Loading…
Loading…
8,330 results • Best match
Construction of ramp at Gangasagar of PR Road No-05 under Sagar Irrigation Sub-Division of Kakdwip Irrigation Division in connection with Gangasagar Mela-2023.
Temporary arrangement for sanitary and plumbing works at Press (Main Compound, 2nd Campus and 3rd Campus) other miscellaneous works in connection with G.S Mela-2024.
Construction of water supply arrangement including maintenance of pipeline at Halder chak Bus Buffer Zone within Kakdwip Block in connection with Ganga Sagar Mela-2022.
Construction of temporary structures for other Govt. officials in connection with Ganga Sagar Mela-2022 under Kakdwip Sub-Division of Alipore Division, P.H. Engineering Dte.
Making temporary gate with decorative illumination arrangement at Road No-2 Near Bharat Sevasangha Ganga Sagar Main Island in connection with Ganga Sagar Mela 2024
Construction of temporary making Corrugated Iron Sheet Walling at Outram Ghat Point in connection with Ganga Sagar Mela-2023 under Alipore Division, P.H. Engineering Dte.
Construction of approach way from PWD metal road to Harwood Point Ground in Connection with Gangasagar Mela -2025 under Kakdwip Panchayat Samity , South 24-Parganas
Temporary arrangement for illumination ,PA system water supply for Bus Buffer Zone at Pakhirala Vivekananda High School Ground in Connection with Ganga Sagar Mela -2024
Supply of Bedding materials with repairing bed at Zilla Parishad Sagar Inspection Bungalow as per direction for ensuing G. S. Mela- 2023 under Sagar P.S
Supply and Installation of Led smart Television and Air condition machine at Urmimala and Urmimukhur Bunglow, Sagar Island in connection with Ganga Sagar Mela- 2025
Ghosh Para Mela Jatri Nibash Colour Coated shade with M.S. Hollow Section(structural work only), Near Nabarun Sangha in ward no-04, under kalyani Municipality
Repairing and maintenance of 01 no. Pressure Filter near Tank No. 3 along with laying distribution system for Zone-II area at Sagar Mela Ground ..
Construction of temporary approach cum ramp 2 (Two) nos. for pilgrims, near Culvert at Kashtala, Kacuberia point under Kakdwip (I) Division i.c.w G.S. Mela- 2025.
Making temporary gate with decorative illumination arrangement at main road near PR8, Near PHE Camp Office LOT-8 in connection with Ganga Sagar Mela 2024
Supply and delivery of submersible pumping machinery and Starter Panel at Chemaguri and adjacent water supply scheme, Sagar Block in connection with GS Mela - 2025
Dredging before Ganga Sagar Mela 2025 in Muriganga river in connection with Dredging in river Muriganga in PSs Kakdwip and Sagar, District South 24 Parganas
Miscellaneous work of Ganga Sagar PHE campus, Sagar Block in connection with Ganga Sagar Mela 2024 under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte.
Protection of ponds beside Bypass Road for pilgrims inbetween P.M.G.S.Y road and Bituminous road, at Kastala,Kachuberia point under Kakdwip (I) Division i.c.w G.S. Mela
Dredging before Ganga Sagar Mela, 2024 in Muriganga River in connection with Dredging in river Muriganga in P.S. - Kakdwip and Sagar, Dist.-South 24 Parganas
Providing uniquely colour printed designer box on hire basis from sreedham to K1 Bus stand at Ganga Sagar in connection with Ganga Sagar Mela - 2025
Miscellaneous repairing and renovation of Kakdwip Sub Division office in connection with Ganga Sagar Mela 2024 under Kakdwip Sub - Division of Alipore Division, P.H.E. Dte.
ENROUTE BRANDING FROM KULPI MORE TO NISCHINTAPUR MARKET (NH-117 BOTH SIDE ON ROAD) FOR GANGASAGAR MELA -2023 UNDER KULPI DEVELOPMENT BLOCK , SOUTH 24 PARGAS.
Erection of temporary barricading at Sagar Island in the district of South 24- Parganas on ensuing of Gangasagar Mela-2024. Under Diamond Harbour Division P.W.D..
Making temporary gate with decorative illumination arrangement at main road near K1 Bus stand ,Ganga Sagar Main Island in connection with Ganga Sagar Mela 2025
Erection of temporary barricading at Sagar Island in the district of South 24- Parganas on ensuing of Gangasagar Mela-2025. under Diamond Harbour Division P.W.D.
