Loading…
Loading…
1,908 results • Best match
Construction of corridor between existing CATF building building no. 37 and new extension of CATF building for Antenna Assembly Integration and testing Laboratory at SAC Campus, Ahmedabad- Electrical work
Facility Management Services - LumpSum Based - Government Education Institute; O&M of Civil Work, O&M of Electrical Work; Consumables to be provided by service provider (inclusive in contract cost)
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover
LED Batten (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6490830 Dated : 07-08-2025 Bid Document 1/7 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Part A AHU HVAC panel and Airshower as per attached annexure, Part B Civil works, Part C Electrical works, Part D Miscellaneous Validation of Entire clean Room Area, Part D Miscellaneous 5 years of Annual Maintenance Contract
Supply Installation Testing and Commissioning of 02 Banks 96Nos of 12V Sealed Maintenance Free Lead Acid Batteries for 2 x 40kVA AROS Make UPS System at RISAT Building No 52 53 at SAC Campus Ahmedabad Electrical Works
Custom Bid for Services - PROVIDING SERVICES OF SKILLED AND UNSKILLED WORKERS AS PER PART A SCHEDULE OF QUANTITIES, Custom Bid for Services - GRAND TOTAL OF MISCELLANEOUS ELECTRICAL WORKS AND SERVICES AS PER PART B SCHEDULE OF QUANTITIES
As per BOQ
Htdraulic Kit, Starter kit, Wiring Harness, Tail lamp, Fan Belt, Rear Light, Indicator Switch, Plunger, Top Link Pin, Hose Pipe, Stopper Cable, Brake drum Kit, Fuel Feed pump
Construction of Building of W.U.S Health Centre at North Campus, Delhi Sub work - Shifting/Re-locate the existing Health Care Centre in Umang Bhawan Basement. Subwork/Packages: Civil and Electrical Work
Facility Management Services - LumpSum Based - Commercial; MAINTENANCE OF HVAC SYSTEM, O&M of Mechanical Work, O&M of Electrical Work; Cost of consumable to be reimbursed to service provider on actual
Ahmedabad Division- Electrical work in connection with raising & extension of platform at Radhanpur & Adesar, provision of access control system in the newly constructed control office and DRM office including allied/ancillary works required for shifting of the control office at Ahmedabad, removal of pending deficiencies in divyangjan amenties at HG-3 category stations & at NSG-2 to NSG-6 category stations and provision of ballastless track on PF- 3 (Loop Line No. 4) & PF- 4 (Loop Line No. 5) at Bhildi.
Supply, Installation, Testing and Commissioning of Main LT Panel for water supply pumps of pump house and Power supply for Firefighting Pumps at 39-acre New SAC Bopal campus Ahmedabad Under Phase - III and IV Infrastructure Facilities - Electrical works...
Maintenance of Border Flood Lighting Works for BOP No. 1061 to 1097 along Indo Pak Border at Bhuj in Gujarat Sector. (SH: Providing EPABX System, RO Purifier and LED Fitting in CPWD Offices at Bhuj). Subwork/Packages: Electrical Works
As per BOQ
Repair and Overhauling Service - cars; CABIN REPAIR, WELDING WORK, FRONT GLASS RUBBER BIDING CHANGE, ALL RUSTY PARTS CHANGE, ELECTRICAL WORK AND USE OF PARTS ONLY TATA GENUINE PARTS; Yes; Service Provider Premises
Facility Management Services - LumpSum Based - Educational building; O&M of Mechanical Work, O&M of Electrical Work, O&M Civil Department; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Commercial; O&M of Mechanical Work, O&M of Electrical Work, O&M for Electronics Work; Cost of consumable to be reimbursed to service provider on actual
Facility Management Services - LumpSum Based - Supplying LED street light White/Warm LEDs wattage 15 Watts should be Height -5 cm, Length -34 cm, Width-12 cm 3000pcs; O&M of Electrical Work; Consumables to be provided by service provider (inclusi.., ... of Electrical Work ; ... of Electrical Work ; ... of Electrical Work ; ... of Electrical Work ; ... of Electrical Work ; ... of Electrical Work ; ... of Electrical Work ; ... of Electrical Work ; ... of Electrical Work ; ...
As per BOQ
Calibration Services - REPAIR AND CALIBRATION OF AIR DATA LEAK TESTER REPAIR AND CALIBRATION OF AIR DATA LEAK TESTER, Electrical; REPAIR AND CALIBRATION OF AIR DATA LEAK TESTER REPAIR AND CALIBRATION OF AIR DATA LEAK TESTER; Any other Government Appr..
Facility Management Service- Manpower based (Version 2) - Commercial; Housekeeping; Unskilled, Facility Management Service- Manpower based (Version 2) - Commercial; O&M of Mechanical Work, O&M of Electrical Work, As per ATC; Semi- skilled, Facility ... of Electrical Work , ...
Custom Bid for Services - Comprehensive Annual Maintenance Contract (CAMC) for S&T UPS installed in 10 interlocking Stations, Apparel Park Depot (ARPD) and E&M UPS installed in 4 underground stations for a period 3 years in Phase-1 of GMRCL Similar ... Systems/ Electrical Installations Repair, ...
