Loading…
Loading…
8,334 results • Best match
Work for temporary installation of electrical arrangement with PA system at at vacant space of Development Office ( Handloom) , Suri , Birbhum in connection with the Birbhum District TANT BASTRA MELA-2023 TO BE HELD FROM 10.02.2023 TO 21.02.23
Water supply arrangement at LOT No.8 and lighting arrangement for Kashinagar, Kalinagar, Taxi stand, Kakdwip Roads, B.P. Road and other areas including emergency lighting at riverside, Jetty and surrounding area in connection with GS Mela 2022
Construction of Temporary Pandel with cloth decoration for movement control office of the District Magistrate, South 24- Parganas and Panchayat Samity/Block Development Officer ,Kakdwip and others at Lot No-8 in Connection with Gangasagar Mela -2024
Schedule for temporary erection of pandal , stalls , Gates , Decoration of stage etc. at vacant space of Development Office ( Handloom) ,Suri ,Birbhum in connection with the Birbhum District SARODIYA TANT BASTRA MELA-2024 TO BE HELD FROM 30.08.2024
Construction of temporary special latrine and other works for police officers and force accommodation at Maity more Kachuberia point in connection with Ganga Sagar Mela 2026 under Raidighi Sub-Division of Alipore Division, PHE Dte. (PART - A)
Temporary water supply arrangement including maintenance of pipe line and construction of temporary special latrine at Banganagar Bus Buffer Zone within Falta Block in connection with Ganga Sagar Mela 2024 under RWS Alipore Sub-Division. PHE Dte.
Construction of temporary hogla structures and temporary special latrine at different locations of Chemaguri Point including maintenance in connection with GS Mela 25 under Canning Sub-Division (For 12 Nos. each 4 Unit). (Chemaguri Point, PART - F)
Deployment of qualified, trained manpower for round the clock monitoring and coordinating with entrusted agency staff communicating through walkie talkie and mobile phones including setting up base station as per requirement in/C with G.S Mela 2026.
Decoration by temporary lighting system including hiring of DG Sets including providing adequate manpower for attending and operating of all temporary installations and DG for 48th International Kolkata Book Fair 2025 at Boi Mela Prangan Salt Lake
Construction of temporary structures for Clock Room at Bathing Zone in Sea Beach and Zig Zag Barricading with drop gate at Gangasagar in connection with Gangasagar Mela 2021 under Kakdwip Sub-Division of Alipore Division, PHE Dte.
Construction of temporary structures, Fire Fighting arrangement, Temporary Special Latrine at Kachuberia Point in connection with G.S Mela-2025 under Raidighi Sub-Divn. of Alipore Division, P.H.E Dte. (At Kachuberia Point) (for 30 Nos. each 4 Unit)
Mass awareness generation and IEC activities on Jal Jeevan Mission programme within the campus of different Festive places like Pandals during Durgapuja, Dipabali, during ID-Ud-Zoha, Chirtsmas and different MELA Campus etc (For Amta - II Block)
Water supply arrangement at LOT No.8 and lighting arrangement for Kashinagar, Kalinagar, Taxi stand, Kakdwip Roads, B.P. Road and other areas including emergency lighting at riverside, Jetty and surrounding area in connection with GS Mela 2023
Mass awareness generation and IEC activities on Jal Jeevan Mission programme within the campus of different Festive places like Pandals during Durgapuja, Dipabali, during ID-Ud-Zoha, Chirtsmas and different MELA Campus etc. at different Blocks und
Construction of temporary car parking zone at P.H.E.D camp office and making temporary approach road towards latrine and drinking water tanks with allied works at different locations of Namkhana point in connection with Ganga Sagar Mela 2023.
Temporary water supply arrangement including maintenance of pipe line and construction of temporary special latrine at Banganagar Bus Buffer Zone within Falta Block in connection with Ganga Sagar Mela 2025 under RWS Alipore Sub-Division, PHE Dte.
