Loading…
Loading…
17,555 results • Best match
Construction of IPB Streets with drain in village Pinana Block Sonipat Distt. Sonipat Cost 16.79 Lakhs
Construction of street and Drain Bala ji Handloom wali gali in w.no. 15 at MC Panipat
Const.,Repair and Maintenance of Road, Drain Pulliya etc. in Ward No. 07 MC Ferojpur Jhirka
Jungle Clearance and I/C removing obstructions of Muana Link Drain from RD 0 to 15100
Const. of IPB Street and Drain from Sarpu house to Salaheri road in Ward No. 2
Const.,Repair and Maintenance of Road, Drain Pulliya etc. in Ward No. 03 MC Ferojpur Jhirka
Const.of Road and drain H/o Goyal to Rajive House ward no 6 MC Sohna- Retender
IC and Deweeding of Bond Drain R/Side alongwith Bond Disty. from RD 0 to 6000.
I/C of Mundhal Talu Link Drain from RD 0-20000 for the year 2021-22
Estimate for covering the side drain of various road in eastern side of MC Sonepat-Recall
Repair and Maintenance of street, culvert, drain etc. in Ward No. 1 to 15 at Kaithal
Sweeping of Street/ Roads and Cleaning of Drain/ Community Toilets in ward no 01 to 16.
Internal Clearance of silt and slush of Alduka Kurthla Link Drain from RD. 0 to 12500
Internal Clearance of Shimli Link Drain from RD 0 to 4840 for the year 2025-26
Renovation of Pavement of street with IPB and Drain at Village Pali Block Faridabad District Faridabad
Const of street and drain from sunil chopra to lalitvodra h.no 68 gobindnagarin ward no. 18
Estimate for internal clearance and removal of slush from Bhambewa drain from RD 92200 to 132890
Const. of street and drain from madan kalara to anil walia Ward 07 MC Naraingarh. Recall
Estimate for internal clearance of Jatusana Drain from RD 0.000 to 2.000 Tail for Kharif 2023.
Internal clearance of Kidoli Pehladpur Link drain RD 0 to 13000 for the year 2024-25
I/C of west jua drain from RD 1400 to 4150 for the year 2024-25
Pavement of Street with IPB and Side Drain at Village Tikri Khera Block Faridabad District Faridabad
Internal clearance of Munak west Sub Drain from RD 0 to 3700 before Kharif Season 2023.
Estimate for Internal clearance and removal of slush of Bhambhewa Drain from RD 58220 to 132890.
Const. of Brick Rasta from Drain Pull to Shishpal S/o Puran Chand at village - Meoli
Renovation of Pavement of Street with IPB and Drain at Village Manger Block Faridabad District Faridabad
Jungle clearance, Silt clerance I/C of Extention Gatauli Karela Drain from RD 0 to 31300.
Construction of Rcc Retaining Wall of Main Drain Navneet Nagar in ward no 06 Ambala city
Construction of V.R Bridge at RD 136846 of West Juan Drain.(with 10.5m or 34.44ft width)
GE/CHM-75/2021-2022 REPAIR TO DRAIN PATH FENCING AND OTHER MISC WORK AT CHANDIMANDIR
Construction of RCC open trough from RD 19100 to 15335 of Ambala Drain including 04 bridges
construction of raod and drain from Balmiki mandir to H/o Rakesh in ward no.09
Construction of Covered drain on Rambag Road near ram Mandir,Kamla Nagar Kalka in MC Kalka.
Estimate for the work of Reconstruction OF VR Bridge at Rd 6130 of Prithla Link Drain.
Pavement of Rasta with IPB along with drain at village Bhakli II Block Nahar, Distt. Rewari
CONST. OF STREET AND DRAIN FROM H/O HUSSAIN TO H/O JUNG SINGH VILLAGE MUKARABPUR
Cleaning and desilting of strom water drain for year 2026 in ward 17 under MC Gurugram
Const.,Repair and Maintenance of Road, Drain Pulliya etc. in Ward No. 05 MC Ferojpur Jhirka
Estimate for reconstruction of Drain at Yashmin madam wali gali in ward No. 18 Badkhal, Faridabad
Internal Clearance of Kidoli Pehlapur Link Drain RD 0 to 13000 for the year 2022-23
Internal Clearance of Munak West Sub Drain from RD 0 to 3700 before flood season 2026.
I/C, J/C and sludge Clearance of Kalwa Kinana Drain from RD 0 to 19000
I/C, J/C and sludge Clearance of Muana Link Drain from RD 0 to 15000
internal clearance of Hanauri Sub Drain No. 1 from RD 0-11000 before monsoon season 2026
I/C, J/C and S/C of Ritoli Link Drain from RD 0 to 15000
Pav of street with IPB and side drain at Village Saroda Jadid Block Behal Distt Bhiwani
Internal clearance of Balu link Drain from RD 0 to 53150 before Kharif/Flood Season 2024.
Const. of PB Street and Drain from Liyakat house to Tauru Road in Ward no. 2
Estimate for construction of rectangle box masonry for Kapil Muni Drain from RD 9000 to 11000.
Const. of RCC Drain from Maman Shop to Community centre on Jhajjar Road in MC Farrukhnagar