Loading…
Loading…
670 results • Best match
Sweeping and Upkeeping Work of Samprity Flyover (BBT Elevated Corridor) from dated 05/12/2024 to 31/12/2025 (392 Days).
Strengthning of bituminous road from fly over to HO Lalu Jha via Azad Hind club to main road at Naya Basti and fly over to Shiv mandir at Santa village of ward no-75 under AMC
Construction of Drain at Bankuramore Sanglagna Bastee Near Fly Over, Ward No- 41, Under DMC Area
Construction of bituminous road near Rangamati Fly Over at Rangamati in Ward No. 24 under Midnapore Municipality.
Erection, testing, commissioning of 25 Mtr High including allied works near Samprity fly over at Bata More under Mahestala Municipality
Repairing of cable fault and some allied works from Dhalai Bridge to Kamal Gazi Fly over end
Sweeping and Upkeeping Work of Samprity Flyover (BBT Elevated Corridor) for a period of One year.
Sweeping and Upkeeping Work of Samprity Flyover (BBT Elevated Corridor) for a period of One year.
Repairing of damage Poles, cable fault, painting of street Light installation including some allied works from Kamalgazi fly Over end to Padmapukur (Both side of Adi Ganga)
Sweeping and Up keeping work of Samprity Flyover (BBT Elevated Corridor) for a period of one year.
Construction of Flyover-1 and Flyover-2 and Associated Road Work.
Annual maintenance of Ultadanga Flyover.
Annual Maintenance of MAA Flyover
Repairing of Bituminous Road from Bijoy Variety Store to Service Road (Near Fly Over), Ward No- 28, Under DMC Area
Sweeping and Up-keeping work of Samprity Flyover (BBT Flyover Corridor) For a period of One year.
RESTORATION OF PAVER BLOCK FOOTPATH AT M.G. ROAD FROM SEALDAH FLY OVER TO R.R. SARANI IN WARD NO-49, BR-V.
SOLAR STREET LIGHT AT APPROACHROAD TO MOYNA FLY OVER UNDER MOYNA PANCHAYAT SAMITY FROM TIED UNFUND OF 15TH CFC- 2022-2023
Upgradation of Road of Moyna Dhal beside Moyna Fly over of Moyna I GP under Moyna Panchayat Samity FY 2022 23
Emergent Patch Repairing work of Mohit Nagar Fly Over To NH Junction Road from 48.90 km to 49.50 km and km 63.60 to 64.40 km under Jalpaiguri Sub Division P.W.D. during the year 2025 2026
Mastic Work on carriageway of Samprity Flyover.
Emergency beautification works in connection with G-20 Summit at Kolkata for the stretch from Ultadanga Flyover to Chingrighata Crossing over 4.5 KM.
Restoration of black top carriageway over Maa Flyover
Annual Maintenance of MAA Flyover up to 31.12.2024
Restoration of black top carriageway over Maa Flyover
K.N.I. Avenue (V.I.P. Road) flyover from 3.05 kmp. to 5.15 kmp.- Painting of flyover crash barrier (6 faces including outside) under Baguihati Highway Sub-Division under Barasat Highway Division No.-I in the district of North 24 Parganas
Repairing of Service Road under Kamalgazi Flyover from P-10 to end of Kamalgazi Flyover towards Southern Bypass of both side of Adi Ganga.
Painting work of Chingrighata Flyover on E.M. Bye-Pass.
Sweeping and Upkeeping Work of Samprity Flyover (BBT Elevated Corridor) from dated 01/01/2026 to 31/12/2026 (356 Days).
Maintenance of street light including daily ON and OFF Operation for a period of one year from Dhalai Bridge to Kamal Gazi Fly Over end on EM Bye Pass
Maintenance of street light installation from Dhalai Bridge to Kamal Gazi Fly Over end on EM Bye Pass including daily ON and OFF Operation for a period of one year
The work for Sweeping and Upkeeping Work of Maa Flyover
Emergency repairing / restoration work of VMS installed at Maa Flyover.
Supplying and laying of cable through micro tunneling near Kamalgazi flyover.
Replacement of CR Seal required for expansion joints over Maa Flyover
Construction of M.S Barricade underneath of Chingrighata flyover at E.M. Bypass.
Reinstatement of Rising Main Pipe-Line (400mm dia. Ductile Iron Pipe) under the Grade Separator of N.H. (Contiguous to Kada Road) Within Ward No -13, Under DMC
Sweeping, Cleaning and Upkeeping works of MAA Flyover from 01.01.2026 to 31.12.2026
Retro-reflectorized cautionary, mandatory and informatory signage all along the MAA Flyover
Mastic work over existing Bituminous Concrete layer of carriageway of Gardenreach Flyover.
Sweeping, Cleaning and Upkeeping Works of MAA Flyover from 12.03.2025 to 31.12.2025
Repairing work Electrical at Chandernagore Flyover
1. Construction of Police Kiosk in 5(Five) different locations over MAA Flyover
Annual Maintenance of Ultadanga Flyover from 1st January, 2026 to 31st December 2026.
2nd Year Maintenance of Intensive Landscaping and Beautification along Median Boulevard under Metro Flyover at Diamond Harbour Road under Ex-Officio Manager, GPW, WBFDCL and DCF, Urban Recreation Forestry Division
Maintenance of street light including daily ON and OFF Operation for a period of one year from Dhalai Bridge to Kamal Gazi Fly Over end on EM Bye Pass(01-01-2025 - 31-12-2025)
INSTALLATION OF WATER ATM NEAR THE BIROHI MORE BUS STAND FLY OVER AT BIROHI ROYPARA SANSAD-VI. UNDER BIROHI-I GRAM PANCHAYAT, FUND-5THFC-TIED
5. Painting of Pier, Pier Cap, Crash barrier etc. of MAA Flyover (restricted areas).
Replacement of 12 nos. of damaged Expansion Joint at different location on Samprity Flyover.
INSTALLATION OF DECORATIVE LIGHTING AT GARIAHAT FLYOVER IN WARD NO - 68, UNDER BR. - VIII
5. Painting of Pier, Pier Cap, Crash barrier etc. of MAA Flyover (restricted areas).