Loading…
Loading…
672 results • Best match
M/o W/s (Shifting of 800mm dia D.I. Pipe Line at Parthla Chowk Sector-122 due to construction of Flyover) Noida.
On Occasion of organizing of G-20 Summit and Global Investors Summit in Lucknow city, Painting work of Lohiyapath L-Shape flyover.
Hariparvat Zone, Construction work by interlocking tiles on side track on both sides of service lane of flyover located at Bhagwan Talkies
Strengthening of road (Providing and Laying of DBM and BC work on MP-3 road from Parthala Flyover to Hindon Bridge ), Noida
Request for Proposal (RFP) for Selection of Agency for Plantation, Beautification, and Two-Year Maintenance Work under Chaukaghat-Andhrapul Flyover in Varanasi
Name of Work No 119, Ward No. 24 Pandav nagar me rajapur flyover se new era school tak interlocking tiles ka karya
Hariparvat Zone, Construction work by interlocking tiles on side tracks on both sides of service lane of flyover located at Water Works.
Rishimaandavee maandavee jon antargat vaard no 38 kakarmattame me opal hospital ke samne flyover se bal vidyalay tak nterlocking marammat ka karya
M/o Road(Re-Construction of RCC Footpath and Pathway along 45Mtr Wide road from Bhangel T-Point upto Jaypee Flyover) Noida
M/o Green Belt (Railing Work and Beautification near Banaras Ghat, Tajmahal, Budha Stup and Mahamaya Flyover due to G-20) Noida.
Conversion of Overhead power lines to under ground and Transformers LED Street LightingIn ROW of Both side along High Court Flyover Prayagraj
Strengthening of Road (P/L Bitumen Mastic wearing course on clover leafe of Mahamaya Flyover Sector-94 and Sector-95 side) Noida
Construction of Road Work at service road and approaches of flyover on Bareilly-Shahjahanpur road near satellite bus stand in district Bareilly.
04 - ward number 26 Meerut road per flyover ke niche Nandraj Mill se shiva dhabe ke pass Tak RCC Nala Nirman karya
Improvement of Wending Zone By I/L Tiles Infront of Air Force Boundary Under Flyover At J.K. Chauraha in ward 58 Zone02
Improvement of Weding zone by Interlocking tiles infront of sent josef school under Flyover at jk chauraha in ward 58 zone 02
Imp Of Wending Zone by Interlocking tiles from Indian Petrol Pump to Awasthi Hospital Under Flyover At Devi Chouaraha In Zone 02.
Under Vasundhara Zone, the work of scenery and paint on both sides of the elevated road and the central verge and repair and painting work of both sides and footpaths from Roundabout to Karhaida Bridge. (G-20)
Construction o 1 ROB and 3 Flyovers of National Highway No. 730 at the section from Km 133.230 to Km 134.330, Km 134.550 to Km 135.650, Km 136.200 to Km 137.800 in the State of Uttar Pradesh (approx.3.800 km)
Construction of earth work, GSB and WMM in service road of flyover on Bareilly-Shahjahanpur road near satellite bus stand in district Bareilly
Work of strengthening and beautification of Rambagh flyover end-point intersection, Shiv Charandas intersection, Arya Kanya intersection and Baluaghat intersection in Prayagraj city.
Nagar Panchayat Khutar me Banda Road pr Anubhav Singh ki Dukan se Flyover ke Age Saufari Wali Puliya tak RCC Covred Nala Nirman.
On Occasion of organizing of G-20 Summit and Global Investers Summit in Lucknow City, Painting work of Flyover situated at Tulsidas Road.
Patch repair work by Hotmix on the road from Janata Colony Railway Gate to Palheda flyover and JS Academy road in Ward 27.
Hariparvat Zone, ISBT Construction work by interlocking tiles on the side track on both sides of the service lane of the flyover located.
