Loading…
Loading…
11,186 results • Best match
Improvement to Drain and Concrete Road at 7th Main from 27th Cross to 7th Cross in Kaverinagara, BSK 2nd Satge in Ward No-190 Devagiri Temple Ward (Old Ward No-166).
Improvements to Road and drain of Nayakanhatty-Jaglur Border road Via Channabasaiahnahatty, Gowdagere, Jogihatty and mallurahatty From Km 0.00 to 9.50 (MDR) in Challakere Taluk (Working Reach Km 4.70 to 7.435)
Construction of CC Road , Drain and covering in ward no 06 from Hombamma Devi Temple to Someshwara Temple Road and Development of Ashwathakatte Near Hombamma devi Temple in Bidadi TMC Limits
Construction of cc road and drain from Santosh colony main road to Shankar Savalagi house at Santosh Colony in Kalaburagi Taluka under CM Infrastructure Development Project for the year 2025-26.
Construction of RCC Drain from Backside of Basalingappa Arkeri house to Holene Nagareddy house at Ward No 04 and from Kurubar house to Halla at Ward No 05 in Sirwar Town
Construction of C C Drain and Providing Interlocking Pavers in Yelburga-Kanakagiri-Munirabad (SH-130) Road from Km 0.00 to 1.00 in Yelburga Taluk, Yelburga Constituency in Koppal District.(General Category)
Construction of Bus Stand at ward no 29 in front of Dayasparsha Hospital, Geddalahalli Main Road and Construction slab work on the big drain in Yadavanagar Park in Tumkur City limits
Desilting of Drain from Amrutheshvara Temple to Manjal Thota road, from Kelari Kodi road to Gurupura Bridge, from RTO Bridge to Ambedkar Coloney of ward No 20th Thiruvail in MCC limit
Improvement of Road and Drain Slabs at Menduk Galli, Pallan Galli and Keri Ward No. 21 in Kalaburagi City. (Category- Others) (Est Cost Rs. 25.00 Lakhs)(15th FC 2025-26 C.O.W)
Improvement of CC Drain near Sunil Hoddarga House to Gururaj Mattimud House at Ward No 43 in Kalaburagi City (Category-Others) (Est Cost Rs.5.00 Lakhs) (15th FC 203-24 Savings)
Annual Maintenance of footpath, drain desilting, shoulder cleaning, grating cleaning, resetting of broken slabs, paver block resetting etc., of ward roads (silt and tractor gang) in ward no. 65 Manjunath Nagara
Annual Maintenance of footpath, drain desilting, shoulder cleaning, grating cleaning, resetting of broken slabs, paver block resetting etc., of ward roads (silt and tractor gang) in ward no. 60 Prakash Nagara
REPAIRS/ MAINTENANCE TO SEWAGE SYSTEM BY CLEANING OF SEPTIC TANK, MANHOLES, SEWAGE LINES, GULLY TRAPS AND DRAIN, HARDSTANDING, PATHWAY AND CHAIN LINK FENCING AT SITE A1 OF NAVAL BASE AREA, KARWAR
SW-I:-Sr DEN Central Jurisdiction : Provision of Bituminous road with Drain at TKE Railway colony SW-II:- Provision of New TTE Rest Room at SMET on par with running room
Custom Bid for Services - Service Contract for insitu repair and or reconditioning at vendors workshop of high pressure valves and high energy drain valves at NTPC Kudgi for Two 2 Years
Construction of C.C. Drain & C.C. Road from Rukumouddin House to Ramesh Mehtre House at Kollar (B) village in Bidar Taluka. (2) Development of Road from Imamabad Halli Approach Road to Basavaraj Patil Ashtoor Field at Ashtoor (3) Improvements to Road ... (Old Nala ). ...
