Loading…
Loading…
8,330 results • Best match
Providing sanitary Napkin vending machine with incinerator at ladies toilet blocks of LOT No.8 and Namkhana in connection with Ganga Sagar Mela - 2025
Improvement of road from Chatai Khal to Jayramchak Mela Prangan within Daspur-II Panchayat Samity area in the District of Paschim Medinipur. (2nd call)
Construction of Brick paved Pilgrim road 8 for a length of 0.230 K.M. at Lot-8 under Kakdwip Irrigation Division i.c.w. G.S. Mela-2025
Patch repairing of all service roads and approach roads to Central Mela Ground for the Kolkata - International Book Fair-2025 under Bidhannagar Municipal Corporation.
Construction of Brick paved Pilgrim road 6 for a length of 0.180 K.M. at Lot-8 under Kakdwip Irrigation Division i.c.w. G.S. Mela-2025
Engagement of 01 (One) Hired Wrecker (Break down) Van excluding Fuel and Lubricant Charges under Diamond Harbour Police District for Ganga Sagar Mela 2023
Supply and delivery of submersible pumping machinery at Ganga Sagar Mouza and adjacent water supply scheme, Sagar Block in connection with GS Mela - 2025
Arrangement for providing Decorative Lighting during Durga,Kali puja at PTS,TTS FHC, Ananda Mela, Flower show ,CHAT PUJA at PTS at NTPC,Farakka .
Misc. electrical repairing works at Urmimala Generator room, Security room, new panel room and barrick generator room in connection with Ganga Sagar Mela-2024.
Temporary Sanitary arrangement including engagement of sweepers, mathors at Outram Ghat in connection with Ganga Sagar Mela-2020 under Alipore Division, P.H. Engineering Dte.
Construction of temporary structures of District Magistrate and repairing and maintenance of bridge No. 1,2 , 3 , 4 in connection with with GS Mela-2026
Construction of temporary structures for other Govt. officials in connection with G.S Mela-2024 under Kakdwip Sub-Division of Alipore Division, P.H. Engineering Dte.
Carpeting of road from Geet Khola Mela Tar to Jugay Pani Via Himuldara Lower Git-Beong G.P Block-II AED, G T A, Kpg
Construction of Brick paved Pilgrim road 8 for a length of 0.230 K.M. at Lot-8 under Kakdwip Irrigation Division i.c.w. G.S. Mela-2026
Construction of temporary approach cum ramp for pilgrims near Jetty no.-4 at - Kashtala, Kachuberia point under Kakdwip (I) Division i.c.w G.S. Mela- 2025.
Construction of temporary special latrine at Halderchak Bus Buffer Zone within Kulpi Block including maintenance of latrine in connection with Ganga Sagar Mela-2023.
Laying of pipeline at Benuban and Chemaguri Point in connection with Ganga Sagar Mela-2023 under Canning Sub-Division of Alipore Division, P.H.E. Dte.
Repair to temporary wooden Jetty at Benuban point under Sagar Irrigation Sub-division of Kakdwip Irrigation Division in connection with Ganga Sagar Mela-2022.
Making temporary gate with decorative illumination arrangement at Road No-1 Beach end Ganga Sagar Main Island in connection with Ganga Sagar Mela 2024
Construction of temporary bus stand with brick paved road from vehicle turning area to parking zone, at Hardwood point for ensuing GS Mela 2020
Street light arrangement at Road No-1,2,3,4,5 K1 - K2 Bus Stand and adjacent area for Maghipurnima 2025 in continuation with Ganga Sagar Mela 2025
Temporary Bamboo barricading works at Kachuberia for Ganga Sagar Mela 2020 in the district of South 24 Parganas during the year of 2019-20.
Construction of Community Toilet at Shanksahar Baman Peer Mela Under Bhangar-1 Panchayat Samity. Mouja - Shanksahar, JL No-119 Plot No-1845(TIED Fund)
Hiring and installation of High light intensity ( Fog Light) for Jetty at Lot-8, Kakdwip and Kachuberia in connection with Ganga Sagar Mela 2025
Illumination and water supply arrangement including hiring of generator set at Kolkata Bus Stand near Outram Ghat in connection with Ganga Sagar Mela 2023
Construction of temporary structures and Fire Fighting arrangement and Temporary Special Latrine at Kachuberia Point in connection with G.S Mela-2022 (At Kachuberia Point).
