Loading…
Loading…
5,971 results • Best match
ABC Type fire extinguisher
ABC Type fire extinguisher
purchase of Fire Extinguisher
Est. No. 232021 of 2024-2025 Providing Semi Comprehensive AMC of Fire Hydrant and Fire Alarm System of Dy. RTO office G Plus 4 Upper Floor at Nerul, Navi Mumbai. for 3 Years
Estimate No. 212102 of 2025-2026 Providing Semi Comprehensive annual maintenance contract of fire hydrant, Sprinkler, Fire Alarm and PA System installed in Judicial Acadamy Buliding at Uttan Tal. Miraroad Dist. Thane Maharashtra
Design, Supply, Installation, Testing and Commissioning of Fire Alarm System and Fire Hydrant system by using existing sea water ring system at Container Terminal Shift Office and Canteen of JNPT, Sheva, Navi Mumbai
Providing Fire Alarm Detection and Fire Fighting system for 100 Beded womens Hospital 1st floor District Hospital At Nandurbar Tal and Dist. Nandurbar.
Est.No.112120 of 2025-26 Prov. Ren. to E.I, street light, water pump,Heat pump, supply arrangement, 30 KWP ON grid Solar,Fire fighting system at Girls Hostel of Rajarshi Chhatrapati Shahu Maharaj Govt.Medical College near Civil Surgen Baglow Kolhapur
AS PER TENDER
Estimate No 323/NGP/2024 25 Providing E.I, EPABx System, LAN andNetworking, Area Lighting, Submersible Pumps, CCTV System, Heat Pump System, Fire Fighting System and Lift to Newly Constructed Lecturers Quarter Building G5 Type IV in the Premises
Estimate no 111080 of 2024.2025 Providing Transformer and DG Set System Internal Electrification System LV System Lift System Fire Fighting System Water Pump System HVAC System and CCTV System for the proposed Offices Auditorium Gymnasium Hall for St
Estimate No. 121073 of 2024.2025 Providing EI Street light Lift Pump System for Type V and VI Judges Quarters And Fire Fighting System Lift and EI 3rd 4th Floor at Type IV Judges Quartres Tal. Shirur Dist. Pune
Est. No. KESD/OW/260/2023-24 Providing Electrical Installation, Split AC units, Street light poles with ftgs, Transformer S.S. and Fire Fighting System at newly constructed 7 nos Residential Qtrs For Hon Judges at Sindhudurgnagari, Dist- Sindhudurg
Estimate No. 122293 of 2024.2025 Providing Internal Electrification Fire Fighting System Water Pump System LAN Telephone and CCTV System Street Light System Solar PV Generation System for newly proposed Building of Otur Police Station at Otur Tal. Ju
Estimate No. 861/NGP/2023 24 Providing E.I, Area Lighting, Submersible Pumps, Heat Pump System, Fire Fighting System, Lift and Supply Arrangement to Newly Constructed RMO Boys Hostel (G 4) in the Premises of GACH Nagpur, Dist - Nagpur.
Estimate No. 684/NGP/202223 Supply, Installation, Testing and Commissioning of Electrical System, HVAC Work, Fire Fighting System, Lift Work and CCTV Work for additiondal 7th floor of Administrative Building G 6 at Indira Gandhi Medical College, Nagp
Appointment of Project Management Consultant for Providing repairs to lifts (Gplus23 floor) 4 nos lifts, meter board wiring, water pumps and fire fighting system to MMRDA RandR colony, Building no.P1, P2, P3, P4 located at Balkum, Thane (West).
