Loading…
Loading…
1,678 results • Best match
Dismantling and re-erection 38 nos. of modern lighting poles from Tadbun to Danamma Jopidi in Ramnaspura division (55) in Falaknuma Circle-10 of Bahadurpura Constituency (under SRDP Project) for construction of flyover (Reserved for SC/ST/WLCCS)
Supply, Delivery and erection of submersible pump set repairs and maintenance material works at Begumpet flyover, East Marredpally park, Butterfly Park, St. Johns park and Terrace park of Circle-30, Begumpet, SCZ, GHMC for the year 2021-22
Providing of MS Railing for Pedestrian Footpath from HPS gate no 1 to gate no 3, and at BEGUMPET FLYOVER OPP HANUMAN TEMPLE IN Ward-149, under Circle 30, ,Secundrabad Zone,GHMC(3rd Recall) (Budget FY 2024-25)
Repairs to damaged central median iron Grill to Masab tank Flyover approaches and painting to central median iron Grill from NMDC to PH Office under Vijaya Nagar Colony Division -73, Mehdipatnam, Circle-12, KZ, GHMC. (Item No.5)
Providing Jungle cutting and white washing to muslim graveyards in view of Shab-e-Barat-2023 near Omega Hotel, opposite Reliance fresh and under Adikmet Flyover in Adikmet ward-85, Division-15, Secbad zone, GHMC (Rs. 0.90 Lakh)
Providing of Temporary decorative series lights and par can lights from Greenland Flyover in Ameerpet division of Khairathabad circle in view of formation day of "TELANGANA STATE" for Two days i.e., 01-06-2018 to 02-06-2018.
Development and Maintenance of Greenery underneath flyover from Mir Alam Tank (HMWS and SB) to Zoo Park (Bit-III) of 16 spans in Circle-10, Falaknuma, Charminar Zone, UBD, GHMC for the year 2024-25(P107 to P122)
Development of road infrastructure viz a flyover, high level bridge and underpass at Yellandu in Bhadradri Kothaudem District. S.W:- Providing Road Safety Interventions at Geometric improved portions and scour filling in NH 930 P to Karepally Junction Road.
Laying of BT patches of Balapur Ganesh procession route from Gurram Cheruvu to towards Falaknuma Flyover Road on the Occation of Ganesh Festival for the Yeat 2021 - 22 in Chandrayangutta Cir-8, CRZ - GHMC. - Rs.14.50 Lakhs (Recall)
Removal of water stagnation by Laying of 450mm dia NP3 Pipe line at masab tank flyover approaches (NMDC side and Chacha Nehru park side) under Vijaya nagar Colony division -73, Mehdipatnam Circle-12, KZ, GHMC (Item No.2)
Maintenance of greenery underneath the flyover SS Grand Convention to Mir Alam Tank Secondery Collection, of 56 spans at (Pillar No. P18 to P74).Circle-19 ,RJNRZ, UBD, GHMC, for the year of 2026-2027 for 12 months.
Maintenance of Vertical Garden underneath the flyover at Pillar Nos.P6, P7 and P8 (3 Pillars) at Bahadurpura X road in Ward No.56, Kishanbagh Division, Circle-10, Falaknuma Circle, Charminar Zone, UBD, GHMC for the year 2025-26
Supply delivery and erection submersible pumpset repairs and maintenance material at telugu thalli flyover tank bund Rotary park Childrens park Tank bund Khairtabad office park Methodist colony park I Sriramnagar colony Krishnakanth Park Industrial Park Circle 10A CZ GHMC
Shifting of 200/250/350/450/600mm dia DI water supply lines to avoid obstructions of Flyover alignment Opp.SBI Bank Riyasath nagar to Dargah Burhane Shah sahab and Owaisi Hospital under Balapur section, SD-III of O&M Dn.II
Renovation of Central median and planter box at various locations viz from Rolling hills to Ikea flyover, shilpa layout roads and from Jayabheri Nexa showroom to Anjaiahnagar Government school in Circle-20, SLPZ GHMC during the year 2025-26
Creation of Greenery at Model Corridor from Mettuguda Metro Station to Tarnaka Flyover (both sides) in circle-29 and Creation of Greenery at Sangeeth Junction (Under Junction Improvement) in Secuderabad Zone, GHMC for the year 2023-24 (6th recall)
Maintenance, Greenary walls development to the existing land scaping beneath the Masab tank Flyover and repairs to kerbing, painting with teracott and rangoli painting under Vijay Nagar Colony-73, Mehdipatnam Circle-12, KZ, GHMC (Item No.1) 1st RECALL
Development and Maintenance of greeney underneath the flyover from Mir Alam Tank (HMWS and SB) to Zoo ark (Bit-II) of 16 spans in Circle-10, Falaknuma, Charminar Zone, UBD, GHMC for the year 2024-25 (P92 to P106)
Development and Maintenance of greenery underneath the flyover from Mir Alam Tank (HMWS and SB) to Zonn park (Bit-I) of 16 spans in Circle-10, Falaknuma, Charminar Zone, UBD, GHMC for the year 2024-25 (P75 to P91)
Laying of proposed 150mm dia DI main from RK Puram Flyover to Santhosh Colony to avoid hardships of collecting water by vessels from mobile water tankers to Santhosh Colony under Defence Colony, SD-II, O&M Division XIII, Malkajgiri.