Construction of temporary hogla structures and temporary special latrine and other allied works at Chemaguri G.P. Ground in connection with Ganga Sagar Mela-2021 under Raidighi Sub-Division of Alipore Division, P.H.E. Dte. (Chemaguri Point, PART-E)
SPECIAL REPAIRS AND IMPROVEMENT OF SEMI-PERMANENT JETTY NO 3 AND JETTY NO-2 ON THE LEFT BANK OF RIVER MURIGANGA AT LOT NO. -8 MOUZA KALINAGAR UNDER KAKDWIP IRRIGATION DIVISION IN CONNECTION WITH GANGASAGAR MELA-2021
Mass awareness generation and IEC activities on Jal Jeevan Mission programme within the campus of different Festive places like Pandals during Durgapuja, Dipabali, during ID-Ud-Zoha, Chirtsmas and different MELA Campus etc. at different Blocks und
Painting, Plumbing, wood works and other allied works at different pump house, boundary wall and different building at Sagar PHE Campus and adjacent to the main road from Kachuberia to Sagar in connection with Gangasagar Mela 2023.
Repairing and mtc. of Pressure Filter at Sagar Mela Ground, Laying of Distribution main of Ganeshpur (Left out areas), Engagement of Valve Operator at Budhakhali PWSS and Engagement of Ex-Serviceman Security Guard at Kakdwip, Patharpratima Block.
Deployment of qualified and trained manpower for proper cleaning of toilets, disposal of wastes, etc. and supply and installation on hire basis Printed Flex Banner, Cloth Banner and supply of sanitizing materials etc. i.c.w. G.S. Mela 2023.
Temporary Errection of PHE stage, anti-chamber, making of sanitary arrangement for Office use, flower decoration and other allied works in connection with Ganga Sagar Mela - 2025 at Outram Ghat Transit Point under Alipore Division, PHE Dte.
Land development and G.I. tank stack platform at pump house no. - 1 (Zone- II) of Kachuberia Water Supply Scheme, Sagar Block in connection with Ganga Sagar Mela 2020 under Raidighi Sub-Division of Alipore Division, PHE Dte.
Stamp concreteting work beside water testing laboratory and pressure filter structure near Pond No. 1 within the premises of Sagar PHED Campus in connection with G.S. Mela 2023 under Kakdwip Sub - Division of Alipore Division, P.H.E. Dte.
Construction of temporary structures For Barabazar Zamadar Sangha, Boys Scout, Royal Life Saving Society, Jogendra Math (Onkarnath) and Temporary Special Latrine at 1no. Sea Beach Area with in connection G.S Mela-2025 under Alipore Division, PHE Dte.
Construction of temporary hogla structures, latrine and other allied works at Chemaguri and Benuban point in connection with Ganga Sagar Mela-2026 under Canning Sub-Division of Alipore Division, P.H.E. Dte. (Chemaguri and Benuban Point, PART - I)
Construction of temporary car parking zone at P.H.E.D camp office and making temporary approach road towards latrine and drinking water tanks with allied works at different locations of Namkhana point in connection with Ganga Sagar Mela 2024.
Mass awareness generation and IEC activities on Jal Jeevan Mission programme within the campus of different Festive places like Pandals during Durgapuja, Dipabali, during ID-Ud-Zoha, Chirtsmas and different MELA Campus etc. at different Blocks und
Temporary water supply arrangement, construction of temporary special latrine and maintenance and erection of Swiss cotton tents at different places of Lot-8 in connection with Ganga Sagar Mela-2020 under Alipore Division, PHE Dte. (Part-I)
Construction of temporary hogla structures and latrine at different locations and allied works related toilet block of Chemaguri and Benuban Point in connection with Ganga Sagar Mela-2026 under Canning Sub-Division of Alipore Division, PHE Dte.
Re-construction of damaged sea shore in between PR no - 01 and PR no - 05 in front of Kapilmuni Ashram at Mouza-Gangasagar in Block ,P.S-Sagar, Dist- South 24 parganas in connection with Gangasagar Mela-2024
Construction of temporary special latrine at different locations and allied works related toilet block of Kachuberia Point including maintenance of latrine i.c. with Ganga Sagar Mela-2022 (Kachuberia Point, PART-B) . (For 20 Nos. each 4 units)
Construction of temporary hogla structures and temporary special latrine and other allied works at Chemaguri G.P. Ground in connection with Ganga Sagar Mela-2022 under Raidighi Sub-Division of Alipore Division, P.H.E. Dte. (Chemaguri Point, PART-D)
Construction of temporary structures for Clock Room at Bathing Zone in Sea Beach and Zig Zag Barricading with drop gate at Gangasagar in connection with G.S Mela 2025 under Kakdwip Sub-Division of Alipore Division, PHE Dte.
