Loading…
Loading…
10,005 results • Best match
Pigtail Drainage Catheter (V2) (Q2) (3 (3 ))
P/L RCC PIPE 250 FOR DRAINAGE
Repair of drainage and tiles w.no. 1
Foley's Rubber Catheter (for Prolonged Urinary Drainage)
Thoracic Drainage Catheter with Trocar (V2) (Q2)
Estimate for Clearance of Weed, Kalali, Jala, Booti, Sarkanda etc. from the bed of Daudhar Outfall Drain RD 0-37000
Estimate for Clearance of Weed, Kalali, Jala, Booti, Sarkanda etc. from the bed of Makhu Drain from RD 4000-59000
Cleaning of weed Jala Booty Sarkanda etc from Aspal Drain RD 20500 105700
Estimate for strengthening of banks from RD 6500 8500 of old fazilka drain
Desilting and removal of River Bed material from village Gunia on L S of RiverRavi RD 0 to 609 6 mtr to eliminate Drainage congestion and protect nearby residential Areas and Agricultural Land from potential flooding and erosion Site 4 Distt Gurdasp
Desilting and removal of River Bed material from village Gurchak and Gunia on R S of R Ravi RD 0 to 457 mtr to eliminate Drainage congestion and protect nearby residential Areas and Agricultural Land from potential flooding and erosion Site 3A Distt
ESTIMATE FOR R AND M SIDE PROTECTION OF VARIOUS VR BRIDGES AT RD 1900 11350 22100 37000 40000 47500 AND 56300 OF SARIYAN DRAIN AT RD 14000 20000 27018 32200 38000 45515 47647 57000 and 68000 OF BARKATWAH DRAIN AT RD 5570 16200 AND 20400 OF LADHUK
Estimate for Construction of Fall at RD 7000 of Nala Singh Distributary along with cross Regulator at Nala Singh Distributary and Head Regulator at Pota Minor
Renovation and Upgradation of Open nallah including providing RCC cover at 51st bn ITBP PATIALA PB
Construction of Drain from Tej Singh Numberdar house to Chamkaur Singh House, Bant Singh house to Hakam Singh house and Hakam Singh house to Ganga Mai Pond at Village Ganga, Block Goniana, Distt. Bathinda.
Const. and repair of street back side shop of BittuPresident,Const.and Repair of street near Happy Studio to Nala and Const.of Drain Type II in the street at Ward No.04
Const. of Retaining Wall and Road along Nallah in Naali Mohalla, Ward No. 84 (89)
Discharge of Dirty water Ward No. 4 Aara of Sh. Das Ram to Sem Nallah
P/F IRON SCREENING JUNGLAS AND REPAIR OF NALLAH AT VARIOUS STREETS OF NP RAJASANSI
Remodelling of nallah and Construction of roads from Shingar Cinema Bridge to Shamshan Ghat Bridge.
Reconditioning of road along Budha Nallah from Haibowal Pulley to Pavittar Nagar Pulley W.No.81
Const of open nallah from chahal TV centre to Fazzupur chownk w.no 8 Mc Dhariwal
Cleaning of Naumni Nallah from RD 0 to 37158 in Jurisdiction of in District Pathankot
Construction of Balance Portion of Road at Ganda Nallah (Maqboolpura) upto Park in Mall Mandi
Reconditioning of road along Budha Nallah from Pavittar nagar to Gopal Nagar Ward No.80
Renovation of Side Berms of Service Lane from Budha Nallah to Gandhi Market Road, Ludhiana.
Repair of Nallah, Pullies from Bharamkumari Mandir to Railway Road, W.No. 16, 18 and 19
Laying RMC (M-30) in street of Kashmir Nagar Nallah Road in ward no.57.
Construction of RCC Slabs on Nallah, Mohalla Sant Nagar Hoshiarpur Reso No. 268 dated 31.05.2023)
Estimate for Desilting of Sakki Nallah from RD 44200 ( Chuchakwal ) to RD 18500 ( Lodhi Gujar)
Dewatering and cleaning of borewells with compressor of capacity 300 cfm at 250 pcl of Dhuri drain at village Harigarh to save lives and property of village Harigarh, Bhure, Badbar, Bhaini Mehraj etc. during flood season 2022 in Distt. Barnala
Resectioning/Clearance of Sarkanda, Weed, Jala Booty etc. from wet Drain by Machinery from the bed of Sirhind Choe in between RD 320000-347000 before the flood Season of 2022 to save nearby abadies and agriculturable Land of village Jalan, Santokhpur
Removal of weed, Jala, Booti, slush from the Bed and Side Slopes of Jhamboowali Choe JWC drain RD 236000 to 310000
cleaning of weed booty sarkanda etc from samana mandi drain from RD 0 to 12500 before flood season 202 to 27
Clearance weed carpet grass elepant grass booti water hyacinths sarkanda tripidium bengalense silt obstructions etc from Raipur Munnian Drain in BW RD 0-200000 Shri Anandpur Sahib
Lift/Gravity flow pipe line scheme RD 0-7200 to drain out flood water from filed and abadi Village of Thandewala (Distt. Sri Muktsar Sahib) outfalling into Thandewala Link Drain at RD 32315
Estimate for plugging and stregthening of various cuts of Chandbhan Diversion Drain in between RD 98000-204000
Desilting of Mohkam Bhatti Drain from RD 0-17300, Clearance of Weed, Kalali, Jala, Booti, Sarkanda etc. from the bed of Kotla Link Drain RD 0-15000 and Clearance of Weed, Kalali, Jala, Booti, Sarkanda etc. from the bed of Kohala Drain from RD 0-2930
P/L pipes in Nalla starting from Jalandhar road upto backside of Royal tower in w no- 03 at Nakodar
Construction of Open Nalla from Dullat Patti Khu to Gopi Khan workshop (Tervani Chowk) in Patti Dullat Ward No. 13
Rough Cost Estimate for Reconditioning of street from Goel feed to old Bassi road, side street Bhandari Clinic and construction of Drain from House of Gurmail Singh Dholan Majra Road in ward no. 15
Resectioning and clearance of sarkanda, weed, jala, booty etc. by machinery from the bed and sides of L-5 Link Drain in between RD 0- 35800 before the flood season of 2022 to save nearby abadies and agriculturable land of village Ramgarh, Sekhuwas,
Resectioning and clearance of sarkanda, weed, jala, booty etc. by machinery from the bed and sides of Lehragaga Link Drain in between RD 0-91000 before the flood season of 2022 to save nearby abadies and agriculturable land of village Chotian, Alishe
Resectioning and clearance of sarkanda, weed, jala, booty etc. by machinery from the bed and removing slush from bed of Lehragaga Ditch Drain in between RD 0-21215 before the flood season of 2022 to save nearby abadies and agriculturable land of vill
Bahmanwala F/Link Drain No.1,2 Rd 0-2600,0- 2150,Chirewan link Drain Rd 0-7950, Chirewan F/Link Drain Rd 0-3100, Sangrana Link Drain Rd 0-19680 of Burra Gujjar Drainage system
Bridge across Budha Nala near Amrit Dharam Kanda,Tibba Road , Ludhiana.
CONST. OF NALA AND INTERLOCKING TILES TRUCK UNION TO GURMUKH SINGH
Repair And Construction Of Draine Nala At Godown Area Mc Zirakpur
Const. of Center Verge near Ganda Nala Leather Complex main Road.
P/L 60mm Thick Tiles From Canal Raod To Ganda Nala