Loading…
Loading…
198 results • Best match
Z&D zoyo device 10 Port Charging Station
REGARDING EV CHARGING STATION AND CONSTRUCTION OF 11 KV UNDERGROUND LINE UNDER DEPOSITE SCHEME
Development of Public Charging Stations including Battery Swapping System (optional, based on demand survey) for EVs through PPP mode along various Expressways in the State of Uttar Pradesh.
Khas Gas with Charging station P/N I0311040 (Q3)
Quantum of works for new connection of EV charging 2025-26 under the area of EDD-IV Bangarmau, Unnao.
Setting Up of Charging Stations for Electric Vehicles along Noida-Greater Noida Metro Corridor
C79471300526a Exhaust Fan - 9 inch, C84140000057b Exhaust Fan 300 MM - For CRL, C86775013498c BLDC Ceiling Fan 1200 MM, C70040050084d Electric Geyser 25 LTR Capacity, C80540000257e EV Charging Station, 100000000000f Installation Testing and ... Fast EV Charger , ... for EV Charger excluding ... for EV Charger excluding ... for EV Charger excluding ...
Rechargeable LED Torch and Charging Station as per attached annexure.
RFP for Developement of charging stations through design, build, finance, operate maintain in and Ghaziabad city
Selection of Implementation Agency for setup operation Public Charging Stations PCS on PPP Mode in Prayagraj
Design, fabrication, and supply of a fully integrated Electric Supply Feeder Pillar suitable for 30 kW EV charging panel at IIIT-A
For New Connection 120 kw, LMV 11, Vehicle Charging Station Panitanki Ramnagar AND for New Connection 150 KW, LMV 11, Vehicle Charging Station Newada Sundarpur near Mahila Polytechnic VNS
Electrification of Bus Charging Station at Near Shahpur Thana Under Deposit Scheme
Unbranded 2 0 A to 30 A for each charging station Lead Acid Floor, Unbranded 2 0 A to 30 A for each charging station Lead Acid Floor mounted with wheels
GREENWR 2 0 A to 25 A for each charging station Lead Acid Floor, GREENWR 2 0 A to 25 A for each charging station Lead Acid Floor mounted with wheels
APCOM 2 0 A to 30 A for each charging station Lead Acid Floor, APCOM 2 0 A to 30 A for each charging station Lead Acid Floor mounted with wheels
Unbranded 2 0 A to 30 A for each charging station Lead Acid Floor, Unbranded 2 0 A to 30 A for each charging station Lead Acid Floor mounted with wheels
Unbranded 2 0 A to 25 A for each charging station Lead Acid Floor, Unbranded 2 0 A to 25 A for each charging station Lead Acid Floor mounted with wheels
Unbranded 2 0 A to 25 A for each charging station Lead Acid Floor, Unbranded 2 0 A to 25 A for each charging station Lead Acid Floor mounted with wheels
Unbranded 2 0 A to 25 A for each charging station Lead Acid Floor, Unbranded 2 0 A to 25 A for each charging station Lead Acid Floor mounted with wheels
Unbranded 2 0 A to 25 A for each charging station Lead Acid Floor, Unbranded 2 0 A to 25 A for each charging station Lead Acid Floor mounted with wheels
Unbranded 2 0 A to 25 A for each charging station Lead Acid Floor, Unbranded 2 0 A to 25 A for each charging station Lead Acid Floor mounted with wheels
Unbranded 2 0 A to 25 A for each charging station Lead Acid Floor, Unbranded 2 0 A to 25 A for each charging station Lead Acid Floor mounted with wheels
sia 2 0 A to 30 A for each charging station Lead Acid Floor, sia 2 0 A to 30 A for each charging station Lead Acid Floor mounted with wheels
Unbranded 2 0 A to 25 A for each charging station Lead Acid Floor, Unbranded 2 0 A to 25 A for each charging station Lead Acid Floor mounted with wheels
NANA 2 0 A to 25 A for each charging station Lead Acid Floor, NANA 2 0 A to 25 A for each charging station Lead Acid Floor mounted with wheels
Unbranded 2 0 A to 30 A for each charging station Lead Acid Floor, Unbranded 2 0 A to 30 A for each charging station Lead Acid Floor mounted with wheels
Unbranded 2 0 A to 30 A for each charging station Lead Acid Floor, Unbranded 2 0 A to 30 A for each charging station Lead Acid Floor mounted with wheels
The work for New Connection of Electric Vehicle Charging Point Kashi Bus Dipo (Golgadda), Varanasi, UEDSD-I, Kashi under EE, Rajghat, Varanasi in Deposit Scheme on Semi Turn Key Basis
Charging Station complete for operating 50 Nos electrical buses at mirja murad varanasi
Const. of E-Bus Charging Station for 6 Buses at NPP Mishrikh, Namisharanya, Sitapur
Construction work of Charging Station for Operating 100 Nos. Electric Buses at Distt.- Ayodhya (U.P.)
Improvement of road From N.H.A.I To Bus Charging Station Gram Ahirwa ward-31 under zone 2.
Work for Erection of new 11 KV Line for giving Charging Station Connection Under Deposit Scheme
Elak 2 0 A to 25 A for each charging station Lead Acid Floor mounted with wheels
Unbranded Heavy Duty Battery Charger with Output DC Current - 0 A to 25 A for each charging station
License for Supply Installation Testing Commissioning Operation and Maintenance of Electric Vehicles Charging Station at LBSI Airport Varanasi
Naini mein Mirjapur Road se charging station ke saamne hote hue Arail road tak sadak marammat ka karya.
Unbranded Heavy Duty Battery Charger with Output DC Current - 0 A to 25 A for each charging station
Unbranded Heavy Duty Battery Charger with Output DC Current - 0 A to 25 A for each charging station
Mahesra sthit Bus charging station se mukhya marg (pich Road) tak approach marg par CC Road Nirman Karya.
Maheshra charging station ke nikat vahan parking Hetu khadanja boundary wall aur guard room ityadi ka Nirman Karya
Supply and Installation of Copper Wire, Shore Panel and Junction Box for Electrical Catamaran Charging Station in Varanasi.
Unbranded Heavy Duty Battery Charger with Output DC Current - 0 A to 25 A for each charging station
Unbranded Heavy Duty Battery Charger with Output DC Current - 0 A to 25 A for each charging station
Unbranded Heavy Duty Battery Charger with Output DC Current - 0 A to 25 A for each charging station
Unbranded Heavy Duty Battery Charger with Output DC Current - 0 A to 30 A for each charging station
Unbranded Heavy Duty Battery Charger with Output DC Current - 0 A to 25 A for each charging station
Construction of Office and residential quarter, T-II 8 Nos, Type-III 3 Nos, Type-IV 3 Nos and Type-VII 2 Nos Income Tax Appellate Tribunal at Gomti nagar Extension, lucknow (U.P.)(SITC of Electric Vehicle Charging System)
Construction of 18.00 Mtr. Wide Road and R.C.C. Drain for Prayagraj City Transport E-Charging Station at Naini, Prayagraj