Loading…
Loading…
156 live84 closing this weekmost from Ntpc Limited and TELANGANA POWER GENERATION CORPORATION LIMITED
156 results • Best match
Handling and Transport on Lumpsum Basis - Job Contract for transportation of Fly ash from Ash Silos of NTPC Singrauli to abandoned pit of Gorbi Mines of NCL-Reserved for only SC/ST MSE Bidders
Custom Bid for Services - DESIGN ENGINEERING SUPPLY ERECTION COMMISIONING TESTING AND TRAIL OPERATION OF RACK AND PINION ELEVATORS AT HCSD AND FLY ASH SILO AREA OF AHP MUNPL Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
PROCUREMENT OF VARIOUS TYPES OF BOLTS, NUTS AND WASHER FOR ASH HANDLING PLANTS OF UNIT-7 AND UNIT-8 OF THE DURGAPUR PROJECTS LIMITED
Service Contract to carry out the compliance audit for ash disposal in FY 2025-26 for PP-II (74 MW),PP-III (2x250MW) plant of NSPCL-Bhilai by CPCB approved Auditors
TENDER PRAPOSAL FOR P/S OF 40 HP IP CONN. TO M/S. SHASHANK FLY ASH BRICKS PROP.SMT. ABHILASHA RATHORE S/O SHRI HEMANT KUMAR RATHORE AT VILL.- KUTRA U/N JANJGIR D/C P.R. No. 10071981
Handling and Transport on Lumpsum Basis - Contract for Excavation, loading & transportation of Pond Ash/fly ash from NTPC LARA to unloading at Low lying/Stone mine (abandoned stone quarry/mine) located in the range of 0- 100 KM
Handling and Transport on Lumpsum Basis - Handling & Transport Service, Contract for Excavation, loading & transportation of Pond Ash/fly ash from NTPC LARA to unloading at Low lying/Stone mine (abandoned stone quarry/mine) located in the range of 2..
Procurement of Seven nos. of Industrial Television for SPS system, Ash Handling plant, MaxDNA system, CHP control room and Conference hall of CHP service building at 2X600MW and 2X660MW, SSTPP, Dongalia.
Custom Bid for Services - 200154028 - Replacement of MS Pipe by Cast Basalt for Ash Handling System Pipelines for Stage-I, Stage-II, and Stage-III from Pump House to all Three Ash Dyke (Kendua, Nishindra and Malancha) Including all Ash Slurry Disposa.. Similar Category Operation and Maintenance Power House/Power Plant
Handling and Transport on Lumpsum Basis - Contract for Excavation loading and transportation of Pond Ash from NTPC Mouda on Metric Ton basis and unloading at Stone mine located at Khasra located at Village Haladgaon
Procurement of different type of spares for water pumps ( Beacon Weir Make) of Stage-II and III of Ash Handling system for 4x210 MW units at GGSSTP Ropar.
CC Divn Proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and Ash fly ash and bottom ash samples on Half yearly basis in KTPS VII Stage from the period from commencement of work to till date 31 03 2027
Excavation, loading and transportation of pond ash from 111 ha ash pond of STPS Sarni to WCR ROB sites at LC Nos. 225, 227, 228 and 230 for use as backfill material in RE wall approaches.
Annual work contract for Cleaning of accumulated fly ash dust around the silos of PHI PHII PHIII silo area roads open space near silos by hiring the JCB machine with diesel and operator and loading into trucks dispose off into ash sump of 4X
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 67500 MT fly ash in Unit I to V from the date of handing over of site
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 800000 MT fly ash in Unit I to V from the date of handing over of site
LTE
Supply of Combination tube and feed sump for bottom ash hoppers
Operation And Maintenance Of Other Machines And Plants - TWO YEAR ROUND THE CLOCK MAINTENANCE MECHANICAL CUM OPERATIONAL ASSISTANCE FOR ASH HANDLING PLANT INCLUDING ITS SUB SYSTEM OF UNIT 1 AND 2 OF RTPS PHASE I DVC
SUPPLY OF CI EXPANDERS REQUIRED FOR FLY ASH SYSTEM OF AHP/STAGE-I
TTPS MechII AHP Replacement and rerouting of damaged stage I Booster pump sea water pipe line and Tunnel pipe line on fire accident in Unit I Cable gallery area for resuming the Unit I II BAH ESP ECO APH hoppers ash disposal systems
TTPS MechII AHP Rubber lining of newly fabricated stage I Booster pump sea water pipe line and Tunnel pipe line on fire accident in Unit I Cable gallery area for resuming the Unit I II BAH ESP ECO APH hoppers ash disposal systems
TTPS EM1 Annual Maintenance of 220V DC buses and modules in Unit III at 13 5 mtr Floor carrying out the capacity test in 220V DC 1500AH Battery related works and cleaning of fly ash and coal dust in the cable cable trays in and around Unit III TG are
Work contract for checking, calibration, stamping and certification, legal metrology etc as per prevailing rules/norms from Weights and Measurement deptt. Govt. of MP weigh bridges at Ash silo of Ash Handling Plant, Stage-I and II, SSTPP, Dongalia.