Providing and Constructing Machine Hole, CC Drain and Developing the Road from Mallikarjuna Swamys House to K.M. Sureshs House in Giridarshini Extension within Rammanahalli Town Panchayat Limits
Choudapura and Suladhalli villages limit Construction of CC Road/drain On MDR 31087 Road from Moraba Cross (on NH50) connecting Chikkakumbalagunte via Moraba, Chowdapura, Gunasagara, Suladahalli, Harakabhavi, Bellikatti, Byluthumbaragudd, ... Road/ drain On ...
Construction of road and drain at janayya house to muthanna house murthana house to chikkaya house Ambala road under railway bridge to kanchariya Temple road at ward no 4, Development of road at ningappa doctor house and sugar road at ward no 5, ... and drain Gandhinagar ...
Construction of Cement Concrete Road and Drain from the back of the Anganwadi Center on the main road leading towards Chikantapur to Vaddara Basavarajas house in Kodalu village, Concrete construction around Bevinakatte (Kollarammanakatte) in S.C ... and drain from ...
Construction of CC Drain from Mohan Pai House to Anjaneya Temple at W No 07, from Veerabhadrappa Saw Mill to APMC Compound at W No 10, from Poojari Timmanna House to Hanumanha Singh House at W No 15, from Bhirappa House to Sharanegouda Layout at W No ... CC Drain from ...
1Construction of CC road from near Gruha bhagya Schems Pourakarmikas house hold area2Construction of CC road from H.M Kadirappa house to Parwathamma house at ward no.303Construction of Drain from Ganganagara Sanjeevrayappa house to Puttapurlhalli ... of drain from ...
Ward No. 04 Jannathamma Hulakoti house to the road next to the park. Ward No. 18 Sikkedesai Plata Hallikeris house to Horakerioni main road. Ward No. 01 and Ward 10 Joshi Layout RCC drain construction from the park Anganwadi center to Virupakshappa ... large drain in ...
Improvements to Road, Drain & other works in Ward No 8,9,13,14,18,19,20,21,22,23, and in Front of M S Ramaiya Samudaya Bhavana,Construction of Steps To Basavanna Hill, Doomlight Circle,Construction of Food Court near Sasyodyanavana, Improvements in ... & drain in ...
Improvements to Road connecting from solur service road to Bydrahalli Chikka solur via Gollarahatti Village Construction of CC Road and drain in Gollarahatti Village limits of Solur GP Improvements to loop Road from Gudemaranhalli-Dabaspete main Road ... & Drain from ...
Construction CC Drain in Ward No 06 at soppugudde A K colony near Ajad shafi house,Construction CC Drain and Deck slab in Ward No 7 at TAPCMS road way to market and Ward No 08 at High school road behind Dinesh Bhatt house, Ward No 09 at behind pradeep poojar house from ravichandra house to nagaraja house and in Ward No 10 at Anantheshwara Sabha bavana Thirthahalli TP limit.
CONSTRUCTION OF RCC DRAIN TO SUBRAHMANYA-MANJESHWARA SH ROAD 100 AT CH 48.60 UNDER PUTTUR SUB DIVISION UNDER THE HEAD OF ACCOUNT 3054-03-337-0-05-200 SH ROAD MAINTENANCE (ADDITIONAL WORKS)
Construction of CC sewer from behind Dalavayappa Master s house in Haralahalli to Thippeswamys house
REPAIRS TO HARDSTANDING, PATH AND PAVER BLOCK, DRAIN CHUTE, CHAIN LINK FENCING, COMPOUND WALL AND OTHER CONNECTING WORKS AT INHS PATANJALI, NCHC, MES AREA AND SITE E NAVAL BASE AREA KARWAR
Ward No. 07 Road development from Ningappa Manoji house to Tanaji Koda house and in Ward No. 08 R.C. drain and road development from Gangadhar Khanduna house to Malatesh Khanduna house, from Kedari Hungund house to Shivaji Bhosle house, from Vallabh ... R.C.C. drain and ... R.C. drain on ... R.C.C. drain from ... RCC drain and ... CC drain from ... CC drain and ... RCC drain and ... and drain from ... office, drain and ... RCC drain and ... RCC drain and ... RCC drain from ...