Construction of temporary structures for N.G.O. and Police Staffs in connection with Gangasagar Mela-2026 under Kakdwip Sub Division of Alipore Division, PHE Dte.
Repair to temporary wooden Jetty at Benuban point under Sagar Irrigation Sub-division of Kakdwip Irrigation Division in connection with Ganga Sagar Mela-2023.
Supply of 100 percent Compostable and Biodegradable Organic Carry Bag Garbage Bag Bio Matterss, Water Glass and tea cup for green Gangasagar Mela 2024
Repair to temporary wooden Jetty at Benuban point under Sagar Irrigation Sub-division of Kakdwip Irrigation Division in connection with Ganga Sagar Mela-2021.
Construction of temporary structures for other Govt. Organisations and Police Staffs in connection with Ganga Sagar Mela-2023 under Alipore Division, P.H. Engineering Dte.
Providing innovating arrangement by laser radiation lighting with truss arrangement with allied works for Road No. 2 in connection with Ganga Sagar Mela 2025.
Fooding arrangement for on duty officers Guest Canteen at lot no 8 as per direction for ensuing G. S. Mela- 2023 under Kakdwip P.S
Construction of bitumenous road at Lot -8 Pilgrim road -3 at mouza- Kalinagar, under Kakdwip Irrigation Division in connection with Ganga Sagar Mela-2022.
Construction of temporary Duty shed at Harwood point near parmanent Jetty No-4 , under Kakdwip Irrigation Division in connection with Ganga Sagar Mela, 2023.
Supply and delivery of submersible pumping machinery with allied materials for Krishnanagar and adjacent area of Sagar Block in connection with GS Mela - 2024
Supply of 100 percent Compostable and Biodegradable Organic Carry Bag Garbage Bag Bio Matterss Water Glass and tea cup for green Gangasagar Mela 2023
Temporary sanitary latrine at Bishnupur High School Ground and KGEI Campus for 35th Bishnupur Mela, 2022 under Bishnupur Sub-Division of Bankura Division P.H.E.Dte.
Temporary pandal, toilets, kitchen shed etc with Civil work at Mohana Bungalow as per direction for ensuing G. S. Mela- 2023 under Kakdwip P.S
Construction of bitumenous road at Lot -8 Pilgrim road -4 at mouza- Kalinagar, under Kakdwip Irrigation Division in connection with Ganga Sagar Mela-2022.
Construction of temporary structures for D.M. Office, Flex printing and ancillary works in connection with Ganga Sagar Mela-2021 at Outram Ghat Transit Point.
Supply fitting and fixing of Furniture, Showcase and Glass fixing for decorating to City Livelihood Center (CLC)in Pre Puja Mela within Haldia Municipality
Ditch filling along with cleaning of campus of rest shed of Mayagoalia Irrigation Section at Mayagoalia under Kakdwip (I) Division i.c.w. Gangasagar Mela 2024.
Construction of community leach pit at Bhuinphore Teli Para, Bhuinphore Bauri Para, Goaldanga Ghosh Para, Goaldanga Mansa Mela, Kendrabonthole D Para and Ramarbhuin ICDS
Supply and delivery of Polyfilm Roll for making pouch from MTU at Kolkata Bus stand Outram Ghat in connection with Ganga Sagar Mela - 2025
REPAIRING OF E.M. BYPASS IN PATCHES NEAR DHAPA ROAD, P. C. CONNECTOR NEAR MILAN MELA, RASHBIHARI CONNECTOR NEAR ACROPOLIS MALL ETC. UNDER BR-VII.
Construction of Temporary Hogla Structure for toilet labour shed in connection with G.S. Mela 2026 under Kakdwip Sub-Division of Alipore Division, PHE Dte.
Display arrangement for public information and pilgrims awareness system on hire basis at different places of Kachubaria,Benuban for Gangasagar Mela 2026. (2nd Call)
Construction of temporary structures for Fire Brigade Staff in connection with GS Mela-2024 under Kakdwip Sub-Division of Alipore Division, P.H. Engineering Dte.
Surface Dressing and sand filling at Lot No-8 Harwood Point in Connection with Gangasagar Mela -2025 under Kakdwip Panchayat Samity, South 24-Parganas