Assistance by providing left over manpower for Complete Ash Handling Plant
Procurement of Water hose and Pipe fittings for Ash handling plant
Hiring of one no. AC Jeep (6plus1 pax capacity) category,SUV with engine capacity 1450 cc(for diesel version) with 02 air bags,ABS, for pertaining official duty of EE (BMD offsite main. and ash handling) and EE (TMD offsite) at ATPS MPPGCL Chachai
NCTPS I SE M II Circle AHP Dn Unit I O H works 2026 27 overhauling of various sizes of valves cleaning checking and rubber lining the ash water lines cleaning of Ash water tank and Ash slurry Sump etc in Ash Handling pump House
SUPPLY OF COMPLETE ASSEMBLY OF 200NB BRANCH HEADER VALVE REQUIRED FOR FLY ASH SYSTEM OF AHP/STG-I
Airlock vessels in ash handling system of CAM division KTPS-VI stage
Overhaul of Bottom ash hoppers during the annual overhaul of Unit-I & II for the year 2026-27.
300NB pneumatic operated knife gate valves in Ash Handling system, KTPS-VI stage
Supply of Taper Lock Pulley for Ash Handling Plant of Unit - 1 to 7 at WTPS.
200 NB Double Disc Valve ASSEMBLIES with pneumatic cylinder for Buffer Hoppers in Ash handling plant KTPS- V stage
Fly wheel for Transport Air Compressors Model: 1HB4BISNT (KG KHOSLA make) for Dry Ash handling plant of KTPS-V stage
INVITATION FOR EXPRESSION OF INTEREST (EOI) for lifting of pond ash on free of cost basis from ash dyke of SSCTPS, Suratgarh.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Overhauling work of Bottom Ash hopper system and DFA system of unit no 10 BTPS Obra; Power House Equipment; Buyer
Handling and Transport on Lumpsum Basis - Excavation, loading, transportation and unloading of pond ash from ash dykes of NTPC Vindhyachal to the abandoned pit of Gorbi mine of NCL
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT5243G Complete replacement Seal plate and Seal trough bowl in Bottom ash hopper and fabrication erection strengthening of BA hopper plate and structure also providing ..
Handling and Transport on Lumpsum Basis - Excavation, loading, transportation and unloading of pond ash from Shahpur ash dykes of NTPC Vindhyachal to the abandoned pit of Gorbi mine of NCL
Spares suitable for Sam Turbo make LP Water Pump Model: 6MD 80/205 and HP Water Pump Model ZM II 530/01 in Wet Ash handling system, KTPS-VI stage
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW 132G Biennial rate contract for Preventive breakdown maintenance of Allen Bradley make PLC Based systems for Fly ash system installed at 210 MW Ukai TPS unit no 5 EMD..
TGGENCO-YTPS (5X800 MW)-Stage-I-AHP-Unit-2- Carrying out mechanical maintenance of complete ash handling system including preventive, periodical, Emergency and Break down Maintenance and House keeping of Ash Handling system, Unit-2,Stage-I, YTPS for the period of 1 month from 01.10.2026 or actual date of commencement of work to 31.10.2026 or till finalization of AHP AMC , whichever is earlier during FY 2026-27.
TGGENCO-YTPS (5X800 MW)-Stage-I-AHP-Unit-1- Carrying out mechanical maintenance of complete ash handling system including preventive, periodical, Emergency and Break down Maintenance and House keeping of Ash Handling system, Unit-1,Stage-I, YTPS for the period of 1 month from 01.10.2026 or actual date of commencement of work to 31.10.2026 or till finalization of AHP AMC , whichever is earlier during FY 2026-27.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT5237G Work of removal of old damaged refractory application of the new castable refractory fire brick lining in bottom ash hopper and fabrication work in unit 3 4 and ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Work of Overhauling of Unit 3 4 Bottom Ash System Clinker Crusher Jet Pumps Feed Gates Valves etc during AOH COH Short shutdown FSD and As and ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Work of Overhauling of Unit No 3 4 fly ash coarse ash dry ash unloading System of ESP ECO APH and Stack Hopper Jet Pump during AOH COH as and ..
Annual contract for Repairing/reconditioning of components of Pumps, Drum sub Assembly of Clinker Grinder and different types and sizes of valves in Ash Handling Plant and CA circle of SSCTPS, Suratgarh