Loading…
Loading…
7,532 results • Best match
Work contract for round the clock complete operation and maintenance of Ash Handling System of Unit 1 to 4 (4 x 210 MW) of PH-I and PH-II at SGTPS, MPPGCL, Birsinghpur
Annual Rate Contract (ARC) for Maintenance of C and I System(Field portion) of main plant U1 and 2 along with their Auxiliaries, Plant Water Package and Ash handling Plant of KTPS, DVC
Procurement of 3 inch double acting equalizer valve complete assembly and its spares equivalent to existing indure make 3 inch equalizer valve for Ash Handling Plant at 2X600 MW of SSTPP, Dongalia, Khandwa
Annual Contract for Repair reconditioning of various components installed at Ash Handling Plant DM Plant PT Plant CW ACW Plant of Unit 5and6 2X660 MW CSCTPP RVUN Chhabra TN 347 2022 2023 AHPAS
Work of Overhauling, Calibration, Testing commissioning of Manometry Instruments SIEMENS make PLC control system along with Gate Valves, Electrical Drives all Control and Instrumentation system of ASH HANDLING SYSTEM including Repairing of damag
Operation and maintenance of Ash Handling System (Mechanical and Electrical) excluding the ash water recovery system at NCTPP-III for a period of one year from the date of taking over of site
Supply of Castable Refractory Fire Crete Super or equivalent along with binder for annual shutdown works in ash handling plant and boiler area unit 1 to 6, stage I to IV, SSTPS, Suratgarh
Annual work of cleaning for Turbine, Boiler, Ash handling area of Unit no 9, 10, 11, 12, 13 of 5X200 MW, BTPS and MCB, Compressor house and Sump pump house of ATPS, Obra
Up keeping of equipments and surroundings of ESPs-1&2 Area, Vacuum Pump House and weight bridge in Ash handling plant of stage-1 as and when required during the year 2024-25
SDSTPS - Providing man power for carrying out the Operation & Mechanical Maintenance works of the total Ash Handling System for a period of 12 months from 01.04.2017 to 31.03.2018 including T&P and Consumables.
Special Assistance for Operation & Maintenance of Ash Handling Plant of Unit-2 to 4 and Unit-2 to 6 Bulker Silos for a period of One Year (And extendable up to one year)
Providing & Erection and rotation of 300NB & 350 NB Ash slurry pipe line and removal of eroded Ash slurry pipe line for U-1 of Ash handling system(1 x 500 MW)-BTPS Kudathini
Custom Bid for Services - 200148892 SERVICE CONTRACT FOR ONLINE ROBOTIC CLEANING OF STG1 AND STG2 ASH WATER SUMP OF NTPC MOUDA ASH HANDLING DEPARTMENT Similar Category Operation and Maintenance Power House/Power Plant
Replacement of Ash disposal pipes of BTPS Anpara
Transportation of pond ash by mechanical means and filling to Low lyingarea/Mine filling/stone query/Area development around Sipat TPP up to100 KM (Radius) from SipatTPP with special arrangement to avoid spillage/ flying of ash.
Work contract for consultancy services for preparation, submission and approval of DPR, ESP, detailed Engineering, cost estimation etc for Transportation of Fly/Pond Ash through Rail from PSSS siding of Shri Singaji Thermal Power Project, Khandwa
Custom Bid for Services - Job contract to carry out Topographic Survey of Low lying area for determine the pond ash requirement for filling the low lying area Similar Category Operation and Maintenance Power House/Power Plant
Dismantlement of old reusable Ash Disposal Pipelines of unit-5 from underground after excavation of earth, Replacement of AD pipeline with new/old dismantled reusable pipeline and Rotation of AD pipeline for Ash Handling Plant of 210MW, Unit-6, PTPS
ARC for Operation, Maintenance of Ash Handling plant, Unit 7 and 8,MTPS (2 x 500 MW), including Removal of Technical Waste, Guarding and Maintenance of Ash Disposal Pipe lines to Ash Dykes for a period of 2(two) years
Thorough Reconditioning of 12 Nos of identified High profile Band Elements of Materials SA 387 Gr 12 15 Cr Mo for DRYCON conveyor system in Bottom ash Handling System from band element Sl No 136 to 270 during Annual Overhaul 2024 25
Thorough Reconditioning of 12 Nos of identified High profile Band Elements of Materials SA 387 Gr 12 15 Cr Mo for DRYCON conveyor system in Bottom ash Handling System from band element Sl No 1 to 135 during Annual Overhaul 2024 25
TGGENCO BTPS STAGE II CAM Division Preventive Periodical Maintenance and Regular maintenance works of Bottom Ash Hoppers and connected equipment in Unit3 and 4 Ash Handling System of Stage II BTPS during April 2026 to March 2027 during the financial year 2026-27
Custom Bid for Services - Proposal for Installation Jet Pumps & its associated accessories, Repairing of Bottom Ash Hoppers Trough Seal, Replacement of refractory cooling line and repairing of APH & ESP hoppers of Ash Handling Plant, CTPS, DVC during.. Similar Category Repair and Overhauling Service
NCTPS I SE M II AHP Dn Unit I Overhaul 2025 26 Design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for Bottom Ash Hopper work to be carried out in A pass
NCTPS I SE M II AHP Dn Unit I Overhaul 2025 26 Design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for Bottom Ash Hopper work to be carried out in B pass
Periodical cleaning of all drains in bottom ash hopper plant area boiler area and mill area in Unit _I II and III and C row drain at Power House for a period of six months from the date of commencement at NCTPS_I
Supply of Chain shackles with U links and Nuts. (One set) consist of 5 shackles, one U link (connector) with 2 Nos. HT nuts (M16), 2 Nos spring washer HT lock nuts (M16) for scrapper feeder of Bottom Ash Hopper Unit III.