Strengthening of Road (P/L DBM and BC work on MP-3 road Main Carriageway from Sector-71 Underpass to Parthala Flyover), Noida
Jansath flyover ke neche mahaveer chowk se railway line tak shatigarth bhag me R.C.C nala nirman evam sampurn nale ko dhakne ka karye
Barricating the open areas of the divider on the road from Bagumpul choraha to Partapur Flyover ward-52, 68, 42, 35, 06, 10
Supply, Installation, testing and commissioning of EPABX System in Second and Third Floor Command Control Center Building near mahamaya flyover, Sector-94, Noida.
M/o RSP Sector-44,94,DSC Road, Shivalik Marg, Kamal Marg, MP-IInd, Round about Mahamaya Flyover, Botanical Garden (G-20 Tree Painting)
Work no 05 S I T C of LED street lighting work with ornamental Pole at Railway line flyover 100 feet road vrindavan
Zone-3 mazar chauraha se shivkuti thana flyover bridge ke niche service lane MNNIT gate railway crossing tak marg ke lepan ka karya
Work no 15, ward -18 Razapur me Raj Gas Agency se M-block hote hue Razaur flyover tak RCC nala nirman ka karya
Shifting of 11 KV Electrical systems due to construction of elevated flyover to interconnect Lucknow airport with Shaheed path and other related works.
Fabrication and Erection of Steel Girder for the Construction of 42.2 Mtr. Span Steel Composite box Girder for Chaupla Flyover in Distt Bareilly.
Annual Maintenance of Street Light in Sector-42,43,44,45, Related of these sectors and around Mahamaya flyover, Kalindi Kunj road, and DSC Road, Noida
STRENGTHENING OF ROAD(P/L DBM AND BC WORK ON 45.00M WIDE ROAD PARALLEL OF EXPRESSWAY X-CHOWK TO SECTOR-82 FLYOVER) NOIDA
Special repair work by BC on the flyover from change 4.400 to 5.192 of Meerut Baraut (State Highway No. 119) in Meerut district
Construction of 4 lane Flyover with service/slip road at Hapur Chungi Junction, Ghaziabad Uttar Pradesh on ENGINEERING PROCUREMENT AND CONSTRUCTION (EPC) Mode
Maintenance of Drain (C/o RCC Drain and Covering of Drain on MP-3 road from Sector-71 underpass to Parthala Flyover), Noida
Supply, Erection, Testing and Commissioning of (2x25 KV, AC, 50 Hz), OHE of Etawah Flyover & Modification in existing OHE in connection with proposal of link line between ETW-BIX line and ETW-MNQ line via flyover and additional link line from Bhind line to ETW (10 km) Prayagraj Division in N.C. Railway.
3D painting work on Ayodhya Basti flyover near Saket Petrol Pump on Dharmapath in Ayodhya and beautification work of the park located below it
Conversion of Overhead power lines to under ground and Transformers LED Street LightingIn ROW road along Both side of the High Court Flyover Prayagraj
On Occasion of the arrival of VVIP guests Road Safety work on the elevated flyover connecting Amar Shaheed Path to the airport - Signage Work
Construction of Flyover cum ROB on RHS of Gomti River Bank from La Martiniere to Army Land via G-20 Road on EPC Basis
JANPAD MORADABAD MAI SAMBHAL CHURAHE FLYOVER KE NEECHE BANE U TURN KI MARMMAT KE SATH CHUDIKARAN EVAM NAVEENN U TURN BNAYE JANE KA KRIYE
Improvement of Wending Zone By I/L Tiles Infront of Anjali Verma And Awasthi Hospital Under Flyover At Rama Devi Chauraha In Zone -02
Work no-08 Supply and planting of trees for beautification of Diamond Flyover Green Belt from NH-9 and maintenance work for one year.
Construction of Soulful Waterfall An state of the art water foam jet fountain with waterfall at the Park near STUPA at Mahamaya flyover,Noida
Construction of proposed Diamond Interchange at Junction at P-59 of ongoing Construction of 5.5 Km long 6-lane Elevated Road over Junction no. 10,11,and 12 near Barola and Bhangel and sector -42,48,49,47, 110 and 107 on DSC road, Noida