Construction of temporary bus stand with brick paved road from vehicle turning area to parking zone, Barricading and Drop gate at Lot No. 8 near Mohana Bungalow under DHHD for ensuing Ganga Sagar Mela 2023 Front side
Construction of Temporary structure and Fitting, fixing FHL Valve on the existing pipe line, fixing bamboo post for demarcation for Fire Fighting including temporary special latrine and allied works for Chemaguri Point i.c.w. Ganga Sagar Mela 2021.
Temporary water supply arrangement and construction of temporary special latrine including maintenance at Pailan Education Park Bus Buffer Zone within Bishnupur-I Block in connection with Ganga Sagar Mela 2025 under RWS Alipore Sub-Division, PHE Dte.
Errection Temporary Shed of Information Centre, Police Booth, Pilgrim Shed, Making DM Office, Const. of Latrine and Entrance Road etc. along with allied works at Bangabasi Ground in connection with Ganga Sagar Mela 2026. (Outram Ghat point)
Mass awareness generation and IEC activities on Jal Jeevan Mission programme within the campus of different Festive places like Pandals during Durgapuja, Dipabali, during ID-Ud-Zoha, Chirtsmas and different MELA Campus etc at different Blocks und
Construction of Temporary pandel and wooden platform at Gopal Nagar Ground Bus Buffer zone on the occasion of Gangasagar Mela - 2023 under Dimaond Harbour Highway Sub Division, P.W. (Roads) Directorate in the district of South 24 Pargana
Construction of temporary special latrine at different locations and allied works related toilet block of Kachuberia Point including maintenance of latrine in connection with Ganga Sagar Mela-2026 under Raidighi Sub-Divn. of Alipore Divn., PHE Dte.
Construction of Temporary Hogla shed for Bajrang Parishad, Bharat Sevashram sangha, Information, Lost Found, Fuel store of police etc. at Lot No-8 point in Connection with Gangasagar Mela -2025 under Kakdwip Panchayat Samity, South 24-Parganas
Installation of decorative water shed made by wooden ply at Suryabinda Pump House, Sagar ITI Collage, Bagbazar Harimoncho beside main road from Kachuberia to Ganga Sagar and beside Chemaguri Road in connection with Ganga Sagar Mela 2024.
Construction of temporary hogla structures and temporary special latrine at different locations and allied works related toilet block of Benuban Point and Chemaguri Point including mtc. of latrine in connection with Ganga Sagar Mela-2024 (PART- F)
Temporary Erection of Pilgrims Shed, Sadhu Shed, Hand Washing Arrangement, Sinking of 1(One) No. Tube well and Taxi Booth in connection with Ganga Sagar Mela-2025 under Alipore Division, P.H.E. Dte. (Location- Outram Ghat Transit Point)
Mass awareness generation and IEC activities on Jal Jeevan Mission programme within the campus of different Festive places like Pandals during Durgapuja, Dipabali, during ID-Ud-Zoha, Chirtsmas different MELA Uluberia Sub-Division Uluberia-I Phase II
Mass awareness generation and IEC activities on Jal Jeevan Mission programme within the campus of different Festive places like Pandals during Durgapuja, Dipabali during ID Ud Zoha, Chirtsmas and different MELA Campus etc. at different Blocks un
Protection and Stengthening of Jetty and yoke stage of semi-permanent jetty No 2 on the left bank of River Muriganga at Harwood point of Mouza Kalinagar under Kakdwip Irrigation Division in connection with Gangasagar Mela-2023
Construction of temporary hogla structures and temporary special latrine at different locations and allied works of Banuban Point including maintenance of latrine in connection with Ganga Sagar Mela-23 (For10 Nos.each 4 Unit)(Banuban Point,Part-A)