7,399 results • Best match
Break down maintenance of ash disposal pipe line, Removal of chocking of Ash disposal pipe line and Up-keeping etc. up to plant boundary of 3X210 MW ATPS Anpara.
Testing of Physical and Chemical characteristics of Fly Ash FOR NTPC Korba and LARA
Complete Set of Bottom Ash Overflow Transfer Pump: Earlier Pump sl no -15921-15924, Model- AR 150/50 (Q3), Impeller with nut/18 - Spares for Pump AR 150/510 (Q3), IMPELLER WITH NUT SP. FOR BOTTOM ASH-SLURRY PUMP MODEL AR150/500 FOR AHP PART NO- 18 & ... FOR FLY ASH SLURRY ...
Various works in Bottom Ash System and Fly Ash System of Ash Handling System of Unit 9 250 MW during overhauling of the Unit 9 AHD DTPS HTPS Kasimpur Aligarh
Engaging bulker for transportation of fly ash from NTPC Darlipali to ACC Bargarh
PNEUMATIC CYLINDER SEAL KIT POWER CYLINDER FOR BOTTOM ASH HOPPER GATETSTPS KANIHA
CS ball valves for ash handling system
9900259195 AGITATOR SPARES FOR ASH HANDLING PLANT
spares of Ash Crusher for Ash Handling
Supply of Pumps for Ash Handling System
Supply of spares for Ash Handling System
Procurement of Coupling for Ash handling Sysytem
Illumination work of Ash Handling System buildings
supply of valves for Ash Handling Plant
Procrement of Motors For Ash Handling Area
Procurement of Pipes for Ash Handling System
Procurement of Valves for Ash Handling Plant
Supply of Valves for Ash Handling Plant
Supply of Grating in ASH Handling Plant
Bottom Adaptors for Ash handling system (Q3)
couplings used in DRY ash handling system
SOVs for Dry Ash Handling System (Q3)
Bag Filter for Ash handling plant (Q3)
Supply of Adhesives for Ash Handling System
Rubber Seal kits for Ash Handling Plant
ECO APH Adapter for Ash Handling System
Globe valves for Ash Handling Maintenance 728039
VACUUM PUMP SPARES FOR ASH HANDLING SYSTEM
MHV Spares for Dry Ash Handling System
Welding Machines For Wet Ash Handling System
Overhauling of Unit#4 Ash Handling Plant.
VERTICAL TURBINE PUMP SPARES FOR ASH HANDLING
RADAR TYPE LEVEL TRANSMITTERS FOR ASH HANDLING
PROCUREMENT OF PIPELINE SPARES FOR ASH HANDLING
100204412HIGH ALUMINA CASTABLE REFRACTORY FOR BOTTOM ASH HOPPERS OVERHAULING FOR NTPC TALCHER (Q3), Procurement of Monolithic Castable Refractory for Bottom Ash Hopper of NTPC Khargone (Q3)
NCTPS I SE M II Circle AHP Dn Unit III Removal of settled ash clinker in Unit III common trench from bottom ash hopper to Ash Handling Pump House and interconnection tunnel between Unit III II by hammering during AOH 2024 2025
Gear Box of Bottom Ash Clinker Grinder, Make: Premium, Type: U-800, Ratio: 20: 1, Serial No. : 2RF 111, Input pinion shaft for gear box of bottom ash clinker grinder standard gear box, Type, Output pinion shaft for gear box of bottom ash clinker grinder standard gear box, Typ, Premium helical gear box type H1- 160, Ratio 1.66: 1, similar to existing gear box, Sl No: HGF- 19911
First Raising of Bottom Ash Lagoon-2 Dyke at NTPC, Mouda
Transportation of Fly ash to different locations situated within theradius of 100 kms of NTPC Singrauli
Anticipated breakdown rectification works on Ash disposal pumps, Seal water pumps and Ash disposal series inside the pump house and upto PD.No.1 of Ash disposal pump house of Stage- II/Dr.NTTPS as and when required during the year 2019-20
Anticipated breakdown rectification works on Ash disposal pumps, Seal water pumps and Ash disposal series inside the pump house and upto PD.No.1 of Ash disposal pump house of Stage-II/Dr.NTTPS as and when required during the year 2020-21.
Anticipated breakdown rectification works on Ash disposal pumps, Seal water pumps and Ash disposal series inside the pump house and upto PD.No.1 of Ash disposal pump house of Stage-II/Dr.NTTPS as and when required during the year 2020-21.
Anticipated breakdown rectification works of ash disposal pumps seal water pumps and ash disposal series in side the pump house and up to PD No 1 of ash disposal pump house of stage II Dr NTTPS during the 2025-26
Anticipated breakdown rectification works on Ash disposal pumps, Seal water pumps and Ash disposal series inside the pump house and upto PD.No.1 of Ash disposal pump house of stage-II/Dr.NTTPS as and when required during the year 2019-20
Anticipated breakdown rectification works of ash disposal pumps seal water pumps and ash disposal series inside the pump house and up to PD NO.1 of ash disposal pump house of Stage-II/Dr NTTPS during the year 2023 24
Bottom Ash Hopper mother plate reclamation and strengthening worksduring Unit4 overhaul of RSTPS 2023-24
Construction of CC platform for further parking yard of Flyash vehicles and RCC drains and Rest Hall with toilets at entrance near Material gate for Ash transportation vehicle drivers, helpers at STPP, Jaipur, Mancherial Dist., Telangana State
Rubber Seal Ring for pipes Coupling of Size: 350NB. for Fly Ash Pressure Conveying Line, Rubber Seal Ring for pipes Coupling of Size: 450NB. for Fly Ash Pressure Conveying Line, Rubber Seal Ring for pipes Coupling of Size: 200NB. for Fly Ash Pressure ... for Fly Ash Pressure ...
FORWARD EAUCTION FOR SALE OF 4.2 LAC TON DRY FLY ASH PER YEAR FROM BAKRESWAR THERMAL POWER STATION
CI PIPE FOR DRY ASH TRANSPORTATION LINE