Annual Desilting and Annual maintenance of storm water drains by bucket cleaning machine at Golla basthi, Shah hatim pahad (MD lines) and under Langer house flyover under Golconda corporator division-67,Div-13,KZ, GHMC for the year 2024
Estimate for Arrangement of providing of Temporary lgihtign decorative series lamp at cyber tower flyover and its underneath in view of Telangana state formation day for two days i.e 01.06.2018 to 02.06.2018 in Chanda nagar circle-21,wz,ghmc.
Drilling of 6 1/2 dia bore well, supply, delivery and erection of suitable submersible pump set and laying and jointing of HDPE pipe line work at Paradise Flyover in circle-30, SCZ, GHMC for the year 2023-24 .
Laying of table drain from Moulali Flyover to Life Spring Hospital, ZTC X Road to Mythri Cafe, Mirzalguda X Road to Malkajgiri X road in CRMP Roads Ward No.139, of GHMC, Malkajgiri Circle-28. (CRMP Stretch) (4th call)
S/R of BT Road from H.No. 3-4-529/3 to Narayanguda Flyover (Arya Boys Study Hall) via. H.No. 3-4-528/B in Kachiguda Division-80, Circle-16, Secunderabad Zone, GHMC. Item NO.01 Rs.26.25 Lakhs
ESTIMATE FOR ARRANGEMENT OF PROVIDING OF TEMPORARY LIGHTING DECORATIVE SERIES LAMPS AT TRAFFIC ISLAND AT NANAKRAMGUDA CIRCLE AD NALLANDLA FLYOVER IN VIEW OF TELANGANA STATE FORMATION DAY FOR TWO DAYS 01.06.2019 TO 02.06.2019IN SERILINGAMPALLY CIRCLE 20,SLP ZONE GHMC
Estimate for Dismantling of MS Tubular poles from Gachibowli Junction (Near Maharaja Hotel) to Tata showroom towards Kothaguda junction and arranging side-lighting to the available poles for construction of Gachibowli flyover in Serilingamplly Circle-20, Serilingampally Zone,GHMC
Development and maintenance of Greenery at under Bachupally Flyover
Providing Jungle Cutting and White Washing to Muslim graveyards in view of Shab-e-barat-2026 near Omega Hotel,opposite Reliance fresh under Adikmet Flyover in Adikmet Ward-163 in Musheerabad Cirle - 41, Sec-bad Zone, GHMC. (Rs. 0.98 Lakh)
Strengthening of existing damaged wetmix / BT road from Hitech flyover to 100'feet road via MJR building CN Thanda road in Ward No.107 Madhapur, Division No.21, Chandanagar Circle,WZ,GHMC - 2nd Re Call (Reserved for Hotmix plant owners only).
Annual Desilting and Annual maintenance of storm water drains by bucket cleaning machine at Golla basthi, Shah hatim pahad (MD lines) and under Langer house flyover under Golconda corporator division-67,Div-13,KZ, GHMC for the year 2025(Item.No.9)
Dismantling of 48 Left side affected properties under Phase VII for the proposed flyover and road widening from Golnaka Shalem Church to Mukram Hotel Irani Hotel via 6 No X road and Amberpet Junction under proposed 35.5 m wide road
Pre-monsoon and Post-Monsoon Desilting of Kukatpally nala from Nature Cure Hospital to Hanuman Temple (Mechanical Means) near Begumpet flyover and under vents in 149-Begumpet Corporator Divn Under Circle-30,North Zone GHMC for the calendar Year 2020.
