Loading…
Loading…
7,778 results • Best match
Reconstruction of Boundary wall, making footpath, laying storm water drainage line and provision of street lights along the Aurobindo Marg boundary wall (from gate no.3 up to the corner of IIT flyover) in the east campus area at IIT Delhi
MOEI Fans RMO Pump Sets in PWD Circle office South East Division offices South East Road and 2 and DD Horticulture office at Visheswarya Flyover Sukhdev Vihar New Delhi SH Electrical work in newly constructed Road Sub Division 22 Sarita Vihar
Comprehensive maintenance of various road under Division SER-1 dg 2024-25 SH Providing and fixing concertina coil fencing on parapet wall BRT road, Barapullah Flyover loop, Mathura Road and various location under Division SER-1, Sub-Division SER-14
Strengthening of Pankha Road Bhagwan Mahavir Marg Kali Mata Mandir to Dabri Flyover and Shani Bazar road Shri Radha Krishan Thakur Marg ID 1160 from Vidya Marg to Dabri Road Janakpuri under Division WR-1 Janakpuri, New Delhi (Balance Work).....
A/R and M/O to various roads under East Road-IV, of PWD East Road Division dg. 2025-26. (SH- Creation of additional office space, repair/restoration and upgradation of Division office East Road/(M-212) Under Akshardham flyover)
Widening of road and improvement of footpath with making planation strip from island under palam flyover to bikaner sweet corner on palam dabri road for re-claiming the road row after removing encroachments under sub Division 21,SWR-II, New Delhi.
Providing Jungle Cutting and White Washing to Muslim graveyards in view of Shab-e-barat-2026 near Omega Hotel,opposite Reliance fresh under Adikmet Flyover in Adikmet Ward-163 in Musheerabad Cirle - 41, Sec-bad Zone, GHMC. (Rs. 0.98 Lakh)
Strengthening of existing damaged wetmix / BT road from Hitech flyover to 100'feet road via MJR building CN Thanda road in Ward No.107 Madhapur, Division No.21, Chandanagar Circle,WZ,GHMC - 2nd Re Call (Reserved for Hotmix plant owners only).
Annual Desilting and Annual maintenance of storm water drains by bucket cleaning machine at Golla basthi, Shah hatim pahad (MD lines) and under Langer house flyover under Golconda corporator division-67,Div-13,KZ, GHMC for the year 2025(Item.No.9)
Dismantling of 48 Left side affected properties under Phase VII for the proposed flyover and road widening from Golnaka Shalem Church to Mukram Hotel Irani Hotel via 6 No X road and Amberpet Junction under proposed 35.5 m wide road
Pre-monsoon and Post-Monsoon Desilting of Kukatpally nala from Nature Cure Hospital to Hanuman Temple (Mechanical Means) near Begumpet flyover and under vents in 149-Begumpet Corporator Divn Under Circle-30,North Zone GHMC for the calendar Year 2020.
Supply, Delivery and erection of Submersible pump set repairs and maintenance Materials works at Tadbund nursery, Cantonment (JBS) Nursery, Terrace Park, Clock tower park, Indian Airlines park and Begumpet flyover of Circle-30, Begumpet, SCZ, GHMC for the year 2022-23
Estimate for Providing Drip Irrigation System with all requirements needed including Supply of Drip Material, Transportation & Installation, including One (1) year warranty and service providing in under the Bio-Diversity flyover, Circle-20, Serilinlgampally Zone, GHMC during the year 2020-21.
Removal of water stagnation by providing gratings at Aditya nagar flyover, damaged grills at kothaguda underpass and at various places of Madhapur Ward No.107, Chandanagar Circle-21, SLP Zone, GHMC-Re Call, A S Date: 24.06.2025, Budget year 2025-26
Maintenance of Vertical Garden underneath the Owaisi flyover at Pillar No.1 to 38(11 pillars) from Kharmanghat to Owaisi Hospital, Circle-8, Charminar ZOne, UBD, GHMC for a period of (12) months during the year 2024-25 (Bit I & II)
Upscaling of street furniture, sculptures, fountains, cascades and lighting at Gangaram Lake Junction Change of scope of work and change of site to Artistic painting to Shaikpet flyover RE walls and pillars in Circle-20, Serilingampally Zone, GHMC (Item No.2)
Dismantling of 31 (Left & Right side) affected properties under phase-I for the proposed flyover and road widening from GolnakaShalem Church to Mukram Hotel (Irani Hotel) via "6" No. "X" ROAD & Amberpet Junction under proposed 35.5 m wide road".(2nd Recall)
Engaging of one truck mounted sewer suction cum jetting machine in Airport to Flyover via Benz Circle cleaning rainy season stagnated of rain water in Work Division 3 area for hire basis from 01.06.2019 to 30.11.2019 (183days)1st Call General Funds
2024-Eng04-31-115 Providing geometric corrections to BT Layer including raising of existing construction joint near critical location at Telugu thalli flyover as per the recommendations of the district road safety committee in ward no.31 of Zone-IV
Maint. Elect. Consumption Charges of Street Lighting on PWD Roads under North Electrical Sub Division I. SH SITC of 8 mtr GI Octagonal pole and other allied electrical work at Azadpur Loop at Mukundpur Flyover to improve street light system
M/o Completed Schemes under Flyover. SH-Day to Day cleaning, sweeping of parks over deck slab of covered Nallah and adjacent footpath i.e. from Culvert near Police Station Lajpat Nagar up to Barapullah Nallah etc i/c disposal of garbage.
