19 live10 closing this weekmost from TELANGANA POWER GENERATION CORPORATION LIMITED and Department Of Heavy Industry
19 results • Best match
Supply of clinker grinder bearings and H317 bearing sleeves for bottom ash handling system
Supply of 100NB Double disc valv spares (as per sample) for fly ash handling system
TGGENCO-KTPS-VII Stage-CAM-Enquiry for supply of Vacuum Pump Spares(model:GXL 2000) in fly ash handling system
Ceramic Fluidizing Pads for Dry Fly Ash Handling Plant of KTPS-V Stage
TGGENCO-KTPS-VII Stage-CAM-Enquiry for supply of Ash intake valve spares in fly ash system
Portland - Pozzolana Cement (Fly Ash Based) for Bulk Buying as per IS 1489 (Part 1) (Q2) (3 (3 ))
Supply of spherical roller pillow block for paddle feeder s at SILO of ash handling system
Procurement of Safety and Protection Switches and Controllers installed at Coal handling plant (CHP) and Ash Handling Plant (AHP) of STPP, Jaipur, Mancherial, Telangana
CC Divn Proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and Ash fly ash and bottom ash samples on Half yearly basis in KTPS VII Stage from the period from commencement of work to till date 31 03 2027
Supply of Combination tube and feed sump for bottom ash hoppers
Airlock vessels in ash handling system of CAM division KTPS-VI stage
300NB pneumatic operated knife gate valves in Ash Handling system, KTPS-VI stage
200 NB Double Disc Valve ASSEMBLIES with pneumatic cylinder for Buffer Hoppers in Ash handling plant KTPS- V stage
Fly wheel for Transport Air Compressors Model: 1HB4BISNT (KG KHOSLA make) for Dry Ash handling plant of KTPS-V stage
Spares suitable for Sam Turbo make LP Water Pump Model: 6MD 80/205 and HP Water Pump Model ZM II 530/01 in Wet Ash handling system, KTPS-VI stage
TGGENCO-YTPS (5X800 MW)-Stage-I-AHP-Unit-2- Carrying out mechanical maintenance of complete ash handling system including preventive, periodical, Emergency and Break down Maintenance and House keeping of Ash Handling system, Unit-2,Stage-I, YTPS for the period of 1 month from 01.10.2026 or actual date of commencement of work to 31.10.2026 or till finalization of AHP AMC , whichever is earlier during FY 2026-27.
TGGENCO-YTPS (5X800 MW)-Stage-I-AHP-Unit-1- Carrying out mechanical maintenance of complete ash handling system including preventive, periodical, Emergency and Break down Maintenance and House keeping of Ash Handling system, Unit-1,Stage-I, YTPS for the period of 1 month from 01.10.2026 or actual date of commencement of work to 31.10.2026 or till finalization of AHP AMC , whichever is earlier during FY 2026-27.
Supply of 40MM GI Pipes for SILO system laying of proposed air pipe line from stage-I vacuum pump house to Silo Utility building in Ash handling Systems of CAM Division/Stage-I/BTPS
CAM-Divn:Manual Collection and transportation of ash and debris etc beneath of ESP hoppers Silo area bottom ash area economiser arear other areas and dozing of ash heaps for cleaning the surface under ESP hoppers to ash pond/dump yard as per the direction of field engineers in CAM division as and when required during FY 2026-27