Supply, Delivery and erection of Submersible pump set repairs and maintenance Materials works at Tadbund nursery, Cantonment (JBS) Nursery, Terrace Park, Clock tower park, Indian Airlines park and Begumpet flyover of Circle-30, Begumpet, SCZ, GHMC for the year 2022-23
Estimate for Providing Drip Irrigation System with all requirements needed including Supply of Drip Material, Transportation & Installation, including One (1) year warranty and service providing in under the Bio-Diversity flyover, Circle-20, Serilinlgampally Zone, GHMC during the year 2020-21.
Removal of water stagnation by providing gratings at Aditya nagar flyover, damaged grills at kothaguda underpass and at various places of Madhapur Ward No.107, Chandanagar Circle-21, SLP Zone, GHMC-Re Call, A S Date: 24.06.2025, Budget year 2025-26
Maintenance of Vertical Garden underneath the Owaisi flyover at Pillar No.1 to 38(11 pillars) from Kharmanghat to Owaisi Hospital, Circle-8, Charminar ZOne, UBD, GHMC for a period of (12) months during the year 2024-25 (Bit I & II)
Upscaling of street furniture, sculptures, fountains, cascades and lighting at Gangaram Lake Junction Change of scope of work and change of site to Artistic painting to Shaikpet flyover RE walls and pillars in Circle-20, Serilingampally Zone, GHMC (Item No.2)
Dismantling of 31 (Left & Right side) affected properties under phase-I for the proposed flyover and road widening from GolnakaShalem Church to Mukram Hotel (Irani Hotel) via "6" No. "X" ROAD & Amberpet Junction under proposed 35.5 m wide road".(2nd Recall)
Providing of Coping and painting of central lighting poles from Panama to Seetharam puram (i.e.GHMC Limits-121nos), B.N Reddy junction to Sagar complex (i.e.GHMC Limits-28nos) and Kamineni Flyover to Alkapuri Junction(13nos) of Hayathnagar Circle 3, LB Nagar Zone, GHMC
Strengthening and Recarpeting of existing BT road at salar bridge in hakeempet from Mughal residency to Hanuman temple and from A1 meat shop to kaba hospital under Tolichowki flyover,Nanal nagar-69, Ward -9 Cir-13 KZ, GHMC. (Item 2)
Shifting of 350 mm dia DI WS line failing under the alignment of new SRDP flyover work from Maharaja Hotel, Gachibowli Nehru ORR junction to street No.2, Gachibowli village under Kondapur section, Sub Division I, O and M Division XV.
Laying of 300mm dia SWG sewer line in place of damaged 200mm dia sewer line from H.No.12-1-511 to 12-1-514/515 under Flyover Bridge Arya Nagar Slum under Lalapet Section, SD-III, O and M Division No.VII.
Estimate for Arrangement of Providing of Temporary lighting Decorative series lamp at Hafeezpet flyover in view of Telangana State Formation Day for the year of 2021 for Two days i.e. 01.06.2021 to 02.06.2021 in Chanda nagar Circle-21,Serilingampally Zone,GHMC
"Providing of LED Rope lighting to beautification of existing 68 nos. i.e., (43 nos. of Side modern lighting poles & 25 nos. of central modern lighting poles) from Nalgonda flyover bridge to Chanchalguda x Road in Malakpaet Circle -6 and constituency"
Maintenance of Vertical Garden underneath the Owaisi flyover at pillar no. 1 to 38(5 pillars)from Kharmanghat to Owaisi Hospital, Circle-8, Charminar Zone, UBD, GHMC for a period of 12 months during the year 2023-24 (Bit-II)
Estimate for Dismantling of 11 mtrs tubular street light poles fouling under proposed flyover at balanagar division and action of new pscc street lights poles on either side of road of kukatpally circle - 24, west zone, GHMC. (Item No. 05)
(CRMP Stretch) Enhancement of RCC Box Drain size to the existing drain at Reddy Colony Entrance to Shiva Ganga Granites and Marbles shop on Inner Ring Road at Bairamalguda Flyover in W.No.16 Hasthinapuram of LB Nagar Circle-4,GHMC
Estimate for Providing of New Street Lights from RTA Office to Kothaguda Junction and Kothaguda Junction to Ramalayam Temple ( Due to Flyover Contruction Central lighting poles removed ) at Madhapur in Division - 107, in Chandanagar Circle - 21, Serilingampally Zone, GHMC. (Left Side)
Providing of 24 No's 7.5 Mtrs Octagonal poles and 2 No's 10 Mtrs. Octagonal poles with 110W LED fittings at Sanath Nagar main road (erragadda X road to Fathenagar flyover) in Sanath Nagar Division of Khairatabad Circle-17, Khairatabad Zone, GHMC.