Repair and maintenance of Infrastructure assets in R-II Division during 2023-24. Sub Head - Hiring of Tempo/TATA, MAHINDRA, MARUTI SUZUKI, ASHOKA LEYLAND (BS-Latest standard) at Safdarjung flyover service Centre sub division-III(R-II Division) for da
M/o Hort. Works attached to Mahipalpur Bypass (CPWD Flyover to NH-8 Underpass), Mehrauli Mahipalpur Road and Nelson Mandela Marg under HSD South-II/HD-South/PWD/New Delhi dg. 2023-24 (SH- Maintenance of Hort. Work-2nd Call)
Mtc. Of Agartala town roads during the year 2022 23 SH Mtc. Of Road portion from i Drop gate Flyover approach to Fire service left Side road by grouting, recarpeting etc. works under the jurisdiction of Central III Sub Division
Mtc. Of Agartala town roads during the year 2022 23 SH Mtc. Of Road portion from i Fire service chowmuhani to Drop gate Flyover approach Left side road by grouting, Recarpeting etc. works under the jurisdiction of Central III Sub Division
GIS related Survey Services - Sq. Meter; 1 Bridges 2 Flyover 3 Residential 4 Commercial 5 Semi Commercial 6 Educational 7 Health Services 8 Railway 9 Religious 10 Recreational 11 Public Utilities 12 Communication 13 Vacant Land 14 Transportation 15 T..
Providing 200mm dia bore well, 15 HP submersible pump set and HDPE piping arrangements with all accessories for water facility to beautification for Kanakadurga Flyover pillars to Vertical Garden from Head water works to Kummaripalem Junction in Works Division-I area
Providing of Coping and painting of central lighting poles from Panama to Seetharam puram (i.e.GHMC Limits-121nos), B.N Reddy junction to Sagar complex (i.e.GHMC Limits-28nos) and Kamineni Flyover to Alkapuri Junction(13nos) of Hayathnagar Circle 3, LB Nagar Zone, GHMC
Strengthening and Recarpeting of existing BT road at salar bridge in hakeempet from Mughal residency to Hanuman temple and from A1 meat shop to kaba hospital under Tolichowki flyover,Nanal nagar-69, Ward -9 Cir-13 KZ, GHMC. (Item 2)
Shifting of 350 mm dia DI WS line failing under the alignment of new SRDP flyover work from Maharaja Hotel, Gachibowli Nehru ORR junction to street No.2, Gachibowli village under Kondapur section, Sub Division I, O and M Division XV.
Laying of 300mm dia SWG sewer line in place of damaged 200mm dia sewer line from H.No.12-1-511 to 12-1-514/515 under Flyover Bridge Arya Nagar Slum under Lalapet Section, SD-III, O and M Division No.VII.