Construction of Interlocking Paver road/CC road/CC drain from Maramma Temple to Graveyard, in Scheduled Caste Colony, in Bhairapur Village, in Siruguppa Taluk, Ballari District under 2515-KKRDB CMDQ Projects for the year 2024-25. (Reserved CAT-II(A) Category)
Construction of compound wall beside nala in Hindu burial ground in Ward No 21 Construction of compound wall to ladies toilet in Ward no 31
Construction of Liquid Waste Management Outfall Unit From Londekenal Nala at Machagundal village of Badyapuri GP, Shorapur Taluka under MGNREGA for the Year 2024-25.
Construction of BT road in Ward No. no-02 from 1)Market road to canal 70m 2)Raza Bakery to Autoswamy House150m, 3)Thalavara eerappa plot to Kuri mallappa house75m,and CC drain link road -1 4)Sathyappa House to Mallappa House 80m, link road -2 ... CC Drain 100m ... CC Drain 100m ... CC Drain 160m ... CC Drain from ...
Construction of Bird nest for feeding food and water to birds at Shivaji Garden, Providing and Fixing Retro Reflective sign boards, Construction of RCC half round pipe gutter at Mahaveer colony from barate House to Nala and Providing fixing chain link fencing and Gate to Womens open air gym at Shivaji Garden in ward no 16 in the City Corporation Limits in Belagavi. (Reserved for Schedule Tribes (ST) Contractors Only)
Const of Check dam near Ananthapura (majara) village of KG halli GP, Improvements to Kalyani including connecting channel to Kuntanahalli village of Kondashettihalli GP, Construction of Kalyani in Hungenahalli Village of hungenahalli GP, Construction ... downstream nala of ...
Construction of Surface and SubSurface drains to the fields of Machakanur Chandrashekhar Appanna and others in R S No 3/22 3/23 3/5 3/19 3/20 3/21 3/24 3/25 16/12 16/5 16/11 16/13 15/12 15/5A 15/11 15/5B 22/12 22/4A 22/11 22/5K 22/5B 23/13 23/5A ... SubSurface drains to ...
construction of deck slab in ward no 05 maruthi nagara near keerthikumar residence,ward no 03 tamilian calony near hoovina lakshmidevi residence,ward no 04 apmc compound backside thippeswamy teacher residence road and b t ranganatha residence road ... cc drain in ... cc drain beside ...
Comphrensive Development and Improvement of roads, drains and other allied works at Sahakaranagara D and E blocks, Chinnappa layout, Mariyannapalya, Cauvery layout Gopalappa layout and surrounding areas in ward no.09,Hebbala Kempapura,Sahakaranagara A block, B block, C block, E block, F block and surrounding areas in ward no.10 Byatarayanapura,Devinagara, Lottegolahalli and surrounding areas in ward no.11 Kodigehalli. CMIDP Scheme 2025-26 Package No3
Comprehensive Development to roads, drains, Culverts, and Asphalting to roads at Round table School , Sayeda masjid, Amar School and Sandyvoo Nagar, B.M Krishnappa Layout Cross roads, Modi road 13th Cross and Hindu Burial ground, Madeen Mohalla, Sounders Road & surrounding area in ward no 70 Kushalanagar, 71 Muneshwarnagar, 69 K B Sandra, 72 D J Halli, 73 S.K Garden & 75, Pulikeshinagara (Govt Sl No 46,61,65,73,79, 85) (Package No 8) (2nd Call)
PROJECT MANAGEMENT CONSULTANTS (PMC) FOR PREPARATION OF DPR FOR TP OFFICE ROADS,DRAINS AND BUILDING WITH WATER SUPPLY/UGD,RETAINING WALL INCLUDING SURVEY DESIGN SERVICES.CONSTRUCTION DRAWINGS FOR ALL SERVICES, STRUCTURAL DESIGNS INCLUDING STRUCTURAL DRAWINGS FOR BUILDING AND ASSISTANCE IN TENDER PROCESS. EXECUTION AND SUPERVISION OF WORKS, ASSISTANCE IN BILLING PROCESS AND ALSO 3RD PARTY FOR THE URBAN INFRASTRUCTURE WORKS IN THE NEGALUR ROAD AT TP GUTTAL IN HAVERI DISTRICT.
