Loading…
Loading…
51 live23 closing this weekmost from E-IN-C BRANCH - MILITARY ENGINEER SERVICES and North Central Railway
51 results • Best match
Work regarding the provision of separate earthing for Lightning Arresters (LAs) installed on power transformers at 33/11 kV substations under EE EDD, Sagar, Lalganj
Augmentation of Earthing, Bonding, Surge and Lightning Protection System for compliance as per latest RDSO TAN guidelines in AGC-PWL section.
Work of Rejuvenation of neutral earthing of Transformers with Chemical earthing
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 30 KV Lightning Arresters (Pocelain); Switchyard, Substation; Service Provider
Delta Type Earthing work under EDD, Bahraich
Replacement of earthing arrangement along with other associated work for improving earthing system at Aligarh Switching Station in Prayagraj Division.
Wheel Set Earthing equipment for LHB Coaches etc.
Disconnecting and Earthing Device, 8 Pole, 2 Way etc.
SITC of OFC Network System and Earthing System at
EARTHING CABLE COMPLETE FOR WHEEL SET EARTHING EQUIPMENT TO BOGIE [FOR LHB TYPE COACHES] TO RCF DRG. NO. LW71249, Alt. (C), all items in assembled condition.
Earthing Capacitor Sub-Assembly Consisting of 04 Nos 0.1 MFD/1000V AC
10 Sqmm Cu Earthing Cable/2x1.5mm Multistand flexible wire/18w LED Bulb.
SPECIAL REPAIR / REPLACEMENT OF CERTAIN EARTHING AND LIGHTENING INFRASTRUCTURE AND PROVN OF LIGHTENING PROTECTION SYSTEM WITH EARTHING PITS AT NEWLY INDUCTED HUT AT AF STN BAREILLY UNDER GE(AF) BAREILLY
Provision of Certain Earthing Work in 22 MMPU at Hindan Air Force GZB.
Earthing Cable For Traction Motor Type 6FRA6068 as Per Drg. No. TRS/GMO/TM/G-9/025/ECR
REPAIR/ MAINT OF TRANSFORMES, HT POLES, GOD, EARTHING, LA AND CONNECTED WORK/ITEMS AT NEW CANTT UNDER GE (WEST) PRAYAGRAJ.
Augmentation to Enhance Safety at TSS, SP and SSP Locations along with Improvement of Bonding and Earthing Systems over Moradabad Division.
REPAIR REPLACEMENT TO EXTERNAL WATER SUPLY SYSTEM BORWELL,MOTOR PUMP,OH TANK, EARTHING, STARTAR PANEL AND SPLIT TYPE ACS,WINDOW TYPE ACS, VOLTAGE STABLIZER,WATER COOLER,DESERTCOOLER,REFRIGRATOR,DEEP FREZER AND OTER CONECTED WRKS AT MILITARY STN BARAN
Provision for supplying & Laying of L.T. cable for training center along with replacement of MCCB and Providing earthing to panel at IIPR, kanpur
REPAIR/ MAINTENANCE/ MAINT OF INTERNAL WIRING WITH SUB MAIN WIRING, DBS AND EARTHING OF OTM ACCN UNDER GE WEST BAREILLY
REPAIR AND MAINT OF EARTHING PITS, LIGHTENING ARRESTOR AND OTHER MISC WORKS IN ZONE A AND B IN TECH AREA UNDER GE (AF) (TECH AREA) AGRA
PROVN OF EARTHING INFRASTRUCTURE IN TECHNICAL AREA AND PROVN OF LT CABLE AND ASSOCIATED WORKS FOR CENTRALLY OPERATED BOOM BARRIERS AT ATC AFS BAREILLY UNDER GE (AF) BAREILLY
REPAIR/MAINT OF 33/11 KV INSTALLATIONS AND DITRIBUTION NETWORK, POWER TRANSFORMERS, EARTHING, CONTROL CABLES, VCBS, INSULATORS AND PANELS ALONGWITH CONNECTING WORKS IN CANTT AREA UNDER GE (I) KANPUR
REPAIR/MAINT OF DG SET, AMF PANEL, EARTHING, MECHANICAL LAUNDARY, FIRE FIGHTING SYSTEM AND CONNECTED WORKS IN THE AREA OF AGE E/M (HOSP) UNDER GE E/M LUCKNOW
REPAIR/MAINT OF CERTAIN MISC E/M MACHINE/EQPT EARTHING, PRISMATIC SIGN BOARDS WITH MONKEY CAGING PROTECTION, FLOW CHART DIAGRAM OF PUMP HOUSE WITH ALLIED WORKS AT AYODHYA CANTT UNDER AGE (I) AYODHYA.
REPAIR/REPLACEMENT OF EXTERNAL ELECTRIC SUPPLY SYSTEM LT PANEL CABLE TIMER SWITCH POLES STREET LIGHT SOLAR STREET LIGHTS CSS DG SETS EARTHING AND OTHER CONNECTED WORKS AT MIL STN BARBANKI UNDER GE (EAST) LUCKNOW
C/o 150 Bedded Critical Care Hospital and Vertical extension for 5th floor of existing Trauma Centre hospital (SH : Rectification and shifting of existing solar cables, earthing and communication cable etc. and make system functinal).
