Loading…
Loading…
28 live11 closing this weekmost from PWD and Add. Secretary (Urban Development)
28 results • Best match
Maa Durga Pooja Mahotsav 2026 Tender
Event or Seminar or Workshop or Exhibition or Expo Management Service - National; Theme Based Events; IT related work; Buyer premise; Three day
1885 BAIKUNTH CHATURDASHI MELA ME SOUND KI NIVIDA
BAIKUNTH CHATURDASHI MELA ME STALL FAD JHULA CHARKHI KI NIVIDA
Construction work of temporary steel pile girder motor bridge adjacent to the under-construction Haridwar Bypass road to connect Jagjeetpur to Dakshdweep and dismantling work after completion of the Mela, under Kumbh Mela-2027 (Including steel mater
REQUEST FOR PROPOSAL FOR SELECTION OF AN AGENCY FOR SOCIAL MEDIA MANAGEMENT FOR HARIDWAR KUMBH MELA 2027
Improvement work by BC (Bituminous Concrete) from Km 0.00 to 5.00 of Pashulok Barrage Road under Kumbh Mela Infrastructure Development work-2027.
Renewal by Microsurfacing from Km 2 to 9 of Roorkee Laksar Balawali SH-26 motor road under Kumbh Mela Infrastructure Development 2027.
Renewal by B.C. from km 10 to 19 of Roorkee-Laksar-Balawali (S.H. 26) motor road under Kumbh Mela Infrastructure Development 2027
Design, supply and installation of location identification, multi-directional, directional and other sign boards within the core area under Kumbh Mela-2027.
Custom Bid for Services - Hiring and Management of High End Audio, Video and Lighting System Similar Category Event or Seminar or Workshop or Exhibition or Expo Management Service
DEVELOPMENT, OPERATION AND MAINTENANCE OF TEMPORARY WAY SIDE AMENITIES AND PARKING INFRASTRUCTURE IN THE IDENTIFIED PERIPHERAL LAND UNITS DURING KUMBH MELA 2027 IN HARIDWAR
Renewal of Tanda Mahtoli Tiraha to Sherpur motor road by BC and interlocking tiles in the populated area under Kumbh Mela Infrastructure Development Year 2027.
Improvement work by DBM and BC from Km 5 to 9 of Bahadrabad Dhanauri Imlikheda Bhagwanpur Gagalheri motor road under Kumbh Mela Infrastructure Development 2027.
Request for Proposal (RFP) for Selection of an Operator for Setting Up, Operation and Maintenance of a Cafeteria at Mela Bhawan, Har Ki Pauri, Haridwar
SELECTION OF AN AGENCY FOR CONCEPTUALIZATION DESIGN FABRICATION INSTALLATION OPERATION and MAINTENANCE, AND DEINSTALLATION OF THEMATIC TEMPORARY GATES AT VARIOUS LOCATIONS DURING HARIDWAR KUMBH MELA 2027
NOTICE INVITING PROPOSAL FOR APPOINTMENT OF A SERVICE PROVIDER FOR INSTALLATION, OPERATION AND MAINTENANCE OF DIGITAL SCREENS AT VARIOUS LOCATIONS FOR HARIDWAR KUMBH MELA 2027 ON A LICENSE FEE BASIS
Work of renewal by microsurfacing on the Jwalapur Sarai Aithal Basedi Khadar SH 66 motor road from km 15 ch 14.800 to km 21 under the Kumbh Mela Infrastructure Development 2027
Renewal work by microsurfacing of four-lane road ODR-35 from National Highway Number 58 (Old) to Industrial Area in B.H.E.L. Ranipur Constituency of district Haridwar under Kumbh Mela Infrastructure Development
Supply, laying and Jointing of temporary pipelines, stand posts, PVC tanks, temporary water connections, installation of water filters, maintenance of related works and dismantling works in Gauri Shankar sector Under Kumbh Mela 2027
Supply, laying and Jointing of temporary pipelines, stand posts, PVC tanks, temporary water connections, installation of water filters, maintenance of related works and dismantling works in Bairagi Camp Sector Under Kumbh Mela 2027
Repair work of Ganga Canal Kanwar Patri from Jatwara Bridge to Mohammad Power House in district Haridwar upto the border of Uttarakhand State under Kumbh Mela 2027 (chainage 6.260 Km to 51.910 Km)
Under Kumbh Mela 2027 Improvement and surface laying by BC (Bituminous Concrete) on Natraj BhadrKali motor road from km 0.00 and km 2.70 (total length 2.70 ) in the Narendranagar constituency of District Tehri Garhwal.
Renewal by B.C. from km 1 to 6.80 of other District road from Military Chowk located on National Highway 58 to Village Saliyar (Old N.H.-73) in Roorkee Constituency of Haridwar district under Kumbh Mela Infrastructure Development 2027.
Scheme for the repair of chains, railings, and flooring at various ghats located in the Swargashram area on the left bank of the Ganga River, under the Yamkeshwar Block of District Pauri Garhwal, for the Kumbh Mela 2027.
Under Kumbh Mela - 2027 the Interlocking tiles work on the Lakshman Jhula link road, surface laying by BC (Bituminous Concrete ) on the Ram Jhula link road and Janaki Jhula link road in the Narendranagar constituency of District Tehri Garhwal.
Kumbh Mela - 2027 work of widening using interlocking tiles on the hillside shoulder, surface laying by BC (B.C.), drain repair, damaged walls, and cross-drain construction on the Vitthaldas Ashram motor road (km 1 to 3) in Muni ki reti, Ditt. T.G.