Estimate No.122030 of 2022.23 Providing Internal and external electrical installation fire fighting system DG Lift Air conditioning system CCTV system to Proposed New court building in court premises at Rajgurunagar Khed Dist Pune Total 4 Sub Work
Estimate No. 1908/NGP/2025 26Providing E.I, Submersible Pump, CCTV System, Fire Fighting System and Facade and Decorative Lighting to Newly Constructed eLibrary and Conference Hall showing Life Story of Dr.Babasaheb Ambedkar at T Point in Mahadula un
Estimate No. 2042/NGP/2026 27 Providing E.I, CCTV System, Submersible Pump, Fire Fighting System, Facade Lighting and On Grid Solar System to Newly Constructed Samaj Bhavan at Shriramchandra Swami Devsthan Ayodya Nagar, Sakkardara Nagpur, Tah. and D
Custom Bid for Services - One Time Comprehensive Fire Audit of Running Rooms Crew Booking Lobbies over Pune division by Government Approved Licenced Agency for a period of Three Months Similar Category Operation And Maintenance Of Fire Fighting System...
ADDRESSABLE OPTICAL TYPE SMOKE DETECTOR WITHOUT BASE, MAKE: APOLLO, MODEL: XP-95, PART NO: 55000-600
REPAIR/ REPLACEMENT OF OLD RUSTED WATER SUPPLY PIPE LINE, FOOT VALVE, GATE VALVE, NRV, SLUICE VALVE AT INS SHIKRA, NT POOL, PASTA LINE, BOAT POOL AND REPAIR/ MAINT OF FIRE ALARM PANELS, HOSE REELS, NOZZLES, SMOKE DETECTORS AND CLEANING OF FIRE FIGHTI
Advance Fire Monitor (Fire Sprinkler Systems)
Advance Fire Monitor (Fire Sprinkler Systems)
Advance Fire Monitor (Fire Sprinkler Systems)
Advance Fire Monitor (Fire Sprinkler Systems)
Advance Fire Monitor (Fire Sprinkler Systems)
FM 200 System (Q3), Fire Fighting System (Q3)
Refilling of Fire Extinguisher Cylinders - Water Based Fire Extinguisher; 9 Litres; 4 Years to 5 Years, Refilling of Fire Extinguisher Cylinders - Carbon Dioxide Fire Extinguisher; 7 Kg; 4 Years to 5 Years, Refilling of Fire Extinguisher Cylinders - ... Powder Fire Extinguisher ; ... of Fire Extinguisher Cylinders ... Powder Fire Extinguisher ; ...
Refilling of Fire Extinguisher Cylinders - Foam Based Fire Extinguisher; 9 Litres; 2 Years to 3 Years, Refilling of Fire Extinguisher Cylinders - Carbon Dioxide Fire Extinguisher; 5 Kg; 2 Years to 3 Years, Refilling of Fire Extinguisher Cylinders - ... Powder Fire Extinguisher ; ... of Fire Extinguisher Cylinders ... Type Fire Extinguisher ; ...
Refilling of Fire Extinguisher Cylinders - Dry Powder Fire Extinguisher; 5 Litres; 2 Years to 3 Years, Refilling of Fire Extinguisher Cylinders - Dry Powder Fire Extinguisher; 2 Litres; 2 Years to 3 Years, Refilling of Fire Extinguisher Cylinders - ... Powder Fire Extinguisher ; ... of Fire Extinguisher Cylinders ... Powder Fire Extinguisher ; ...
Refilling of Fire Extinguisher Cylinders - Carbon Dioxide Fire Extinguisher; 5 Litres; 2 Years to 3 Years, Refilling of Fire Extinguisher Cylinders - Dry Powder Fire Extinguisher; 6 Litres; 2 Years to 3 Years, Refilling of Fire Extinguisher Cylinders ... Based Fire Extinguisher ; ... of Fire Extinguisher Cylinders ... Dioxide Fire Extinguisher ; ...
1.FIRE FIGHTING ITEMS-CNAL-16101, 2.FIRE FIGHTING ITEMS-CNAL-16401, 3.FIRE FIGHTING ITEMS-CNAL-16403, 4.FIRE FIGHTING ITEMS-CNAL-16405, 5.FIRE FIGHTING ITEMS-CNAL-16501, 6.FIRE FIGHTING ITEMS-CNAL-16505, 7.FIRE FIGHTING ITEMS-CNAL-16509, 8.FIRE FIGHTING...
