CG SHREE--CENTRAL CEMENT INDUSTRIES Portland Pozzolana, CG SHREE--CENTRAL CEMENT INDUSTRIES Portland Pozzolana Cement (Fly Ash Based) of 50 Kg
CG SHREE--CENTRAL CEMENT INDUSTRIES Portland Pozzolana, CG SHREE--CENTRAL CEMENT INDUSTRIES Portland Pozzolana Cement (Fly Ash Based) of 50 Kg
MTPS I OAHS Dry Fly Ash shifting of weigh bridge Dismantling lifting removing the existing 100 tonne capacity of electronic weighbridge
Supply and delivery of different Spares of Alloy CI for Fly Ash Evacuation System for OH of Unit 5 at KTPS.
CG SHREE--CENTRAL CEMENT INDUSTRIES Portland Pozzolana, CG SHREE--CENTRAL CEMENT INDUSTRIES Portland Pozzolana Cement (Fly Ash Based) of 50 Kg
UNLOADING OF CHEMICAL GYPSUM, WET FLY ASH, LATERITE, LIMESTONE, SLAG ETC.. AND STORE ITEM LIKE REFRACTORY BRICKS, CASTABLES, ETC...FROM TRUCK
Construction of 22 fly ash ventilation stoppings at E0 district of Lower Workable Seam at Chhatarpur 1 Mine Pathakhera Area WCL
UNLOADING OF CHEMICAL GYPSUM, WET FLY ASH, LATERITE, LIMESTONE, SLAG , CLINKER AND STORE ITEMS LIKE REFRACTORY BRICKS, CASTABLES Etc, FROM TRUCKS.
CG SHREE--CENTRAL CEMENT INDUSTRIES Portland Pozzolana, CG SHREE--CENTRAL CEMENT INDUSTRIES Portland Pozzolana Cement (Fly Ash Based) of 50 Kg
Replacement of Boiler 1 to 4 Fly Ash Silo manually operated discharge sliding gate at Energy-Mechanical in TNPL Unit-I
Construction of 3 nos. 0.35m thick fly ash Ventilation Stopping in RVII A seam at Mill. Incline unit under Shankarpur Colliery.
Annual Rate Contract for Operation of unloading of Fly ash from Main silos( any three out of five) to Bowser KTPS
Construction of 15 number Fly Ash Ventilation Stopping at E1 District Lower Workable Seam at Chhatarpur 1 Mine Pathakhera Area WCL
2x600 MW SSTPP- Facilitating the fly ash users by providing loading arrangement at ash pond of 2x600 MW Dongalia Distt. Khandwa.
New construction of Junction support Pillar by fly ash bricks in RVII-A seam at Mill. Incline unit under Shankarpur Colliery.
SUPPLY OF PIT MATERIALS (FLY ASH SOLID BRICKS ONLY) TO RK-1A INCLINE FOR THE YEAR 2018 AT RKP, MANDAMARRI AREA.
Construction of under ground sump with fly ash brick masonary and pumping arrangement at Administrative Building Canteen on the O.U. Campus.
Filling of Ditches with Fly Ash, Partition Wall and SFRC Precast Pretensioned Compound Wall at Mantira Rehabilitation Colony in KNIC, Jajpur
Rotation/Replacement of Fly Ash Conveying Line with Painting for Upcoming OH Of Unit-6 under AHP(M/M) Dept. STPS.
Procurement of Body fluidizing pad installed in Nuva Feeder of Fly ash system of Unit 10 and 11 of STPS, Sarni.
Construction of 8 Nos Fly ash brick Ventilation Stopping in RVIIA Kenda Seam, No 2 Pit, TLB unit of Tilaboni Colliery
Construction of CC drain from Vikas School to Shankar Fly Ash bricks in ward no:9 under TSP Grant 2016-17
O&M-I-CAM-Erection of maintenance platforms for fly ash pipe rack of Stage-I/KTPP from ESP to Silos
Procuremnt of Fly ash Solid Bricks 300X200X150mm required for UG mines of RG.1 Area for a period of Two years
Supply of Fly Ash Solid Bricks (300 x 200 x 150MM) Required for GDK 1 and 3 Incline, RG-I Area
Construction of fly ash brick masonary compound wall at OU open land near P & T Colony junction, Habsiguda at O.U. Campus.
Supply of pit materials like Fly ash Bricks,Sand and 20mm metal to VK 7 Incline for the year 2018-19
Construction of 10 Ventilation Stoppings (Fly Ash Bricks) including all materials in Bagdona Seam at Tawa 2 Mine Pathakhera Area WCL
Reorganisation of Ventilation System of Tilaboni Colliery by construction of 15 Nos Fly ash (0.35m thick) Ventilation stopping in RVIIA Seam
MTPS I OAHS Dry Fly Ash shifting of weigh bridge Dismantling lifting removing the existing 100 tonne capacity of electronic weighbridge
Construction Of Fly ash Brick Boundary Wall With M.S Gate in Health Center Mahuda Bazar in Mahuda Under JMADA, Dhanbad ( 800ft)
Rotation/Replacement of Fly Ash Conveying Line with Painting for Upcoming OH Of Unit-6 under AHP(M/M) Dept. STPS.
Dr. MVR RTPP-M12-BM&AHP-Stage4-Procurement of cages and venturies for buffer hoppers of dry fly ash system-reg.
Dr. MVR RTPP-M12-BM&AHP-Stage4-Procurement of cages and venturies for buffer hoppers of dry fly ash system-reg.
Dr. MVR RTPP-M12-CAM-Stage-1-Procurement of different size and types of valves for dry fly ash system-reg
Dr. MVR RTPP-CAM-Stage2-Procurement of water ring vacuum pump equivalent to KVM-600 model for dry fly ash system
Repairing and re-conditioning of Airlock vessels of ESP fly ash system for Unit- 1&2 during the FY 2025-26
Dr. MVR RTPP-M12-CAM-Stage-1-Procurement of different size and types of valves for dry fly ash system-reg
Supply, Testing, Inspection, Packing, Transportation and Delivery of MS ERW Pipes required for use in the fly ash system of SDSTPS
Facility Management Services - LumpSum Based - Industrial; Removal of Fly ash; Consumables to be provided by service provider (inclusive in contract cost)
Custom Bid for Services - The work of analysis of physical and chemical characteristics of fly ash as per IS 3812 PartI2003
RATE CONTRACT FOR OnM OF MVF ASH DISPOSAL and AWRS WITH WATCH AND WARDFOR MINE VOID FILLING PROJECT OF NTPC TSTPS KANIHA.
Procurement of ISI marked asbestos cement pressure pipes manufactured using fly ash with MAZZA process size 150 to 600MM CLASS 10 and 15 conforming to IS 1592amended up to date
Providing Retaining wall to protect the downstream area against pond ash dumping at DVC,Konar Dam.
REMOVAL OF POND ASH FROM ASH POND AND FILLING IN LOW LYING AREAS IN NALCO DAMANJODI.
Esablishing automated plant and machinery for making pond ash based foamconcrete batching system at NTPC Sipat
REMOVAL OF POND ASH FROM ASH POND AND FILLING IN LOW LYING AREAS IN NALCO DAMANJODI
REMOVAL OF POND ASH FROM ASH POND AND FILLING IN LOW LYING AREAS AT NALCO, DAMANJODI
REPAIRING OF ASH DYKE EMBANKMENT ROAD FOR SAFE MOVEMENT OF POND ASH ANDVEHICLES AT NTPC, BARH
Levelling, filling and strengthening of open area for pond ash vehicle parking at North Gate, BTPS