Construction of temporary B. P. road from New Bus stand to Irrigation sluice at Kashtala, Kachuberia point under Kakdwip (I) division i.c.w G.S. Mela 2025
Supply and fitting fixing of flex board and allied works at 4 four Nos Bufferzone of Sagar Island in connection with Ganga Sagar Mela - 2025
Supply and installation of electric Anti Smog Gun ,Electric Portable Sand Cleaning Machine and Fuel Free Solid Waste Incinerator for Eco Friendly Gangasagar Mela-2026
Making temporary gate with decorative illumination arrangement at Road No-1 Near Irrigation Bunglow Ganga Sagar Main Island in connection with Ganga Sagar Mela 2024
Construction of ramp at Gangasagar of PR Road No-04 under Sagar Irrigation Sub-Division of Kakdwip Irrigation Division in connection with Gangasagar Mela-2023
Making temporary gate with decorative illumination arrangement at Road No-2 Near Sea Beach Ganga Sagar Main Island in connection with Ganga Sagar Mela 2025
Installation of VIP Hanger for point in charge room besides Mohana Bungalow including branding all taxes for ensuing G. S. Mela- 2023 under Kakdwip PS.
Construction of ramp at Gangasagar of PR Road No-01 under Sagar Irrigation Sub-Division of Kakdwip Irrigation Division in connection with Gangasagar Mela-2022.
Construction of Temporary Hogla shed for Hospital at Lot No-8 point in Connection with Gangasagar Mela -2025 under Kakdwip Panchayat Samity, South 24-Parganas
Dredging before Ganga Sagar Mela, 2023 in Muriganga River in connection with Dredging in river Muriganga in P.S. - Kakdwip and Sagar, Dist.-South 24 Parganas.
Errection of temporary Corrugated Iron Sheet Walling at Outram Ghat Transit Point in connection with Ganga Sagar Mela-2024 under Alipore Division, P.H. Engineering Dte.
Construction of Cement Concrete road from Basanti Mela Pacca Road to h/o Malin Royin 17/276,277 sansad under South Berubari GP. Fund-15th FC.
Construction of temporary structures for Volunteer Organization (WBCEF, Lal Baba, Jogendra Math Onkarnath) in c/with GS Mela-2025 under KSD of AD, PHE Dte.
Organization of a rally from K1 Bus stand to Gangasagar Beach No.1 to give message of mangrove preservation in c/w Gangasagar Mela, 2026
Re- Installation of permanent Drop Gate in connection with Gangasagar Mela -2025 at Lot No- 8 Point under Kakdwip Panchayat Samity , Kakdwip, South 24 Parganas
Making delivery pipe line arrangement for fire fighting arrangement at Pakhirala-Vivekananda High School and Harinbari , Sagar Block in connection with Ganga Sagar Mela 2025
Construction of temporary hogla structure and other allied works in connection with Ganga Sagar Mela 2021 under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte.
Maintenance for Electrical Works at D M Circuit house, Annex Building, SGSY Bldg as per direction for ensuing G. S. Mela- 2023 under Sagar P.S
Providing camera Setup for the visit of Honble Chief Minister,Gov. of West Bengal at Outram Ghat, Kolkata in connection of Ganga Sagar Mela 2024
Construction of ramp at Gangasagar of PR Road No-05 under Sagar Irrigation Sub-Division of Kakdwip Irrigation Division in connection with Gangasagar Mela-2023.
Construction of temporary approach cum ramp 2 (two) nos. for pilgrims, near culvert at Kashtala, Kachuberia point under Kakdwip (I) Division i.c.w G.S. Mela- 2026
Repairing of 6 Nos submersible motor set for tube well of different water supply schemes at Ganga Sagar in connection with Ganga Sagar Mela-2024.
Construction of temporary making Corrugated Iron Sheet Walling at Outram Ghat Point in connection with Ganga Sagar Mela-2026 under Alipore Division, P.H. Engineering Dte.
Supply and delivery of submersible pumping machinery with allied materials for Kakdwip Stadium and adjacent area of Kakdwip Block in connection with GS Mela - 2024
Repair and maintenance of Office cum Rest Shed for PHE (Mechanical) at the premises of Kakdwip Sub Division Office in connection with G.S. Mela 2023.