street and drain from AadiGaud Dhramshala to Flats Ward 26 MC Palwal
Construction of RMC Road and Storm Drain line at Jalvayu Vihar, Gurugram under MCG Recall
Repair and Maintanance work various type of Drain, Culvert and Srteet in Ward no. 14
Cleaning of Indri Drain from Killa katzu Pulia to Karnali Gate in MC Taraori Area.
Const. of Drain Type 2 Karam singh to Culvert at Village Bajidpur,Block Saha(Ambala)
Construction of Road Side Drain for waste water in Firni at Village Gadpuri Block Prithla
Repairing of wing walls and parapet of VR Bridge at RD.23177 of Chandeni Drain
Internal clearance of Behlolpur Link Drain from RD 0 to 7250 before flood Season 2023.
Repairing of wing walls and parapet of VR Bridge at RD.4000 of Kotla Drain
Pav of street with IPB and side drain at Village Noonsar Block Behal Distt Bhiwani
Internal Clearance (Slush) of Ramba Link Drain from RD 0-7000 before Flood Season 2021
Internal Clearance of Sankhol Link Drain RD 0 to 1850 for the year 2022-23
Estimate for desilting and jungle clearance of North Possar Drain from RD 00 to 18000
Removal of earth/slush and surface dressing of extension Gatauli Karela drain 0 to 31300
Construction of Water X-ing at RD 19000 and 19400 on Puthi Mundhal Link Drain
Internal Clearance of Ramba Link Drain from RD 0 to 16250 before flood Season 2025.
Providing and Fixing of Iron Jal and Commercial Hardwood at Baghpur Link Drain Pump House.
Scheme for construction of Pump House at RD. 107000 inlet of Old Ghaggar Creek Drain.
Constructing Water Body at village Deverkhana near km 36.820/L of outfall drain No. 8
Construction of IPB Street along with Drain in Bada Mohalla in ward 20 MC Palwal.
Pavements of Streets with IPB and Side Drain at Village Dadsiya Block Faridabad Distt Faridabad
Construction of various street and Drain in village mamidi in ward no. 13 Yamunanagar.(Recall)
Internal Clearance of Ramba link Drain from RD 0 to 7000 before Flood Season 2022.
Providing and Laying of P.V.C/R.C.C Pipe to cover the drain in ward no.13
Repair and Maintenance of various street and drain in ward no.13 MC Samalkha (Recall)
Const. of street and drain from ajay to vita booth ward 06 MC Naraingarh. Recall
INTERNAL CLEARANCE OF MILKDHAN KOTA DRAIN FROM RD 0 TO 3800 BEFORE FLOOD SEASON 2026.
Internal Clearance of Pabana Drain from RD 0 to RD 41100 before flood Season 2025.
Internal clearance of Sheikhpura Manchuri Drain from RD 0 to 31500 before flood Season 2023.
Constructing RCC Trough from Govt. college to outfall into Kahni link drain in village Jassia
Construction of aqueduct at RD 8300 Dubheta drain and Rithal Extension Disty at RD 8100.
Const. of Drain and other GWM work at village Dhani Gopal Block Bhuna Distt Fatehabad
Internal clearance of Pinjora drain in radaur water services Sub division Jagadhri for Year2026-27
Replacement of Bridge cum syphon aqueduct of Hodal Disty at RD 5200 of Deeghot Drain.
Repaire of Street,Drain and pulia in various places in ward no.14 MC Taraori
Internal Clearance of Assandh Main Drain from RD 24000 to 48675 before Flood Season 2020.
Providing and Laying of P.V.C/R.C.C Pipe to cover the drain in ward no.2
Estimate for internal clearance of Pingore drain with silt clearance from RD 16000ft to 13000ft.
INTERNAL CLEARANCE OF HARDA HARDI DRAIN FROM RD 0 TO 10800 BEFORE FLOOD SEASON 2026.
Const of Drain from Ramu house to Sarbhang school in ward no 13 MC Sohna
Construction of type-II drain in various places at Harijan Basti in MC Siwan (RECALL)
Internal Clearance of Mattan Link Drain from RD 0 to 45295 for the year 2026
Construction of road and drain from Nahan Road to Pawan Chada in ward no.11