Loading…
Loading…
17,488 results • Best match
Construction of RCC Storm water drain from NAYARA petrol pump to Chawla Colony and raising and restoration of street from Adlakha Factory to Scheme no. 63, ward no. 11, MC Panipat (Urban).(Recall)
Construction of Storm Water drain by providing and laying R.C.C. NP-3 Pipe 350 mm dia from Bhagwaria Gas Agency to Mittal Trading Company (Gaushala Road) in janakpuri, Ward No. 14, M.C. Karnal.
Construction of RMC-40 Road and Laying of 700mm dia Sewer line and 600mm dia Storm Water drain line in Noorpur Mod to Aklimpur Village in Ward No.18, Division-1B under MCG.
Estimate for the construction of RCC Box type storm water drain on both side (A-B) of road from Tulip chowk existing M.H in Village Darbaripur Ward No. 25 under Municipal Corporation Gurugram
Construction of RCC Storm Water Drain from JP Medical Store (Sabji Mandi Road) to Mela Ram Park, Ward No. 03, MC Panipat (Urban).(For L/C Societies and Contractors)-DLP is three years
Construction of Road with Beautification Works including Footpath, Street Lighting, and Storm Water Drain from Badshahpur Pond to Kabaddi Stadium, Ward No. 18, Division-1B, Zone-1, under Municipal Corporation Gurugram.(Re-Call)
const of sanitary water drainage nala from shiv mandir to dimana road chuliyana roj
CONSTRUCTION OF NALA FOR DRAINAGE AND LAYING OF PIPE LINE AT VILLAGE NAINA TATARPUR
Construction of drain and Rasta from Tubewell to Harijan mohalla chaupal at village Nimoth Block Dahina Distt Rewari
Construction of drain from Tank No. 4 to peripheral drain in PTPS Colony, Panipat
Construction of water drain chutes along dividing roads between Sector 35 36, U E, Sonipat and all other works contingent thereto.
Patrolling of storm water drain
Patrolling of storm water drain
Const. of Nala at Villlage Akbarpur block Saha From Pond to near community toilets or drains
HGVY CONST. OF DRAINS AND NALA IN RAJA GARDEN COLONY IN VILL. BARNALA BLOCK AMBALA-II
construction of drain and street at vill juddi Block Nahar
Construction of Drain at Village - Junhera Block - Tigaon Distt. - Faridabad
Construction of Storm Water Drain in Sector-04 Gurugram Const. of RCC Box type drain of size 1000mmx1000mm and 1800mmx1800mm, Const. of road gully and 1800mm id RCC NP-3 pipe for road crossing in Ward no. 15 under MC Gurugram
CONST OF DRAINAGE NALA FROM BUS STAND TO DIRTY WATER POND
Reconstruction of VR Bridge at RD 61000 of Nai Nallah Drain
Internal Clearance of Bentan Nallah Drain from RD 0 to 45200.
Work of Cleaning of Nallah/Drain at Sector-05 IMT Manesar
Reconstruction of V.R. Bridge at RD 47300 of Nai Nallah Drain
Sadalpur block adampur Const. of Dirty water Drainage Nali Village sadalpur Block Adampur
De-silting of storm water drainage lines in MIE Part-A Bahadurgarh
Silt clearance from Storm water drain from Storm water drain Barwala Byepass disposal to Blue Bird Lake and from HUDA Water Works Entry gate Sirsa Road to CIRB with minimum width 12 feet by 4 feet deep in kacha drain upto bed level in pucca drain by
Silt clearance from Storm water drain from Storm water drain Barwala Byepass disposal to Blue Bird Lake andfrom HUDA Water Works Entry gate Sirsa Road to CIRB with minimum width 12 feet by 4 feet deep in kacha drain upto bed level in pucca drain by p
Repair of Storm water drainsge line in front of WTP at IMT, Rohtak.
CONST. FO NALA IN GREY WATER MANAGEMENT AT VILLAGE AHULANA BLOCK KATHURA CONST OF DRAIN AND NALA IN GREY WATER MANAGEMENT AT VILLAGE KATHURA BLOCK KATHURA CONST. FO NALA AND DRAIN IN GREY WATER MANAGEMENT AT VILLAGE RINDHANA BLOCK KATHURA
Repair of various damaged streets, drains,nallah, frames, and potholes and patches in Ward No. 17, M.C. Karnal(Recall)
Estimate for Repair of various damaged streets, drains, nallah and patches in Ward No. 9, Municipal Corporation, Karnal (Recall)
Repair work of various streets, drains, nallah and I.P.B. etc. at various locations of Ward No.7, M.C. Karnal.
Preparation of rainy season (for 2026) by hiring of machinery and cleaning of Nallah / Drains in Ward no. 29.
Repair work of various streets, drains, nallah, pipes lines etc. at various places of Ward No.12, M.C. Karnal.
Repair of various streets, drains, nallah and grills in ward no. 18, M.C. Karnal (Only for L/c societies )
Repair / Maintenance of Road, Nala, Drain Nala AND Crossing in various places in Municipal Committee Dharuhera.
Providing, Repair and maintenance of various Slabs/pulias/Crossing/Nalla at various places for drainage works in Municipal Council Kalka
Estimate for Providing pumping Machinery, construction of storm water drain and repair of existing brick masonry collecting Tank at IPS shambhudayal for Disposal off storm water from Sarang road under pass under MC sonipat.
Construction of IPB Road with Storm Water Drain Line Both Side from MET Hospital to Deepak Yadav House in Rampura and trenchless crossing using HDDD drilling near Hukam chowk Ward No 18, MC Manesar.
Sanitation work and De Silting of Nalla and Drains Main Rohtak Bhiwani Road in Kalanaur under flood control scheme and NGT Kalanaur
I/C, J/C and Sludge Clearance of Chuttang Nallah Drain from RD 14825 to 27500
Internal Clearance, Jungle Clearance and Sludge Clearance of Chuttang Nallah Drain from RD 14000 to 27800.
I/C, J/C and S/C of Chuttang Nallah Drain from RD 14000 to 27500.
Sanitation work and De-silting of Nala/Drain at various places in MC Ladwa Limit (Length of Nala/Drain is approx 9.2 KM)
Construction of Nala Drainage (Mankawass Road) at Village Charkhi Dadri Block and Distt. Charkhi Dadri.
Construction of drain and street from H/o Babli Mahabir to Mey(Rajbala house) at village Mundi Block Dahina Distt Rewari
Estimate for laying interlocking paver block on left side ramp V.R. Bridge at Head Regulator Nai Nallah Drain connect village Anta
Cleaning of Nala/side drain in Municipal Corporation, Sonipat.
De-Silting from Drain/Nala in MC Siwani Area.
Taping of open Drain/Nala into Sewer in Taraori