Facility Management Services - LumpSum Based - Educational Institute; O&M of Civil Work, O&M of Electrical Work, O&M of Mechanical Work; Consumables to be provided by service provider (inclusive in contract cost)
External Electrical Work including Solar Panel Works on Substation and East side building including supply of all material in connection with Redevelopment of Udhna Station at Udhna of Mumbai Division in Western Railway
MO IEI and fans, RMO substation equipments, street lights, DG set, pump set for GST & IT office bldg at Vadodara Subwork/Packages: Misc electrical work at the Non Residential building CGST & Income Tax
Electrical work in connection with provision of cover shed at Naroda Goods shed, provision of high level platform, cover shed and other associated works at Mahesana Goods shed, raising of platform level & providing passenger amenities at Ambli Road, elimination of level crossings No. 59 at Km 68/1-2, 60 at Km 69/2-3 & 80 at Km 91/9-92/0 by providing RUB with covered approaches, removal of deficiencies in Divyangjan Amenties at various stations. and extension of platform at Maninagar, Asarva, Samakhiali, Himmatnagar.
Gypsum ceiling, Ceiling LED light and wiring, Cable caching and underground wiring or switch board, Window and almirah covering by cement sheet, Room and wall putty and paints, Window framing, Refurbishment of partition, Main door with wooden framing, Vinyl flooring, Ceiling fan, Cubical work station, Refurbishment of existing office furniture, Wall mount file cabinet, Executive office chair, Executive visitor chair, PA or 02 tons with installation, Wooden digital signboard with crest
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT- 4947 G Work for Emergency cleaning and Maintenance of HT LT Panels Generator BFP cooler battery set and other electrical maintenance activity for Unit no 3 4..
Renovation of Navic / GNSS monitoring lab Room No. 2495 in building no 24-A, Proposed modification in PAFF facility clean room of Bldg. no 50-D and Renovation of Conference room for CSIG at building no 51 at SAC campus, Ahmedabad.-Electrical Works
Upgradation, Repairing and Construction of Compound wall of ITRA Campus - I, II and III at Jamnagar. Subwork/Packages: Laying of 11 KV XLPE Power Cable, Wiring of Electrical Points in Substation room.
Facility Management Services - LumpSum Based - Raw Water Pumping Station and Transmission Line; Security Services, O&M of Mechanical Work, O&M of Electrical Work, O&M for Electronics Work; Consumables to be provided by buyer
As per BOQ
Facility Management Services - Lump Sum Based - Commercial; Housekeeping, Security Services, Horticulture Services, Pest Control Service, O&M of Civil Work, O&M of Electrical Work, O&M of Mechanical Work, As mentioned in Tender document; Consumables ..
Custom Bid for Services - Fabrication/Repairing of piping for the Pneumatic control system, Repair of steering system, Auto Painting & Auto Electrical Wiring of Rig CW-50-VII, WS, ANK Asset Similar Category Support Services
Insulation Tester (Q3) MSE Exemption for Years of Experience and Turnover
Table Fan/Wall Mount Fan/Ceiling Mount Fan as per IS 555 (Q3) MSE Exemption for Years of Experience and Turnover
Electrician tool kit (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6483002 Dated : 07-08-2025 Bid Document 1/8 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Self Ballasted LED Lamps for General Lighting Services (V2) Conforming to IS 16102 (Q2) MSE Exemption for Years of Experience and Turnover
true rms clamp meter (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6540561 Dated : 07-08-2025 Bid Document 1/8 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Piano Type Modular Domestic Electrical sockets - IS 1293 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 4 Bid Number : GEM/2025/B/6840337 Dated : 03-11-2025 Bid Document 1/7 Number of Auto Extension count 3 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) MSE Exemption for Years of Experience and Turnover
Non-Contact High Voltage Detector (Q3) MSE Exemption for Years of Experience and Turnover
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 4 Bid Number : GEM/2025/B/6839065 Dated : 06-11-2025 Bid Document 1/7 Number of Auto Extension count 3 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Handheld Digital Infrared Thermometer (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Bid Number : GEM/2025/B/6340209 Dated : 13-06-2025 Bid Document 1/8 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Propeller Type AC Ventilating Fans - Exhaust Fans (V2) as per IS 2312 (Q2) MSE Exemption for Years of Experience and Turnover
RCCB - Residual Current Operated Circuit - Breakers as per IS 12640 (Q3) MSE Exemption for Years of Experience and Turnover
LED Luminaire for High Bay Lighting (Q3) MSE Exemption for Years of Experience and Turnover
Modular Piano Type Domestic Electrical Switches as per IS 3854 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 4 Bid Number : GEM/2025/B/6840037 Dated : 01-11-2025 Bid Document 1/7 Number of Auto Extension count 3 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Piano Type Modular Domestic Electrical sockets - IS 1293 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 4 Bid Number : GEM/2025/B/6840174 Dated : 03-11-2025 Bid Document 1/7 Number of Auto Extension count 3 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No