Loading…
Loading…
7,524 results • Best match
Evacuation of ash from the Boiler ESP Bottom ash hopper ID Fan area related to Overhauling of unit 06 at KTPS
Evacuation of ash from the Boiler, ESP, Bottom ash hopper, I.D Fan area, related to Overhauling of unit # 03 at KTPS
Evacuation of ash from the Boiler ESP Bottom ash hopper ID Fan area related to Overhauling of unit 3 at KTPS
Evacuation of ash from the Boiler, ESP, Bottom ash hopper, I.D Fan area, related to Overhauling of unit # 06 at KTPS
Dr. MVR RTPP-M12-CAM-Stage2-Procurement of bearing housing assemblies including bearing for clinker grinder of bottom ash system-reg
SUPPLY OF CLINKER GRINDER ASSEBLY DOUBLE ROLL CLINKER GRIENDER OF SIZE :1140MMX850MM INSIDE SITE) FOR BOTTOM ASH HOPPER OF 600MW UNIT.
Dr. MVR RTPP-M12-CAM-Stage2-Procurement of bearing housing assemblies including bearing for clinker grinder of bottom ash system-reg
SUPPLY OF SINGLE TED POLE SEAL AND DOUBLE TED POLE SEALS FOR BOTTOM ASH HOPPER GATES OF UNIT 3 and 4
Refractory casting and patch up work for Unit-3 Bottom Ash Hopper during annual overhauling works of Unit-3 AHP, BTPS
Procurement of spares for UCC Make Eccentric crusher and Bottom Ash hopper of AHP of 1X500MW Unit No. 5, SGTPS, Birsinghpur.
Custom Bid for Services - Contract for ARC for assistance in data entry in operation stage1 housekeeping and stage1 bottom ash hopper
Custom Bid for Services - REMOVAL OF MILL REJECT BOTTOM ASH ESP HOPPERS EVACUATION STAGEIII 1X500MW FOR 2 YEARS at NTPC Korba
Fly Ash System-Round the clock direct collection of the Coarse Ash, fly ash, soot etc., from UNIT - 2 A&B pass ESP Hoppers by placing the tractor below the hoppers and disposing at suitable place as per the instructions of the engineer-in charge during the year 2025-26
Fly Ash System Round the clock direct collection of the Coarse Ash fly ash soot etc from UNIT-2 A&B pass ESP Hoppers by placing the tractor below the hoppers and disposing at suitable place as per the instructions of the engineer in charge during the year 2025-26
Fly Ash System- Round the clock direct collection of the Coarse Ash fly ash soot etc from UNIT-2 C&D pass ESP Hoppers by placing the tractor below the hoppers and disposing at suitable place as per the instructions of the engineer in charge during the year 2025-26
Fly Ash System-Round the clock direct collection of the Coarse Ash, fly ash, soot etc., from UNIT - 2 A&B pass ESP Hoppers by placing the tractor below the hoppers and disposing at suitable place as per the instructions of the engineer-in charge during the year 2025-26
Fly Ash System Round the clock direct collection of the Coarse Ash fly ash, soot etc from UNIT-2 C&D pass ESP Hoppers by placing the tractor below the hoppers and disposing at suitable place as per the instructions of the engineer in charge during the year 2025-26
Fly Ash System-Lifting & Transportation of ash, soot etc., collected in the ESP hoppers and conveying lines of Unit-1&2 ESP Fly ash system and other areas and disposal off the same at suitable place as per the instructions of the engineer-in charge during the financial year 2025-26
Round the Clock Operation Routine and Preventive mechanical maintenance and Breakdown mechanical maintenance of Ash Handling Plant of Unit No 08 and 09 DTPS HTPS Kasimpur for a period of one year
Arresting fly ash leakage all-round SILO-1 and 2 and Bottom ash SILO-1 and 2 in between RCC shell top and roof deck sheet and around supporting angles of fly ash silo 1 and 2.
QUIKWELL ENGG ASSOCIATES LEVEL SENSING DEVICE COMPLETE SET WITH CONROLLER AND PROBE, RF LEVEL SWITCH FOR ESP FLY ASH HOPPPER,, Level Switch EIP MODEL 550
100273474 PROCUREMENT OF 300NB DOUBLE DISC VALVE FOR DRY ASH TRANSPORTATION LINES AT NTPC KANTI
Custom Bid for Services - Job Contract for deployment of HSW manpower in Ash Utilization Department Works at NTPC-VSTPS Similar Category Manpower Outsourcing Services - Minimum wage
Custom Bid for Services - Comprehensive Biennial Manpower Contract for Ash Utilization & Environment Management Group at NTPC- Barauni Similar Category Operation and Maintenance Power House/Power Plant
Removal of accumulated ash/dumped ash /ground ash for ESP Hoppers area, Buffer Hoppers area,Air Pre Heater Hopper area, Economizer Hopper area,Bottom ash hopper area and remote silo area at ash handling plant of Unit-6 of Stage-IV/RTPP and the same ash should be transport and dumped at a ash pond area of RTPP for the year 2019-2020
Annual Maintenance Contract for Clearing of accumulated ash at ESP hoppers area Intermediate silo area Remote Silo area along the ash conveying pipe lines Bottom ash area Coarse ash area and transporting the same to the ash pond by trucks/tractors ... in Ash Handling Plant ...
