Loading…
Loading…
2,289 results • Best match
Renovation and Repairing work of total 89 nos. unauthorized flats with structural repairing, plastering, flooring, white wash etc. at RHE Baburam Ghosh Road.
Proposed work of Flooring work (Rest Room) ground floor of MP Building of Ramnagar College, at mouza-Depal, PS-Ramnagar, Dist-Purba Medinipur
Repair of partition wall false ceiling and flooring at different place of Block A at New Secretariat Building during the year 2024 25
Supply, delivery, fitting fixing of flooring sheets, customized curtains etc with allied works at west side room beside 1st floor toilets under EWS
Repair work of Pathway, Inspection pit, flooring and pipeline at Gr. floor of, 32, Belvedere road, kolkata -27 during the year 2025-2026.
REPAIR TO SEWAGE LINE FLOORING PLASTERING PLINTH PROTECTION SANITARY FITTINGS AND OTHER RELATED WORKS AT DGQA COMPLEX AND COMMISSARIATE ROAD UNDER GEC KOLKATA
REPAIRS TO SEWAGE LINE, FLOORING, PLASTERING, PLINTH PROTECTION, SANITARY FITTINGS AND OTHER RELATED WORKS AT DGQA AND COMMISSARIATE ROAD UNDER GE(C) KOLKATA.
REPAIR TO ROOF FLOORING JOINERY PLINTH PROTECTION AND OTHER MISC BR WORKS IN JCOS OR MD ACCN AT BMC UNDER GE CENTRAL KOLKATA
Construction of Boundary wall with Safe Flooring 268 nos ICDS With install Plastic Cage with waste bin under Boinchipota GP within Singur Block
Construction of Cow Catcher,Drain,Wall And Flooring with Chequered tilesat Kandi Panchayet Samity premises ,mouza-Dohalia , Jl-85 , Under Kandi Panchayat Samity
All as per BOQ
Emergent work of flooring, wooden table etc at different rooms of Nabanna Building Mandirtala in the district of Howrah during the year 2024 25
Painting, flooring and PVC door (dismantlled portion only) fitting works of Jagadish Abas, Raman Abas, Rabindra Abas and Vidyasagar Abas under B.C.K.V., Mohanpur, Nadia
TREADMILLS (Q3), Exercise Bike (Q3), Elliptical Cross Trainer (Q3), Flooring for Gym (Q4), Multi station gym (Q3), Dumbbell Rack (Q3), Rubberized Weight Dumbbells (Q3)
Repairing and Painting of the class room no1 ground floor,32,33,34,35,36,37,38 corridor second floor except Flooring at Academic building ,Economics Campus , University of Calcutta.
c) Construction of VDF flooring with colour hardener and lacker at Naval aircraft museum site, action area - IIID in new town, kolkata(part-2)
Repair and Renovation work at Khanjepur HW site with Pathway ,Door ,Windows ,Flooring, Plastering ,Painting, other allied works under Nadia Arsenic Division-II,P.H.E.Dte.
Renovation of RWS Office Building with Inside flooring, partition wall etc at Nababhat P.H.E Complex within RWS Sub-Division under Burdwan Division, PHE Dte.
PAINTING, FLOORING, AND ALLIED WORKS OF COMMUNITY HALL IN WARD NO 20 UNDER NORTH DUM DUM MUNICIPALITY SCHEME ID-APAS/01/110/208/0001
Renovation of Gram Panchayat Office Building by Flooring and other work under Salbari II G P within Tufanganj II Panchayat Samity Activity code 67873105
BEAUTIFICATION OF BAJAKADAMTALA GHAT RELATED TO UPCOMING GANGA-ARATI RITUALS BY SUPPLYING FITTING FIXING DHOLPUR STONE, GRANITE STONE FLOORING AND OTHER ANCILLARY CIVIL WORKS.
Construction/Maintenance/ Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc at G.P. Office, ACTIVITY CODE NO.- 112384617 (25-26)
Replacement and Repairing work for Plastering, flooring, Colour Washing, Distempering, Wood Work, S and P work in the diff. Qtrs. at RHE Pratapbagan Bankura.
Construction for the Sanitary Plumbing AND Flooring Works of Toilet Block at Battala Barowadi jamin Mouza- Narayanpur, under Haringhata Panchayat Samity ( Activity Code-64905264 ).
Flooring works of Auditorium at Utsarga Manch under Bolpur Municipality.(Rate shall be quoted as per drawing and design ) (including all Taxes And GST)
Installation of false ceiling, flooring and other allied works at OCs chamber of Alipore Police station, Alipore, kolkata -27 during the year 2025-2026.
