Loading…
Loading…
17,511 results • Best match
Land Development Programme Through Vertical Drainage project Vill- Gadli
Cleaning / Repairing of Strom Water Drain in Ward No.3 under MCG
Cleaning / Repairing of Strom Water Drain in Ward No.19 under MCG)
Const. of i/l tile in streets and drains from Valmiki mandir to pond , h/o Seema devi to h/o Gyan Chand and drains at Village Haldri Block Saha
Desilting of Master Storm Water Drain along sector dividing road 47/49 and Sispal Vihar to Tikri Village with high power super sucker machine 180 HP to 400 HP in Gurugram.
The rainy season is about to come and cleaning of storm water drain gate ramp with help of super sucker machine at various locations in Sector-8,IMT Manesar is required.
DESILTING OF STORM WATER DRAIN LEG - III (Part) FROM SECTOR-VATIKA CHOWK TO DPG ENGINEERING COLLAGE SECTOR-34, WITH HIGH POWER SUPER SUCKER MACHINE 180 HP TO 400 HP IN GURUGRAM
Cleaning of Jungle of Nallah area and all other works contingent thereto
Providing and of water supply line new water connection near plot No. 1138 in Sector 37C, Gurugram and all other works contingent thereto
PNP CONSTRUCTION OF NALA FROM H/o CHANDRA S/o JITTU TO H/o SANJAY AT VILLAGE KHOJKIPUR KHURD BLOCK BAPOLI DISTRICT PANIPAT (under D PLAN SCHEME)
Sarangpur (Agroha), Const. of nala from Khara Kheri road to Bhogia mandir (ZP)
Cleaning of CBD/Drain from Traffic Light of Sector 9-10-5 to BEL Factory and from side of H. No. 240 Sector 10 to open nallah via sector 14/15 Dividing and Phase i/sector 14-12, Panchkula
To Reclamation of Saline Soil and waterlogged area through Vertical Drainage system project Village Khera Khalilpur Block Nuh
Improvement of Drainage System on Sector Dividing Road of Sectors 3/21 and Ph-I/II at Panchkula.
Construction of Drainage and Allied Works from Mahavir Chowk to Kapashera border, Gurugram, including all works contingent thereto
Construction of Nala from 1 Ho mahavir So Hukmi 2 Ghogripur Road to Ho Chander So Baru 3 Ho Sultan So Maman to Main Road at Village Kheri Naru Block Chirao
Repair of Culvert at RD 500 and damaged lining patches from RD 0-8000 Bhattu Link Drain
Estimate for Cleaning of Nallah/Drains on 6-7 dividing Road Goodyear Road in ward no 34
Repair and Construction of Waste Water Nala Village Sanga, Scheme vagy
Construction of 3 feet wide Nallah near Kunwar Dagar, Ajit Maharaj Ji, Hukum Lal, Dhananjay Dagar and Govt. Public School and repairing of Nallah from Shaheed Bhagat Singh to Community Centre and RCC Slabs, Jharsaintly, Ward No.01, NIT Faridabad
De- silting of nallah at B.K to Hardware, Hardware to Bata chowk, B.K chowk to Chimnibai chowk, Chimnibai to ESI chowk and ESI chowk to Tikona Park (Both side), Fawra Singh Chowk Nallah in Ward No.13 (New Ward), Faridabad (2026).
Precast slab fixing Nala/Drain etc.
Construction of R.C.C. Box type strom water drain from both side from railway crossing to existing drain near community center at Dhanwapur ward No.12 Gurugram (Under Municipal Corporation Gurugram)
Construction of IPB tiles on Nallah platform from konsiwas road to Kalaka road and various nalla reparing in ward no 7 MC rewari
Construction of drainage syphon at RD 5700 of Ismailabad link Drain for protection of agriculture Land of villages Thaska Miranji, Rohti, jalbera and Tabra village abadi of village Tabra and Deras..
