Loading…
Loading…
5,721 results • Best match
Selection of an Event Management Agency for Conceptualizing, Designing, Fabrication, Installation and Management of Exhibition Centre of UP Tourism at Maha Kumbh 2025
Fabrication Transportation Erection Launching of Composite Steel Girder and supply and fitting of Pot PTFE Bearing at ROB 4 SPL Keshari kheda Lucknow
Fabrication and Erection of wire mesh on super structure of Dam for safety of hydro mechanical equipment at Ohan Dam in District Chitrakoot.
Fabrication and installation of front cabin guard type - Tail gate protection system for 20 nos. 100T dumpers and water sprinklers of Bina Project.
Fabrication nd Fixing of 11 KV Fuse arrangment on Small and medium T/F (25 KVA to 100 KVA) under EDD-4 KIRAOLI.
Carriage/Transportation of Zinc from M/s Hindustan Zinc Limited stock yard at Faridabad to the store / stockyard of Electricity Fabrication Unit, Kannauj
Supply, Fabrication, Erection, Testing and Commissioning of Electrical System for service gate no. 01 to 18 at Govind Sagar Dam in District Lalitpur.
Supply, Fabrication, Erection, Testing and Commissioning of Motorization System for service gate no. 01 to 18 at Govind Sagar Dam in District Lalitpur.
PLC I/P Module, Part No.-DI32XDC24V 6ES7321-1BL00-0AA0 used in Robotic Under Frame Fabrication Line(s) & Robotic Roof Line MAKE-Siemens
Fabrication and supply of Light weight blinking RED Tail lamp for Guards as per the specifications Make/Brand : SELF OEM as per Specn.
Custom Bid for Services - Fabrication and Fitment of Main Gate and Parking Shed for G1-255 Similar Category Facility Management Services - LumpSum Based
Custom Bid for Services - 200139315 Fabrication and Erection work in Offsite area NTPC Unchahar Similar Category Operation and Maintenance Power House/Power Plant
Mounting and demounting of Final Drive assembly and cleaning and welding of Final Drive Housing (both LHS and RHS) of PandH-II shovel at Kakri Project.
Work of wrapping of insulation sheet on ST poles, barricading of transformer, welding of rusted poles etc. on occasion of Kanwar yatra under EDD-III, MBD
Quantum of works for welding of jarjar ST pole in different places (M and R) in the area od EDSD-II under EDD-V, Hasanganj, Unnao.
Repairing / rebuilding of assemblies and sub-assemblies with day to day welding related work of Drill machines of Khadia Project for a period of 365 days.
Repairing / rebuilding of assemblies and sub-assemblies with day to day welding related work of Drill machines of Khadia Project for a period of 365 days.
Work of wrapping of insulation sheet on ST poles, barricading of transformer, welding of rusted poles etc. on occasion of Kanwar yatra under EDD-II, MBD
Annual Maintenance contract of 59 nos. Welding Plants of various makes at Mechanical Workshop, Izzatnagar for a period of 02 year (As per scope of work)
Work of wrapping of insulation sheet on ST poles, barricading of transformer, welding of rusted poles etc. on occasion of Kanwar yatra under EDD-I, MBD
HEAVY DUTY EARTHING CLAMP WITH INSULATED HANDLES OF 600 AMPS FOR WELDING WORK.MAKE: ADOR /ESAB/MESSER AS PER TECHNICAL SPECIFICATION ATTACHED IN ANNEXURE. MAKE/BRAND - ESAB
WELDING ELECTRODES OF SIZE 3.15mm X 350mm, OF CLASS N2, SPECN. IRS.M-28-12, REV-0, TABLE-1. Firm's offer : As above, Make / Brand - ASIANGO ALLOY.
SOLID MIG / MAG WELDING FILLER WIRE, CLASS VI, SIZE 1.2 MM, SPECIFICATION NO.-IRS: M-46/13, GRADE ER 308L AS PER AWS: A 5.9-10
RUBBER HOSE FOR WELDING AND CUTTING WITH BARIDED TEXTILE REINFORCEMENT BORE 10MM COLOUR BLACK IS:447/1988.Shelf Life 24 Months. Firms offer make/brand- SWASTIK
Supply, Installation and Commissioning of Welding Transformer sets. 300Amps. Double Operated, Oil Cooled, Copper Wound as per Annexure-A Offer Make Brand:- OEM, SELF is accepted.