HOUSING FOR EARTHING BRUSH ASSEMBLY (FOR LHB TYPE COACHES) AS PER RCF DRG. NO. LW71233, ALT. c, ITEM NO. 1 & 2.CONFORMING TO RCF SPECIFICATION NO. EDTS-101, REV. C, AMENDMENT 1, CORR-6, ANNEXURE-1.
Additional business plan for the year 2026-27, Execution of Delta earthing work on a complete turnkey basis for the protection of line arresters and associated equipment installed on 75 power transformers under the Electricity Distribution Division Y
REPAIR/MAINT/SERVICING AND PREVENTIVE MAINT OF 33 KV MRS SWITCH YARD, 33 KV BREAKERS, VCBS, POWER TRANSFORMERS AND CALIBRATION OF RELAYS OF CONTROL PANELS, EARTHING OF SWITCH YARDS PLANTS AND EQPT AND ALLIED WORKS AT AYODHYA CANTT UNDER AGE (I) AYD
As described in BOQ
ELECTROD 80 mm X 3 Meter, bfc compound 50 KG, connection strip, nut bolt wire with earthing conn
Maintenance kit 03 for Earthing equipment kit consisting of 6 items confirming to RCF Specn. EDTS 101, Rev. C, Amndt. 3, Corr.- 10 with Annexure 1. (1.) SS Bush Drg. No.LW71235 Alt. a Qty./Set 02 Nos. (2.) Brush Holder Drg. No.LW71238 Alt. Nil Qty./Set 01 No. (3.) Carbon Brush Assembly Drg. No.LW71239 Alt - Nil Qty./Set 02 Nos. (4.) Clip Assembly LW71240 Alt. a Qty./Set 02 Nos. (5.) Isolating Bush Drg. No.LW71244 Alt. - a Qty./Set 02 Nos. (6.) Bracket Drg. No.LW71247 Alt. - Nil Qty./Set 01 No.
MAINTENANCE KIT-02 FOR EARTHING EQUIPMENT CONSISTS OF 5 ITEMS, CONFORMING TO RCF SPECIFICATION NO. EDTS-101(REV. C, AMENDMENT- 4, CORRIGENDUM- 10 WITH ANNEXURE- 1) [1] HOUSING TO RCF DRG. NO. LW71233, ALT. d, QTY/SET- 01 NO. [2] COVER TO RCF DRG. NO. LW71234, ALT. d, QTY/SET- 02 NOS. [3] BLANKING PLUG TO RCF DRG. NO. LW71236, ALT. NIL, QTY/SET- 02 NOS. [4] RING OILER TO RCF DRG. NO. LW71242, ALT. d, QTY/SET- 01 NO. [5] SLIP ASSEMBLY TO RCF DRG. NO. LW71243, ALT. NIL, QTY/SET- 01 NO.
MAINTENANCE KIT-03 FOR EARTHING EQUIPMENT KIT CONFORMING TO RCF SPEC. NO. EDTS-101 REV. C, AMEND.2 CORR. 07, ANNEXURE 1. ONE SET CONSIST OF 06 ITEMS- (1) S.S. BUSH TO RCF DRAWING NO. LW71235, ALT. a =02 NOS. (2) BRUSH HOLDER HOUSING TO RCF DRAWINGNO. LW71238, ALT. NIL =01 NO. (3) CARBON BRUSH ASSEMBLY TO RCF DRAWING NO. LW71239, ALT.NIL =02 NOS. (4) CLIP ASSEMBLY TO RCF DRAWING NO. LW71240, ALT. a=02 NOS. (5) ISOLATING BUSH TO RCF DRAWING NO. LW71244, ALT. a =02 NOS. (6) BRACKET TO RCF DRAWING NO. LW71247, ALT. NIL=01 NO.
Disconnecting and Earthing Device 8 Pole 2 Way without OFF, ON Load 125A at 1000 V AC, 2NO + 2 NC and Heavy Duty handle and Pad Locking Arrangement in OFF Position, Mounted in a Stainless-Steel Enclosure, Suitable for AC 23 Duty and Conforming to IEC 60947, Max Depth Including Handle 480 mm, Make- M/s. Schaltbau Cat NO. M137.0827407.R1/ L&T-Salzer Cat NO. 74168SLB32LOGBSS(2NO+2NC)/ M/s. Techno Trendz Cat NO. IS81210TT19L/ Kaycee make 12580892A34V49XE (25%) only; as per RDSO Spec. RDSO/PE/SPEC/0184-2015(Rev.-1) and RDSO L/N. EL/7.1.108/MSSBC, dt. 17.09.21.
Custom Bid for Services - Relay Testing, Custom Bid for Services - Tan Delta Testing of Transformer, Custom Bid for Services - Partial Discharge Testing of Transformer, Custom Bid for Services - Routine Testing of Transformer, Custom Bid for Services ... - Earth Pit Testing, ... Of Earth Pit layout, ...
PCC pole 9 m long, STP 11 mtr long, ACSR Dog conductor., 33 KV XLPE Cable (3x120 sq. mm), 33 KV O/D Cable box size 3x120 sq. mm, 33 KV I/D Cable box size 3x120 sq. mm, 34 KV I/D Straight through size 3x120 sq. mm, 33 KV line isolator, 33 KV Metering ... complete, earthing complete ... Ordinary earthing by ... for earthing of ... type earthing pipe ...