Loading…
Loading…
5,094 results • Best match
Interlocking Tile work in Shoulder of L.B.B.Road (SH-40).KM-42 Ch.41.000 to 41.500 (Abadi of Hasanganj)
Drain and tile work by upgrading the road from Naeem house to Salman house in Ward-88, Majidnagar.
Drain and tile work by upgrading the streets around the Vivekananda P. school in Ward 43 Mau Indranagar.
CONSTRUCTION OF 42.00 MTRS C.C. INTERLOCKING TILE WORK AT SUSHILA DEVI INTER COLLAGE DIDOLI, BLOCK-JOYA, DISTT.-AMROHA.
Gram jasar sultannagar Block-Saroorpur Khurd mai intjar ki dairy se jane ke makan tak interlocking tile work
Construction of Interlocking Tile Work In Front of Gram Panchayat Khempur Block Patara Salaili From Sanker Ji Mandir
C/o road interlocking tile work from mamuddin home ot bely chauraha in mahaulla nobise,village mehandipur,YEA.
Bahadupur mai jai karan valmiki ke makan se neeraj nagar ke makan tak nail or Interlocking tile work
Providing and laying/Relaying interlocking tiles work and brick drain in village- Bhatta YEA WC-06
MOH KAYASTHWADA ME PRATHMIC VIDHYALAY NO 1 ME KAMRO KE FARSH PLASTER MARAMMAT FLOOR TILES RANGAI PUTAI OR CLASS ROOM ME PROJECTOR BENCH INVERTER BATTERY LAGANE KA KARIYE
Vinyl Flooring 1MM, Linolium Sheet 2mm, Adhesive SR 998, SR Adhesive 505, Cutting Blade
Synthetic Badminton Court Flooring, Subfloor Preparation, Badminton Movable Pole, Floor Marking, Installation
Tiling and other works in classrooms at Kasturba Gandhi Residential Girls School, Bhainsrau.
Tiling work in classrooms at Kasturba Gandhi Residential Girls School, Khalasi Line Saharanpur.
Tiling and other works in classrooms at Kasturba Gandhi Residential Girls School, Mohada.
Tiling work in classrooms at Kasturba Gandhi Residential Girls School, Nakur and Mahngi
Providing and laying integral cement based treatment for water proofing on the vertical surface by fixing specified stone slab 22 mm to 25 mm thick with cement slurry mixed with water proofing compound conforming to IS 2645 in recommended proportions
Work of floor and wall tiles, water fitting etc. in the toilet near Ambedkar Bhawan in Samaj Sudhar Samiti, Ward-12, Balupura Road.
M/o Building (R/o Plaster, Oil Bound, Painting, Wall Tiles and Paver Block in Community Centre Near Super MIG Sector- 93) Noida
Chain fencing, pitching resistance wall, tiles, benches, pathways, ghat, tree plantation, grass and painting work around Mahaviran pond in Sikadandarpura 03 Ward 05.
Chain fencing, pitching resistance wall, tiles, benches, pathways, ghat, tree plantation, grass and painting work around Mahaviran pond in Sikadandarpura 03 Ward 05.
FLOORING TILE WORKS, SANITARY FITTING MATERIAL, SANITARY FITTING LABOUR, ELECTRIC GEYSER, ELECTRIC GEYSER FITTING LABOUR
Consruction of Interlocking Flooring in front of Cane and General Office.
WARD 11 BELDARAN ME CHAND FURNITURE WALI GALI ME INTERLOCKING TILES WORK OR NALI NIRMAN WORK
Road Interlocking Tiles work from Angad Garden to Pramod Kumar house in Pravesh Vihar Ward 63.
Construction of Park Boundary wall Interloking Tiles work At Ward No. 03 Moh Mukarpur Khema Bijnor
Interlocking and tiles work in 4 Kamla Nehru Road to KP Compound sri Manoj Srivastava house
Tiles work in ward No 13 from HDFC Bank to Omprakash Master House Road side Patri.
Construction of drains and interlocking tiles work Kasseri lal house to Raju house in Choti Bihar
Drain and tiles work ini ward no 15 form Mahesh House to front and Last Street.
Construction of drains and interlocking tiles work in Pashchimi bhitora baheri road se shiv mandir tak
Construction of Interlocking Tiles work at village kheda dharampura Mahesh Sharma house to Chhatrapal Sharma house.
Interlocking tiles work in front of Ashoka Buddha Vihar in Ward 53 Shastri Nagar Sector 3
GREATER PALLAVPURAM ME MEHKAR CHAUHAN KE MAKAN SE PARK KE KONE TAK INTER LOCKING TILES WORK
Interlocking tiles work on damaged road in front of Garhi village on Ward-16 Vardan Road.
Construction of interlocking tiles work from Hanuman mandir marg (Via Ramlal khet to Chatar Singh house.
CC Tiles work on nagar nigam property opposite water tank on Raisna Main Road ward 17
Interlocking tiles work on side track from KCC-04 to KCC-228 in Ward-91, Kavinagar.
CONSTRUCTION OF TEEN SHED (2.00 N.) AND INTERLOCKING TILES WORK AT SHAMSAN ESTHAL IN VILLAGE SAMASPUR.
CONSTRUCTION OF TEEN SHED (2.00 N.) AND INTERLOCKING TILES WORK AT SHAMSAN ESTHAL IN VILLAGE JIKHINGAON.
Construction of Teen Sheed (2.00 N.) And Interlocking Tiles Work at Shamshan Esthal In Village Chhatikara.
CONSTRUCTION OF SHANTI ESTHAL,SITING BENCHES AND INTERLOCKING TILES WORK AT SHAMSAN ESTHAL IN VILLAGE TOSH.
Interlocking tiles work from KL-01 to KL-40 in Ward 91, Kavi Nagar L0-Block.
1-Construction of Draini and Tiles work in Mo Khakrowan from Chatri House to Sunil House.
Construction of drains and interlocking tiles work at Shafik shop to Ramchandra house in Yakoobpur Nawabganj.
Providing and laying of Interlocking tiles work in village Imaliyaka Shamshan Ghat approach road, Greater Noida.
Construction of drains and interlocking tiles work in Ward no. 4, Shani mandir se RPN tak
Providing and Fixing Interlocking tiles work in Village- Mehandipur including construction of drain YEA WC-06
Construction of drains and interlocking tiles work in Gram chitoli road se rajkiya balika vidhalya tak
Interlocking tiles work on Chhath Puja Marg Panki Canal under Zone 06 Ward 23 Housing Development.