Loading…
Loading…
28,805 results • Best match
Flood Relief Work 2020-21 Kondotty Block Panchayath Mylambra Chalil Mylambra Road in Muthuvallur Grama Panchayath
Repair work of Damaged roads under Flood Relief Funds Scheme Pkg No CBD/FDR/PR/04
Repair work of Damaged roads under Flood Relief Funds Scheme Pkg No CHHABRA/FDR/PR/01
Supply and Delivery of Pvc Pipes ,Delivery Hose ,Electric cables and accessaries to Flood Relief works.
Flood Relief Work 2020-21 Kondotty Block Panchayath Muthuparamb Kizhakkupuram Moossakkutty Haji road inMuthuvallur Grama Panchayath
Repair work of Damaged roads under Flood Relief Funds Scheme Pkg No CBD/FDR/PR/01
FLOOD RELIEF FUND FOR 2020-21 PALA MUNICIPALITY KANNAMATTOM OORASSALA ROAD CONCRETING IN Ward No 23 .
(RETENDER)Haripad municipality Natural calamity flood relief works- 2019-20- Renovationwork of road from kuttathethu saparyajunction.
Repair work of Damaged roads under Flood Relief Funds Scheme Pkg No CHHABRA/FDR/PR/02
Repair work of Damaged roads under Flood Relief Funds Scheme Pkg No CHHABRA/FDR/PR/03
Budget Work 2019-20 Chengannur Flood Relief Re-construction of various roads in Puliyoor Grama Panchayath
Repair work of Damaged roads under Flood Relief Funds Scheme Pkg No CBD/FDR/PR/02
Repair work of Damaged roads under Flood Relief Funds Scheme Pkg No CBD/FDR/PR/06
FLOOD RELIEF SCHEME 2019 20 PANAMARAM BLOCK PANCHAYATH VARADOOR PONNANKKARA ROAD RE TARRING IN KANIYAMBATTA GP
Budget Work 2019-20 - Chengannur Flood Relief- Re-construction of various roads in Thiruvanvandoor Grama Panchayath
Repair work of Damaged roads under Flood Relief Funds Scheme Pkg No CBD/FDR/PR/05
Flood Relief Work 2020 21 Kondotty Block Panchayath Cherumuttam Cholayil puraya Road in Pulikkal Grama Panchayath
Engagging Earth moving machinery JCB on hire basis for Flood Relief Work near in Ponneri Municipality
Restoration of Flood damage Boshabil to Balagaon Road under SDRF for the year 2020-21. (Ch. From 1300.00m to 1720.00m)
Emergency flood damage protection of Dalugaon Baraitali Embankment at Howrer Bazar under the jurisdiction of W.R Sub- Division No-II , Kailashahar during the year 2019 20 SH Providing PVC wire crates 2nd Call
Flood control works
FLOOD CONTROL WORKS
Flood control works
Restoration of damaged Sundarban Embankment with anti erosion for a length of 75 metre along right bank of river Kantakhali near Adhikaripara at Mouza Laskarnagar in Block Hasnabad Dist. North 24 Paraganas
Anti-erosion work for a length of 930.00m in connection with the restoration of the breached embankment on the left bank of river Fulahar Phase-II at village Surjapur Debipur, PS-Ratua
Anti-erosion and protection work on Sundarban Embankment along the right bank of River Gomor at Mouza - Pakhirala, (Near Zilla Parishad Bunglow) for a length of 450 M. G.P. Gosaba, Block- Gosaba
Scoured Bank Protection and Restoration to Serapur-Sahapada TRE and Sahupada OAE on Brahmani right embankment from Brahmabarada Bridge to Rudrapur Bridge under NABARD Assistance RIDF-XXV.
Gurufella River Training Project at South Khagrabari under RIDF-XXXI
AMLAIGURI RIVER TRAINING PROJECT AT VILLAGE AMGURI UNDER RIDF - XXX
bank protection work
bank protection work
bank protection work
Bank protection work
bank protection work
bank protection work
Bank Protection work
Bank protection work
bank protection work
Anti Erosion work to the Right bank of River Padma, near Gate no 15 in between picket no. 297 to 316 of border fencing of AOR of BOP Renu for a total length of 57 m in Block PS Lalgola, Dist Murshidabad under Ganga Anti Erosion Division noI
FLOOD PROTECTION WORK OF AGARCHATTI IN BLOCK-GAIRSAIN, DISTT- CHAMOLI, UTTARAKHAND
GENERAL Budget Work 2019 20 Chengannur Flood Relief Reconstruction of various roads in Chengannur LAC In Chennithala Grama Panchayath
Anti-erosion work for the protection of village Pajarana located on the right bank of Sahastra Rao river in District Saharanpur
Supply of Flood fighting materials at different sites points within the jurisdiction of Ganga Anti Erosion Sub Division No V Murshidabad
Supply of Flood fighting materials at different sites points within the jurisdiction of Ganga Anti Erosion Sub Division No VI Murshidabad
ANTI EROSION WORK FOR PROTECTION OF LAGHUDAL PUMP CANAL NEAR VILLAGE-KATHINAI ON RIGHT BANK OF RIVER GANGA IN DISTT.- MIRZAPUR
Supply of Flood fighting materials at different sites points within the jurisdiction of Ganga Anti Erosion Sub Division No VII Murshidabad
Anti-erosion work to the right bank Fulahar for a length of 600 m at village Bankutola Block Ratua l Malda.
ANTI EROSION WORK NEAR VILLAGE BHUNDI AT KM 8.520 OF USHAIT TATBUND ON LEFT BANK OF RIVER GANGA IN DISTT. BUDAUN.
ANTI EROSION WORK NEAR VILLAGE PATHRAMAI AT KM 13.770 OF USHAIT TATBUND ON LEFT BANK OF RIVER GANGA IN DISTT. BUDAUN.
TCMC - Engaging JCB cum Loader and Tipper Lorry on Flood Affected Area in Ward No.09,13,14,15,16,17,18,19,20,21,24,26,27 and 28 (Zone II)