Manual Metal Arc Welding Electrodes, Size 3.15x350 mm. Class-N2 (Spec. No. IRS : M-28/2020) for Cutting & Chamfering Purpose. Firm offer make/ Brand- ASIANGO ALLOY
SK ARC RECTIFIER INVERTER BASED (IGTB) DOUBLE BRIDGE TYPE WELDING SET 415V THREE PHASE WITH TRAPPING TO COMPENSATE FOR VARIATION IN INPUT SUPPLY BRAND:- SK ARC
Metal Bond (E6013)WELDING ELECTRODE, SIZE 4.00X450MM.CLASSIFICATION:AWS A/SFA 5.1 IS814,140-190 AMPERE. MAKE ADOR OR SIMILAR (Warranty Period : Upto 30 Months from date of supply)
MS Welding Electrodes Class A1 Size-3.15x350 mm to IRS M28/2020 IS/AWS Specification IS:814/2004 , Amndt.2, and IS/AWS code:ER4112 Medium coated.
SOLID MIG / MAG WELDING FILLER WIRE, CLASS VI, SIZE 1.2 MM, SPECIFICATION NO.-IRS: M-46/13, GRADE ER 308L AS PER AWS: A 5.9-10
Solid MIG/MAG Welding Filler wire - 1.2mm dia., Class - I to IRS: M-46/2020, Grade as per IS: 6419-1996 (Reaffired 2021). Make Brand: FAIRWELD
Arc Welding Electrode confirming to specification no. AWS A5.5 E 12018-M Mod or E12018-G. Size of the electrode 4 mm x 450 mm length.
Digging Plate Welding Component (Chain) Part No. 23067173 with minimum stipulated performance of 200 Kms Make CRCC or Own Make As per Sample or its equivalent
Manual Metal ARC welding electrode class N-1 DRG NO IRS ; M-28-02 AMMNDT NO 1 OF MARCH 2003 & AMMND NO 2 OF SEPT 2003.
Removal of leakage of oil in the power Transformer 10 MVA No-1 installed at 33/11 KV sub station Jawahar Bhawan with cold welding compound
Job of Tender :- FABRICATION OF FLOATING ROOF AND ASSOCIATED WORKS FOR CONVERSION OF CONE ROOF TANK INTO INTERNAL FLOATING ROOF TANK AT BPCL MATHURA INSTALLATION
Management Services - LumpSum Based - Request for Proposal for Venue Construction & Fabrication; Scientific Hall Branding Panels with Flex Print on Solid Plywood wall; Consumables to be provided by buyer, Facility Management Services - LumpSum Based ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ... & Fabrication ; ...
Fabrication of Trusses, Purline, M.S. column Pipe, M.S. Plate M.S. clit for Durashine shed on superstructure of Regulator gates of Rapti main canal at 126.5 KM including all cost of material and, labour of Saryu Nahar Khand Bansi , distt. Siddar
Welding Screen, Welding Glass Black, Welding Glass White, Regulator Oxygen, Regulator Acetylene, Gas Welding Nozzle 3 comma 4 comma 6 comma 20, Blow Pipe Set, Gas Welding Pipe for Oxygen, Gas Welding Pipe for Acetylene, Gas Cutter
Repairing of the assembly parts by machining, cutting, small welding work ,boring, facing, drilling, thread cutting etc. to give the subject part smooth and desired finish so as to fit with main assembly of Pumps and Compressors of ATPS , Anpara
Repairing of old parts, fabrication of parts, dismantling, assembly and commissioning of High Head CW pump of Unit No. 07, 120MW, HTPS, Kasimpur, Aligarh
Repairing and Jointing of MS Tubular poles of 11/13/16 Mtr length and Fabrication of Lighting Bracket and side Clamps at Krishnashila Project.
Cutting AND Fabrication of Steel sections in different sizesAND its handling as per RESPO norms at Various Store Center Under Electy. Store Division Gonda.
Off loading the work of Fabrication and Fitment of Anti-Collision Device Tail Gate Device in 20 nos CAT777D 100Te dumpers of Dudhichua Project
Fabrication and fitment of Fuel tank locking arrangement and Strainer of the fuel tanks of Drills, Dozers, Cranes and Hydraulic shovels of Bina Project.
Fabrication, supply and installation of canopies for Motors, push button stations and MOVs for Water Block, MSQ, NU and OMS Zone at Mathura Refinery.
Fabrication and erection of damaged exhaust and air supply ventilation duct at Phase-I crushing section and various electrical substations of CHP Dudhichua Project
Repairing/fabrication of 03 nos. 30 kW, 05 nos. 22 kW, 03 nos. 7.5 kW blower motors of 20/90 Dragline at Khadia Project
Renovation Work including Misc Civil Interior and Fabrication of Table Work in Room No 315 (DP 05E) at 3rd Floor Shakti Bhawan (HQ) Lucknow
Renovation Work including Misc Civil,Interior and Fabrication of Table Work in Room No 620 (E.M.04 ) at 6th Floor Shakti Bhawan (HQ) Lucknow