Removal of accumalated ash/dumped ash /ground ash for ESP Hoppers area, Buffer Hoppers area,Air Pre Heater Hopper area, Economizer Hopper area,Bottom ash hopper area and remote silo area at ash handling plant of Unit-6 of Stage-IV/RTPP and the same ash should be transport and dumped at a ash pond area of RTPP for the year 2019-2020
Removal of accumalated ash/dumped ash /ground ash for ESP Hoppers area, Buffer Hoppers area,Air Pre Heater Hopper area, Economizer Hopper area,Bottom ash hopper area and remote silo area at ash handling plant of Unit-6 of Stage-IV/RTPP and the same ash should be transport and dumped at a ash pond area of RTPP for the year 2019-2020
Removal of accumalated ash or ground ash for ESP Hoppers area, Buffer Hoppers area,Air Pre Heater Hopper area, Economizer Hopper area,Bottom ash hopper area and remote silo area at ash handling plant of Unit-6 of Stage-IV-RTPP and the same ash should be transport and dumped at a ash pond area of RTPP for the year 2022-2023
Removal of accumalated ash and ground ash for ESP Hoppers area, Buffer Hoppers area,Air Pre Heater Hopper area, Economizer Hopper area,Bottom ash hopper area and remote silo area at ash handling plant of Unit-6 of Stage-IV-RTPP and the same ash should be transport and dumped at a ash pond area of RTPP for the year 2022-2023
Job Contract for transportation of approx 5.5 Lac M3 pond ash from AshDykes of NTPC Rihand to Road Project of NHAI at Varanasi
Procurement of M.S. Pipe of size 200 NB, 250 NB and 300NB installed at dry fly ash handling system GGSSTP, Rupnagar.
work of computation and processesing of ash utilization data at ASH Silo area and generating of e-invoice for sale of dry fly ash at DCRTPP Yamunanagar
Construction of Flyash brick compound wall for Government High School at Sethur in Thirunallar Commune.
Procurement of alloy cast iron fittings for dry ash handling system for AHP Stg-I, Lara
Baseline Biotic Study for Ash Disposal from Ramagundam STPP andTelangana STPP into Mine Voids of Medapalli open cast mine.
MECHANICAL MAINTENANCE AND MANPOWER ASSISTANCE FOR OPERATION OF IPH AND BARGE AREA OF ASH DISPOSAL SYSTEM TO MINES VOID
Replacement of ash disposal pipe line no 92 from Rakhi Pool to Chakari ash dam of 3x200MW, BTPS, Obra
Installation of Program for Monitoring of system for Ash Disposal Line Erosion patterns of AHP-IV at STPS Sarni.
Custom Bid for Services - 200130418 BIENNIAL JOB CONTRACT FOR MAINTENANCE ROTATION REPLACEMENT OF ASH DISPOSAL PIPELINES AT NTPC VSTPS
Custom Bid for Services - 200130419 BIENNIAL JOB CONTRACT FOR MAINTENANCEROTATIONREPLACEMENT OF ASH DISPOSAL PIPELINES AT NTPC VSTPS IN PARTD
AHP Dn UNIT I Attending breakdown works in Bottom Ash Hopper Scrapper feeder Clinker Grinders for a period of six months from the date of taking over of site or)completion of quantity whichever comes earlier
AHP Dn UNIT III Attending breakdown works in Bottom Ash Hopper Scrapper feeder Clinker Grinders for a period of six months from the date of taking over of site or)completion of quantity whichever comes earlier
Evacuation of ash from the Boiler ESP Bottom ash hopper I D Fan area related to Overhauling of unit 04 at KTPS
Refractory work by Gunning Machine inside Bottom Ash Hopper during Respective Unit Overhauling for Unit#5 and #3 ,BkTPS in 2026-2027
Green barricading at Kherobar School and Fly ash brick plant located at Chamgudo Khurd, KTPS, Koderma. for compliance of subcommittee report in respect of Environmental Clearance for expansion project of KTPS phase -2.
AMC Service for round the clock operation, maintenance, shutdown and overhauling of all equipments in Ash Handling Plant of 2 x 270 MW Thermal power Plant GATP, Goindwal Sahib. For a period of one year. As per the detail Scope of Work.
Supply of Spares for Dunkan make Power cylinder in Ash Handling Plant C and I at NTPC Simhadri STPS
COLLECTION AND TRANSPORTATION OF DRY FLY ASH FROM NLC TAMIL NADU POWER LIMITED, TUTICORIN, TAMIL NADU STATE TO MALABAR CEMENTS LIMITED WALAYAR ,KERALA
Providing fly ash cement concrete pavement around Oxidation ponds in phase-II and sewer line connections to the oxidation ponds at HWPM Colony.