Loading…
Loading…
8,477 results • Best match
TAPE ANTI EROSION 5 INCH
TAPE OF ANTI EROSION 5 INCH
TAPE OF ANTI EROSION 5 INCH (Q3)
PROCUREMENT OF ANTI EROSION PLATES OF MILL OF UNIT-#7/DPPS
Temporary Measure for Anti-erosion work to the Right bank of River Padma at AOR of BOP Atrosia and Renu in Block & P.S. Lalgola, Distt. Murshidabad. Subwork/Packages: Temporary measure for Anti-erosion work to the Right bank of River Padma at AOR of BOP Atrosia and Renu in Block & P.S. Lalgola, Dist- Murshidabad
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
FLOOD DAMAGE
Interim measures for anti erosion work on the right bank of river ganga downstream of Farakka barrage between Ch 5700 m Ch 6000 300 mtrs (Reach 02) near Nayansukh under Feeder Canal Division, Farakka Barrage Project.
Interim measures for anti erosion work on the right bank of river ganga downstream of Farakka barrage between Ch 5700 m - Ch 6000 (300 mtrs) (Reach 02) near Nayansukh under Feeder Canal Division, Farakka Barrage Project
Interim measures for anti-erosion work on the right bank of river ganga downstream of Farakka barrage between Ch 6000 m Ch 6300 300 mtrs (Reach 03) near Nayansukh under Feeder Canal Division, Farakka Barrage Project
Interim measures for anti erosion work on the right bank of river ganga downstream of Farakka barrage between Ch 5400 m to Ch 5700 (300 mtrs.) (Reach 01) near Nayansukh under Feeder Canal Division, Farakka Barrage Project
Interim measures for anti erosion work on the right bank of river ganga downstream of Farakka barrage between Ch 6000 m to Ch 6300 (300 mtrs) (Reach 03) near Nayansukh under Feeder Canal Division, Farakka Barrage Project
Interim measures for anti erosion work on the right bank of river ganga downstream of Farakka barrage between Ch 6600 m to Ch 6800 (200 mtrs) (Reach 05) near Brhamngram under Feeder Canal Division, Farakka Barrage Project
Interim measures for anti erosion work on the right bank of river ganga downstream of Farakka barrage between Ch 6300 m Ch 6600 300 mtrs (Reach 04) near Nayansukh Brhamngram under Feeder Canal Division, Farakka Barrage Project
Interim measures for anti erosion work on the right bank of river ganga downstream of Farakka barrage between Ch 6300 m to Ch 6600 (300 mtrs) (Reach 04) near Nayansukh Brhamngram under Feeder Canal Division, Farakka Barrage Project
River Training Work 60 cum
River Training Work (60 cum)
Anti erosion work on Hooghly left embankment at Mouza Sultanpur in Block Diamond Harbour-I, P.S. Diamond Harbour, District - South 24 Parganas
Anti Erosion work of Bathing Ghat to the right bank of river Bhagirathi for a length of 40m at Chaltabari, Mouza- Kamrapara in PS Block Sagardighi under Ganga Anti Erosion Division NoI
Anti Erosion work of Bathing Ghat to the LB of river Bhagirathi for a length of 40m at Dhanpatnagar, Mouza- Dhanpatnagar, Block-Raghunathganj-II, Dist-Murshidabad under Ganga Anti Erosion Division NoI, Raghunathganj, Murshidabad
River Training Works at Kodalbasti Range under JPWL Division.
Flood protection and Mitigation work including anti erosion work for reducing vulnerability of people due to damage of embankment occurred during Purnima Kotal at m/Kachukhali (Gopal Sardar to Dipak Sardars house) facing r/b of r/Bidya, Gosaba.
Flood protection and Mitigation work including Anti Erosion for reducing vulnerability of people due to damage of embankment occurred during Purnima Kotal at mouza Bali (5 No.) facing left bank of river Bidya in Block and P.S.- Gosaba, South 24 Pgs.
Flood protection and Mitigation work including anti erosion work for reducing vulnerability of people due to damage of embankment occurred during Purnima Kotal at m/Kachukhali (Swapan Sardar to Haran Sardars house) facing r/b of r/Bidya in Gosaba
Anti Erosion work for a length of 130m to reduce the intensity of erosion on the Left Bank of River Bhagirathi at Vill-Jotkamal, Mouza-Jotkamal, Block-Raghunathganj-II PS-Raghunathganj, Ganga Anti Erosion Division NoI, Raghunathganj, MSD
Construction of Flood Relief Centre at Indrapur under Ramganga Range under 24-Parganas (South) Division.