Custom Bid for Services - Conclusion of 03 years of RRA for Repairs of Twin Trolley sets Similar Category AMC/CMC of Fire Extinguishers Repair and Overhauling Service Refilling of Fire Extinguisher Cylinders
Refilling of Fire Extinguisher Cylinders - Carbon Dioxide Fire Extinguisher; 2 Kg; More than 5 Years, Refilling of Fire Extinguisher Cylinders - Carbon Dioxide Fire Extinguisher; 3 Kg; More than 5 Years, Refilling of Fire Extinguisher Cylinders - ... Dioxide Fire Extinguisher ; ... of Fire Extinguisher Cylinders ... Dioxide Fire Extinguisher ; ... of Fire Extinguisher Cylinders ... Dioxide Fire Extinguisher ; ... of Fire Extinguisher Cylinders ... Dioxide Fire Extinguisher ; ... of Fire Extinguisher Cylinders ... of Fire Extinguisher Cylinders ... of Fire Extinguisher Cylinders ... of Fire Extinguisher Cylinders ...
Refilling of Fire Extinguisher Cylinders - Carbon Dioxide Fire Extinguisher; 23; More than 5 Years
Refilling of Fire Extinguisher Cylinders - Carbon Dioxide Fire Extinguisher; 4 Kg; Within 1 Year
Refilling of Fire Extinguisher Cylinders - Dry Powder Fire Extinguisher; 9 Kg; Within 1 Year
Refilling of Fire Extinguisher Cylinders - Water Based Fire Extinguisher; 5 Litres; Within 1 Year
Refilling of Fire Extinguisher Cylinders - Water Based Fire Extinguisher; 9 Litres; Within 1 Year
Refilling of Fire Extinguisher Cylinders - Water Based Fire Extinguisher; 9 Litres; 4 Years to 5 Years, Refilling of Fire Extinguisher Cylinders - Dry Powder Fire Extinguisher; 6 Kg; 4 Years to 5 Years, Refilling of Fire Extinguisher Cylinders - ... Dioxide Fire Extinguisher ; ...
Refilling of Fire Extinguisher Cylinders - Dry Powder Fire Extinguisher; 2 Kg; 1 Year to 2 Years, Refilling of Fire Extinguisher Cylinders - Dry Powder Fire Extinguisher; 6 Kg; 1 Year to 2 Years, Refilling of Fire Extinguisher Cylinders - Dry Powder ... Powder Fire Extinguisher ; ...
Refilling of Fire Extinguisher Cylinders - Dry Powder Fire Extinguisher; 5 Kg; 1 Year to 2 Years, Refilling of Fire Extinguisher Cylinders - Dry Powder Fire Extinguisher; 6 Kg; 1 Year to 2 Years, Refilling of Fire Extinguisher Cylinders - Dry Powder ... Powder Fire Extinguisher ; ...
ABC Type Fire Extinguisher 4.0 Kg., CO2 Type Fire Extinguisher 4.5 Kg., Fire Safety Hand Gloves, Fireman Axe, Fire Shovel, B.A. Set With Spare Cylinder With Fire Engulfment Test, Fire Beater, Fire Hook, Fireman Safety Helmets, Portable Fire Pump 275 LPM BOQ Title BOQ TITLE1
REPAIR OF FIRE TENDER TFF-09DY, BA NO 07P-020451Y (TRUCK FIRE FIGHTING LARGE OF ASHOK LEYLAND) FOR FIRE DEPT AT NAVAL DOCKYARD MUMBAI
(a)Maint. of E and M equipments at HPCS and NDC Section at Agrimet building at IMD, Shivajinagar, Pune. (b) MOEI and fans, RMO pump sets, Lifts, Substation at IMD Main Campus and Ramdurg house, Shivajinagar, Pune(Archival Center) (c) MOEI and fans ... Automatic Fire Alarm system, ... Addressabe Fire alarm system ... Based Fire fighting system for ...