Estimate for Arrangement of Providing of Temporary lighting Decorative series lamp at Hafeezpet flyover in view of Telangana State Formation Day for the year of 2021 for Two days i.e. 01.06.2021 to 02.06.2021 in Chanda nagar Circle-21,Serilingampally Zone,GHMC
"Providing of LED Rope lighting to beautification of existing 68 nos. i.e., (43 nos. of Side modern lighting poles & 25 nos. of central modern lighting poles) from Nalgonda flyover bridge to Chanchalguda x Road in Malakpaet Circle -6 and constituency"
Maintenance of Vertical Garden underneath the Owaisi flyover at pillar no. 1 to 38(5 pillars)from Kharmanghat to Owaisi Hospital, Circle-8, Charminar Zone, UBD, GHMC for a period of 12 months during the year 2023-24 (Bit-II)
Estimate for Dismantling of 11 mtrs tubular street light poles fouling under proposed flyover at balanagar division and action of new pscc street lights poles on either side of road of kukatpally circle - 24, west zone, GHMC. (Item No. 05)
(CRMP Stretch) Enhancement of RCC Box Drain size to the existing drain at Reddy Colony Entrance to Shiva Ganga Granites and Marbles shop on Inner Ring Road at Bairamalguda Flyover in W.No.16 Hasthinapuram of LB Nagar Circle-4,GHMC
Estimate for Providing of New Street Lights from RTA Office to Kothaguda Junction and Kothaguda Junction to Ramalayam Temple ( Due to Flyover Contruction Central lighting poles removed ) at Madhapur in Division - 107, in Chandanagar Circle - 21, Serilingampally Zone, GHMC. (Left Side)
Providing of 24 No's 7.5 Mtrs Octagonal poles and 2 No's 10 Mtrs. Octagonal poles with 110W LED fittings at Sanath Nagar main road (erragadda X road to Fathenagar flyover) in Sanath Nagar Division of Khairatabad Circle-17, Khairatabad Zone, GHMC.
Providing of Temporary decorative series lights and par can lights from Greenland Flyover in Ameerpet division of Khairathabad circle in view of "TELANGANA FORMATION DAY" for Two days i.e., ,0l-06-2022 & 02-06-2022. (Reserved for ST/SC Waddera LCCS)
Providing of chain link mesh to kukatpally nala from varun motors to Geethanjali public school underneath Begumpet flyover on both sides, near Hanuman temple, Annapurna canteen and flooring with in 149 BEGUMPET Corp division under Cir -30, GHMC, Sec-bad
Dismantling of 26 Left side affected properties under Phase VIII for the proposed flyover and road widening from Golnaka Shalem Church to Mukram Hotel Irani Hotel via 6 No X road and Amberpet Junction under proposed 35. 5 m wide road
Providing of temporary Decorative series lighting in view of Republic day (Horizontal National Flag including Ashoka Chakra for Telugu Thalli Flyover side & Commissioner Side) at GHMC Head office building in Gunfoundry Division of Clrcle-14, Khairatabad Zone, GHMC for two days.
Submersible Pumpset Repairs and Maintenance material and Laying & Jointing HDPE Pipe Line work at:- SRT 903 Park, SRT 961 Colony Park, SRT 1090 Colony Park, Potti Sriramulu Colony Park, Telugutalli flyover, Park Avenue Park, Balkampet Graveyard in Circle-17,KZ, GHMC
Estimate for Arrangement of providing of temporary lighting decorative series lamps at Traffic island at Nankaramguda circle and nallagandla flyover in view of Telangana state formation day for two days ie. 01.06.2018 to 02.06.2018 in Serilingampally circle-20,wz,ghmc
Dismantling of 45 (left side) affected properties under phase - iv for the proposed flyover and road widening from Golnaka shalem church to mukaram hotel ( Irani Hotel ) via " 6 " No. ' x 'road and amberpet junction under proposed 35.50 mts wide road.
Construction of RCC Retaining wall (P9)in gap portion of murkinala at Aljubail Colony from Amina Masjid to H.No 19-4-7/A/219 near to 19-4-7/A/121 at Hashamabad and Aljubail colony Falaknuma near flyover(RHS)
Formation of Balance Service Road, Strengthening and Re-Carpeting of existing road (Excluding flyover shadow portion) & Construction of Storm Water Drain on both of sides for 215' wide road from FOB at Divya Sree to Care Hospital at Bio Diversity Junction.
Drilling of 6 1/2 dia bore well , supply delivery, erection of submersible pump set, laying and jointing of HDPE pipeline underneath the flyover at VST in circle-15, Musheerabad, SCZ,GHMC during the year 2023-24 ( Bit -II VST side)
Providing of Temporary Decorative lights at Masab Tank Flyover (Including Below Greenery, Including Chita Island & Duck Islands) in Vijay Nagar Colony Package in view of World Telugu Conference-2017 for 5 Days i.e., from 15-12-2017 to 19-12-2017
Construction of VUP Flyover at Medical Tiraha to Konchhabhawar Jhansi (Km. 105.700 to Km. 106.800) on NH25 (New NH27) and Interchange at Km. 97.100 on NH25 (new NH27) for Shivpuri Kanpur Road (Jhansi Bypass) section in Uttar Pradesh on EPC mode