Providing PMC Services including Supervision, Quality control for Construction of Additional Floor to Newly proposed Samudhaya Bhavana at Raghuram Layout and Other Development Works in ward no. 12 and Construction of New Primary Health Centre in ward ... and Drains at ...
Consultancy Services for Project Management including Supervision, Quality control (PMC) for Comphrensive Development and Improvements to Road and Drains at Winfield Garden, Suryodaya Layout and Central Exercise Layout Surrounding Areas in Ward No 06 Jakkur. Afzal Layout, Gupta Layout, Vidyasagar Layout and Saraipalya Surrounding Areas in Ward No 07 Thanisandra. Maruthi Layout, Amruthahalli, Talacauvery Layout and Surrounding Areas in Ward No.08 Amruthahalli. CMIDP Scheme 2025-26 (Package No. 02)
PROJECT MANAGEMENT CONSULTANTS (PMC) FOR PREPARATION OF DPR FOR CREMATORIUM BUILDING WITH ROADS AND DRAINS,WATER SUPPLY/UGD INCLUDING SURVEY DESIGN SERVICES.CONSTRUCTION DRAWINGS FOR ALL SERVICES, STRUCTURAL DESIGNS INCLUDING STRUCTURAL DRAWINGS FOR BUILDING AND ASSISTANCE IN TENDER PROCESS. EXECUTION AND SUPERVISION OF WORKS, ASSISTANCE IN BILLING PROCESS AND ALSO 3RD PARTY FOR THE URBAN INFRASTRUCTURE WORKS IN THE IJARI LAKMAPUR HINDU SMASHAN AT CMC HAVERI IN HAVERI DISTRICT.
Construction of Rainwater Drains and CDs in the new Municipal office premises & near Mojanagoudas house in Ward No.13 behind Durgadevi temple in Rachayya Nagar in Ward No.18 behind Shankarlinga temple in Ward No.19 from Rudrayya Nayaks house to Manju Palledas house .from Mulikas house in Ward No.10- 3rd street to Joshis house and from Kempagasi a to Horakeri Basavannas temple in Ward No.6
Providing PMC Services including Supervision, Quality control for Comprehensive Development of Arterial & Sub arterial Roads, Drains and Footpath Development, other allied works in Horamavu division, Agara Babusapalya main road from ORR till Agara Railway Track, Kristu Jayanthi College road from K Narayanapura Cross( Hennur Bagalur main roadd) till Hanumanthegowda Circle & HAL Division Kaggadasapura main road from Indeera Canteen till railway level Crossing road in K.R.Pura Assembly Constituency under GOK Grants 2025-26
Comprehensive development of Roads, Improvements to drains, culverts, footpath and Beautification and providing Green Edge existing White topping Road in Hosur Lashkar Road, 20th Main koramangala, 6th Cross Koramangala other works in Aicoba nagara, Manjunatha Layout, Roopenanagar, Sunshine colony, HSBCS Layout, KAS Colony, Pushpa Layout, Madeena nagara, Sanjeevamma Badavane, N S Palya, MICO layout, SFHS Layout and surrounding area in ward No 180 Someshwara Temple & 181 BTM Layout of BTM Layout Division
Construction of CC Road and CC Drain from M Khadar Sab House to GHPS School in Ibrahmpur village, In Siruguppa Taluk Ballari District. Under 2515-KKRDB For the Year 2025-26
Construction of CC drain & Improvement of Road dattu Writer House to Umesh Talawar House in ward No 26 of Kalaburagi City Under KKRDB Macro for the Year 2024-25 (workcode KLB2412123685)(workcode KLB2412123685)