Repairing, Renovation, Painting inside and outside Flooring and allied Civil works including Sanitary Plumbing and Electrification work at Directorate Meen Bhavan Salt Lake Kolkata
Emergent Anti Skid flooring work at the front side steps of DM Bunglow in the district of Paschim Medinipur during the year 2026 2027
Construction of toilet, PVC vinyl flooring work and renovation of Siliguri ZCC in the premises of Power House Campus, 2nd Mile, Sevoke Road, Siliguri
REPAIR / REPLACEMENT OF DOOR / WINDOW INCL, JOINERY, SANITARY FITTING, TILING, PERIODICAL WORK AND MISC WORK UNDER MAP PH-II, KP QTRS CERTAIN OTM AT 225 COY ASC HASTINGS AREA AND REPAIR TO BOUNDARY COMPOUND WALL, FENCING, PATH, DRAIN AND CONNECTE
All as per BOQ
Construction of Anti_Chamber _ attached toilets of special Secretary Additional Director Joint Secretary and other Senior Officers at 1st 2nd and 4th floor in New Khadya Bhawan Building and paver Block and tiles work in compound road at 11A Mirza
Cleaning of compound , trimming of trees at Foreshore Road and painting of road side grill near Bal Gangadhar Tilak Park, tiles work , supplying, printing and fixing of flex and rectro 3m letter printing work and cleaning of gateway at
Construction for the Sanitary Plumbing AND Flooring Works of Toilet Block at Block Land AND Land Reforms Office, under Haringhata Panchayat Samity ( Activity Code-64905313 ).
Reparing of Teghari ICDS room, Safe Flooring and Fencing at Bhairabdanri Uttar Para, near water supply center.JL No-112, Dag no-356, AWC - 116/02.
Painting, flooring and other miscellaneous work at 3 rd. Year Studio of Arch. Department (1 st. Floor of APCR Bhavan) of IIEST, Shibpur, Howrah - 711103
Construction of 110 Sq.ft Market Shop with vertified Tiles flooring and Shutter Gate entitled SGP-Shop G-5 in front of Sovanagar GP office-40246703
Construction of 110 Sq.ft Market Shop with vertified Tiles flooring and Shutter Gate entitled SGP-Shop G-1 in front of Sovanagar GP office-40246698
Construction of 110 Sq.ft Market Shop with vertified Tiles flooring and Shutter Gate entitled SGP-Shop G-4 in front of Sovanagar GP office-40246700
REPAIRING OF OLD ESTABLISHMENT ROOM, CONDEMN ROOM AND OTHERS ADJACENT TO WORKSHOP WITH REPLACEMENT OF FALSE CEILING , ASBESTOS ROOF, FLOORING ETC. INSIDE ROAD ROLLER DEPARTMENT.
Repairing of damaged wooden flooring at Superintendents Quarter, Darjeeling District Correctional Home under PWD., Darjeeling Sub-Division of Darjeeling Division during the year 2023-2024
Construction of 110 Sq.ft Market Shop with vertified Tiles flooring and Shutter Gate entitled SGP-Shop G-3 in front of Sovanagar GP office-40246692
Thorough renovation including painting and flooring work of the rooms and corridor under the open Gallery on the back side of Alipore campus building, C.U.
Re-orientation of boundary wall, drain and some ancillary works like flooring, Mandirtala during the year colouring etc. around Nabanna and Nabanna Sabhaghar 2023-24.
Construction of wall ,false ceiling, flooring , aluminum door window with necessary finishing work of auditorium at 2nd floor of Borotajpur high school in Panchghora GP
Construction Mumpty Roof, Stair Case and Flooring of Second Floor of Jnanda Sundari Rural Library at Rath Khola, Siliguri, Dist. Darjeeling, Ward No. 22 (S.M.C.).
Construction of 110 Sq.ft Market Shop with vertified Tiles flooring and Shutter Gate entitled SGP-Shop G-2 in front of Sovanagar GP office-40246696
Provision of False Ceiling, Flooring and necessary customized furnitures within proposed New Office premises of A.P.E.DA, at 4th Floor of Mayukh Bhavan, Bidhannagar Kolkata-91
Wooden flooring, new door openings, false ceiling work, erection of new chamber and allied works in room no. 401, 617, 619, 620 Khadyashree Bhawan Kolkata.
Repairing of Toilet for 2no ward SSK, repairing of toilet and flooring work of 2 no ward office, in ward no-02, under Kalyani Municipality.