Mtc of grassy lawn of Nallah Area and all other works contingent thereto
nala from h/o ramchandra s/o molar to H/o chand s/o fateh and cow ghat
Internal Clearance of Jodha Nallah from RD 205000 to 195000 before flood season 2025) THE TENDER IS OPEN FOR CONTRACTORS/SOCIETIES/AGENCIES
Internal Clearance of Gurguria Nallah from RD 0 to 2350 before flood season 2025 (The tender is open for contractors/societies/agencies)
Internal Clearance of Ganda Nallah from RD 19500 to 0 before flood season 2025 ( The tener is open for contractor/agencies/societies)
Constr of IPB Street and Nala from Baba Premnath mandir to h/o Satpal (Dulyani)
Dismantling of existing Box type storm water drain of making opening to clean the drain and providing and fixing of precast slab at dismantled opening along GJU boundary wall in Auto Market Phase-III complete in all respect
Reclamation of Saline and water Logged area Through Vertical Drainage Technology at Village-Rewari Khera, Block-Bahadurgarh, District-Jhajjar
Pdg. and laying of 200mm thick GSB, 175mm thick WMM, 50mm thick DBM, 30mm thick BC with tack coat, Internal Water Supply Line, Sewerage System, RCC storm water drainage system and Constn. of 2 No. PUS and construction of 4 Nos. Rainwater Harvesting r
IMPROVEMENT OF DRAINAGE SYSTEM BY CONSTRUCTION OF LEG-IV (VATIKA CHOWK, SOHNA ROAD, UP TO NH-48 ALONG SPR, GURUGRAM CONSTRUCTION OF RCC OPEN DRAIN, BOX DRAIN OF DIFFERENT SIZES FROM C POINT upto NH-48, (RD 0- RD 5220) SUMP WELL, ROAD GULLY
Const of Nala from kaithal Road To Jannat Palace2.Const. Of Ipb Street And Drain Near Dr. Madan Shop3Const. Of Ipb Flooring In Cinema Market (Smalll Gate Bus Stand)4. Const. Of Ipb Street And Drain From Karnal Road To H/o Lucky Walia 5.Const. Of 4 Cu
A)DRAIN FROM H/O PREM HARIJAN TO ROAD (B) NALA H/O NAIN SINGH TO DRAIN (C) IPB STREET H/O SUKHWINER TO MAIN STREET (D) TOE WALL NEAR SHANI MANDIR (E) IPB STRRRT FARM OF PIRTHI TO H/O RAKAM VILLAGE BAHADUR PUR BLOCK PARTAP NAGAR
Const.of RCC Nala From Shop of Sajjan to Mata Chowk and Adjecent Via Daulat Ram (Ex. President) House to Rajeram Saini House in ward No. 4/5 MC Loharu
Const. of Street Drain main road to H/o Malkhan and H/o Malkhan to H/o kamal and R.C.C. Nala From H/o Malkhan To H/o Kamal At vill. Kala Amb Block Naraingarh
Const. of Drain from Sukrampal Muniram Sunil plot to Kosli Kanian Main road at vill. Lukhi,2.Constrction of Nala from house of Ashok Kumar to PWD Road vill Jharodha (Z.P)Block Nahar Distt Rewari.
Construction and repair of nala with sewer manholes and connecting with existing drain and Providing and Laying IPB from House no.826 to 789, Sector 37, Old sher shah suri road, ward no. 24 Faridabad
Construction of RCC Nala in Sani pura in ward no. 12, MC Bahadurgarh
Construction of Nala at Village Shahpur Kalan Block Ballabgarh District Faridabad VAGY 2
Construction of Nala near Shamshan Ghat in ward no. 29 at MC Kaithal
Construction of Nala Ho Shakil to Pond at Village Mimarpur Block Murthal GP
DPLAN CONST OF RCC NALA MAIN ROAD AT VILL. BHARI BLOCK AMBALA-1
Construction of Nala GWM II at Village Farmana and Rohna Block Kharkhoda. GWM
Const. of Nala From Frini to School at Village Sehri Block Kharkhoda ZP
CONS. OF NALA FROM H/O MANJIT TO JOHAD VILL-KHIZRI,BLOCK-PARTAPNAGAR
Construction o RCC Nala in Kabir Basti in Ward no. 31 , M.C Bahadurgarh