Loading…
Loading…
6,984 results • Best match
Upgradation of 70KLD existing CETP at Industrial Park, (Jewellery park) at Machilipatnam Krishna district, Andhra Pradesh Under MSE-CDP Programe (5th Call).
Upgradation of 70KLD existing CETP at Industrial Park, (Jewellery Park) at Machilipatnam Krishna district, Andhra Pradesh Under MSE-CDP Programe (3rd Call).
Procurement of Complete Assembly of Effluent Discharge cum Disposal Pumpand its Spares for Stage-II
Operation and Maintenance of ETP and Hydroflow at Krishnagiri Dairy for 2 Years (2026-28)
Providing acid or alkaline resistant tiling work to elevated solar evaporation pan of RCC Construction at heat treatment plant ETP and SSTP Pickling Plant ETP in BHEL, Trichy Factory Complex
RMO Pump Set, ETP at DDU Hospital and Trauma Block at DDU Hospital, Hari Nagar, New Delhi for 2021-22 and 2022-23 (SH Operation and Maintenance of ETP Plant)
RMO Pump Set, ETP at DDU Hospital and Trauma Block at DDU Hospital, Hari Nagar, New Delhi for 2023-24 and 2024-25 (SH Operation and Maintenance of ETP Plant)
REPAIR MAINT MANNING OPERATION OF SEAWAGE TREATMENT PLANT STP 1 INCLUDING SLPH 1 2 AT ARGA AND ETP I AT NSRY ETP II AT CNTW COMPLEX UNDER GE SB KARWAR
Regular de-silting of washing platform, ETP and drains leading to ETP at Base Workshop, OC-II including transportation for One year period in Manuguru Area, Bhadradri Kothagudem(DT), T.S.
DG MAHAD INDUSTRIAL AREA...M and R to EDS at Mahad and Additional Mahad Industrial Area........ Replacement Of Old and damaged Pump foundations and miscellaneous works at CETP and additional EDS.
Custom Bid for Services - Operation and Maintenance of 80 KLD STP & 05 KLD ETP at Northern Railway Divisional Hospital Lucknow, 500 KLD STP at Varanasi Cantt Railway Station and 350 KLD STP at Ayodhya Dham Railway station, including man power and ... of Effluent /Sewage ... of Effluent /Sewage ...
E-tender for operation and maintenance work of ETP (Mandsour Dairy Plant) 3rd call
E-tender for operation and maintenance work of ETP RATLAM DAIRY PLANT 3RD CALL
MAKING OF RCC PIT IN PLANT MGR FOR EFFLUENT /DRAIN SEPARATION SCHEMEAT KHSTPP
Preparation of Detailed Project Report (DPR) along with preparation of Environmental Impact Assessment (EIA) reports, for AshokeNagar CETP,North24 Parganas
FABRICATION AND ERECTION OF SS PIPELINES IN ETP AT TNPL UNIT- II TRICHY
CONSTRUCTION OF LADIES TOILET NEAR ETP MCC ROOM AT TNPL UNIT-II TRICHY
PROVIDING ELECTRICIAN FOR SRP, WTP AND ETP AREAS AT TNPL UNIT - II, TRICHY.
SHUTDOWN ELECTRICAL WORKS IN WTP, ETP AND CHP AT TNPL UNIT-II, TRICHY
COPPER STRIP WITH ROUND EDGES SIZE: 70X10 (MM) GRADE: CU-ETP R250 ( PAC Only ), COPPER STRIP WITH ROUND EDGES SIZE: 65X25 (MM) GRADE: CU-ETP R250 ( PAC Only )
LAYING OF CABLE FROM ETP TO CANTEEN MCC AT TNPL UNIT - II
State plan 2022-23 Quality Monitoring and surveillance (WQMS) and Effluent Quality Testing Labs under Quality Control Division, Kochi-Setting up of Effluent Testing Laboratory at Kizhakkumpattukara, Thrissur District.
Annual Maintenance and Operation Service of 500 KLD STP Plant and 100 KLD ETP plant at Hospital Complex, AIIMS, Bhubaneswar, for the year 2023-24
PROCUREMENT OF COMPLETE SET OF EFFLUENT DISPOSAL PUMP WITHOUT MOTOR FORDM PLANT ST 1 BARH
Supply and installation of Fluid feeder and Effluent discharge units as per Specifications: 1) Effluent discharging chamber made of quick setting silica mix (4 cubic feet each) - 2 nos, 2) Concealed
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; Operation and maintenance of STP plant Complete System OEM or experienced firm Functional under Warranty but outside AMC; Operation and maintenance of STP plant Compl.., ... of Effluent /Sewage ... of ETP plant ... of ETP plant
Maintenance and Removal of Wet silt from HEMM Washing platform, drains, oil and grease traps etc., at Base Workshop ETP and CHP ETP for the year 2026- 27, RG-II Area
Preparation of Detailed Project Report (DPR) along with preparation of Environmental Impact Assessment (EIA) reports, for CETP at Kalyani T.P, Nadia.
Soil Drain gut No 3,4 Terracing Gut No 5,6 Effluent Controkl Gut No 7
BARE COPPER WIRE 22 SWG IS: 191-1980 (PART-V) ETP GRADE, THIRD REVISION.
BARE COPPER WIRE 22 SWG IS: 191-1980 (PART-V) ETP GRADE, THIRD REVISION.
BARE COPPER WIRE 22 SWG IS: 191-1980 (PART-V) ETP GRADE, THIRD REVISION
Providing and laying PPR pipeline 75mm (STP line supreme PN 10) from RCC sewerage tank at HPSIDC Ind. Area Baddi to CETP pipeline.
Supply and Installation of 300 KVAR 0.4 KV automatic power factor control panel APFC for 6 MLD CETP Plant at TDS City GZB
Design, Engineering, Supply, Testing, Documentation, Supervision of Installation and Commissioning for Augmentation of Rockwell DCS of CETP unit at IOCL Gujarat Refinery, Vadodara.
PROVIDING AND LAYING DRAINAGE LINE AT Akkalkot road MIDC ERT Chowk to bel ceramic hub to CETP plant to bel ceramic hub,solapur
Supply, installation and commissioning of online monitoring system for CETP at KINFRA Food Processing industrial Park at Adoor including AMC for 3 years
Construction of embankment for diversion of water near Shani temple and proposed land for CETP Salarpur on approach road to I/A Khushkhera
BMC FOR P-34 EFFLUENT AMMONIA ANALYZER IN UREA PLANT AT RCF LTD. THAL,FOR TWO YEARS
Disposal of waste effluent in the dumping yard located in Municipal Area Pindwara
Regular lifting of effluent water from drains at Industrial Estate, Sriganganagar (2022-23)
Civil works for height increasing of Raw Effluent Sump at Milma Kozhikode Dairy
Repair Maintenance of Sewage Effluent Pipe Line at certain places at Lalgarh Jattan
Operation and Maintenance of Effluent/Sewage Treatment Plant - OPERATION OF SEWAGE TREATMENT PLANT
REPAIR AND REPLACEMENT OF FEED EFFLUENT EXCHANGER E-5101 AT RCF THAL SITE
Providing Specialized treatment to the Effluent sump No.-4 at Waluj Industrial Area.
Sale of acidic raffinate effluent from ZOP on as is where is basis
Comprehensive Biennial Maintenance Contract for EQMS Effluent Quality Monitoring System of NTPC Singrauli
Single door 350-450 Liters Laboratory Refrigerator for Bio-Toilet Effluent Testing Lab
Operation and Maintenance of Effluent/Sewage Treatment Plant - For 02 separate Complete Systems