TTPS MechII AHP UnitI II III Breakdown works in Ash Water Pump House Overhauling of Bottom ash water pump High pressure water pump Low pressure water pump sump pump and valves for the period from 01 04 2026 to 31 03 2027
NCTPS I SE M II AHP Dn Unit II Overhaul 2025 26 Design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for Bottom Ash Hopper work to be carried out in B pass
TGGENCO BTPS STAGE II CAM Division Reconditioning of Clinker Grinder Rollers Roller shafts Shaft sleeves fabrication of wear and guide plates and Shaft sleeve housings of Unit 3 Bottom Ash hopper Clinker Grinder Assemblies during the overhaul for the year 2025-26
NCTPS I SE M II AHP Dn Unit II Overhaul 2025 26 Design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for Bottom Ash Hopper work carried out in A pass of BAH
TTPS Mech II AHP Renewal of worn out portions of Bottom ash hopper body plate connected structural supports and BAH supporting vertical columns in North East and West side dismantling and erection of BAH overflow trough and its outlet pipe lines in
TGGENCO BTPS STAGE II CAM Division Reconditioning of Clinker Grinder Rollers Roller shafts Shaft sleeves fabrication of wear and guide plates and Shaft sleeve housings of Unit 3 Bottom Ash hopper Clinker Grinder Assemblies during the overhaul for the year 2025-26
Protection work of ash dyke between the chainage- 400 meter to 600 meter from course changing nallah running parallel to main ash dyke of bottom ash pond at 130 hectare ash pond of Unit no.10 and 11, 2x250 MW at STPS, Sarni.
Removal and transportation of spilled over ash under ESPs, Silos, under Hydrobins Bottom ash hopper area, to the designated area as of Unit-7 boiler or designated area within the plant premises of Dr.NTTPS, by trucks/tractors/trailers during the year 2024-25
Transportation of Dry Fly Ash from NLC to Ariyalur Cement Works
PORTLAND POZZPLANA CEMENT (PPC) (FLY ASH based) CONFORMING TO IS 1489
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 58000 MT fly ash in Unit I to V from the date of handing over of site
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 55 000 MT fly ash in Unit I to V from the date of handing over of site
AHP Dn Renewal of corroded and worn out Fly ash conveying pipe lines and erection of spares for PDFAC system in 1st 2nd row of Unit I Range from unit I ESP to Intermediate Surge Hopper Renewal of corroded and worn out compressor air lines
TTPS Mech II BM Unit I Cleaning of I and II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from 01 04 2023 to 31 03 2024
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 56 500 MT fly ash in Unit I to V from the date of handing over of site
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 47 000 MT fly ash in Unit I to V from the date of handing over of site
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 58000 MT fly ash in Unit I to V from the date of handing over of site
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 58000 MT fly ash in Unit I to V from the date of handing over of site
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 47000 MT fly ash in Unit I to V from the date of handing over of site
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 59 000 MT fly ash in Unit I to V from the date of handing over of site
TTPS Mech II BM Unit I II III Cleaning of zero meter floor in between BAH Mill and disposal of fly ash debris etc from to debris yard for the period from the date on or after 08 04 2020 and upto 30 09 2020
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 47500 MT fly ash in Unit I to V from the date of handing over of site
TTPS Mech II BM Unit I Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from 01 04 2026 and upto 31 03 2027