Loading…
Loading…
670 results • Best match
The Sweeping and Upkeeping works of Maa flyover for the year 2020 to 2021
Minor repairing, Upkeeping and maintenance of carriageway of Sonarpur ROB, Kamalgazi Flyover and Service Road under Kamalgazi Flyover under South Divn., R B Sector, KMDA for a period from dated 19.01.2025 to 31.12.2025 i.e ( 347) days.
CONSTRUCTION OF R.C.C. ELEVATED MEDIAN STRIP WITH PLANTATION AND 5 YEARS MAINTENANCE FROM SEALDAH FLY OVER TO 297 A.P.C. ROAD IN WARD NO 37 UNDER BOROUGH-V KMC.
Maintenance of CCTV Camera installed at Maa Flyover for the period of 1(one) year.
Emergent Painting Works of Chingrighata Flyover on E M Byepass in view of ensuring BGBS24
Maintenance of CCTV Camera installed at MAA flyover for the period of 1 (one) year.
Painting of both inside AND outside of Crash Barriers, Railings, RE walls of Ultadanga Flyover.
Sweeping, cleaning and Up-keeping works of Maa flyover for the year 2023 to 2024.
Conversion of conventional HPSV luminaries by LED fittings and some allied works at Kamalgazi Flyover
Maintenance and repairing of Rain water pipe line from Kestopur to Joramandir along (Airport bound flank) of VIP elevated corridor under Baguihati Highway Sub- Division of Barasat Highway Division No.-I in the District of North 24 Parganas.
Sweeping of carriageways of Ultadanga Flyover for one year.
Preventive and Corrective Comprehensive Maintenance of Street Lighting arrangement at VIP Road Flyover, under Flyover and 3nos Sub-Ways maintained by KNED, PWDte for 12 months.
Construction and fitting fixing of M.S ornamental grill barrier underneath of Chingrighata flyover on E.M. Bypass
1. Installation of Directional Board on MAA Flyover in its two extension ramps on both direction
Emergent Painting Work of Median (P61-A2) of MAA Flyover In View of Ensuing BGBS 24
Emergent Painting Work of Median(A1-P60) of MAA Flyover In View of Ensuing BGBS 24
1. The Sweeping, cleaning and Up-keeping works of Maa flyover for the year 2022 to 2023.
MAINTENANCE OF BRABOURNE ROAD FLYOVER IN WARD.-42UNDER BR.-V.
MAINTENANCE OF BRABOURNE ROAD FLYOVER IN WARD-42, BR.-V.
Sweeping of carriageways of Ultadanga Flyover for 12 (Twelve) months from 1st Jan 2026 to 31st Dec 2026
Installation of Road Marking and Raised Pavement Markers at East Bound and West Bound Ramps of MAA Flyover
Restoration of damage poles and replacement of damage cables and some allied works from Kamal Gazi Fly over end to Padma Pukur More on Southern Bye Pass, South 24 Parganas, Baruipur (both sides of Adi Ganga)
Replacement of damaged CCTV by installing, testing and commissioning of new CCTV camera in existing junction at MAA Flyover.
Emergent Painting Work of Crash Barrier of MAA Flyover in EB AND WB In View of Ensuing BGBS 24
Emergent Painting Work of Crash Barrier of MAA Flyover From A1 to P60 In View of Ensuing BGBS 24
Emergent Painting Work of Crash Barrier of MAA Flyover From P61 to A2 In View of Ensuing BGBS 24
Maintenance of illumination system including daily ON and OFF operation for a period of One year of Ultadanga Flyover.
Emergent Painting Work of Crash Barrier of MAA Flyover in GU AND GD In View of Ensuing BGBS 24
Maintenance of illumination system including daily ON and OFF operation for a period of One (1) year of Ultadanga Flyover.
Installation of Cautionary Traffic signage at sharp bend of Maa Flyover from Science City to ITC Royal on both direction
Maintenance of illumination system including daily ON and OFF operation for a period of One (1) year of Ultadanga Flyover.
Installation of retro reflective curve signage near the two approaches and at the sharp bend of Parama Circle on MAA Flyover
Improvement of existing affected area of the Bituminous surface on Garden Reach Flyover.
Protective Painting and Allied Works of Structural steel members of the bowstring girder Up and down at ROB Part of MAA Flyover
Painting of Crash barrier, Median, Pier, Pier cap at Garia Up, Garia Down,East Bound and West Bound Ramp of Maa Flyover.
The work for Maintenance Work of road under the working zone and rest part of MAA flyover throughout the year July18-June19
Revised estimate for Revised estimate for repairing of Bilkuli main road starting from Fly over road to Rahaman Auto Mobile and Service Centre in ward no 30 under CMC
Decorative Illumination of Park Street Flyover/ Bridge during Durga Puja to Chhat Puja - 2023
Decorative Illumination of Park Street Flyover/ Bridge in connection with Kolkata Christmas Festival - 2023
Cleaning AND sweeping of carriageways, Crash Barriers of both Flank of Ultadanga Flyover for 13 (Thirteen) months i.e. From 1st Dec_2024 to 31st Dec_2025
Operation and Maintenance of Samprity Flyover from Zinjira Bazar to Bata More to provide uninterrupted glow of street lighting including S F required spares
SITC of solar Traffic Blinker (LED) on Height Barriers over Ultadanga Flyover and the Canal Circular Road under the Durgapur Bridge at the both approaches.
Dismantling of existing steel structure at 16 (Sixteen) nos. locations underneath the Ultadanga Flyover and disposal of dismantled scrap Steel / Iron materials from the site.
Emergent Painting Work of Handrail of Crash Barriers of MAA Flyover From A1 to A2, GU,GD, EB AND WB In View of Ensuing BGBS 24
Restoration work of street light with supply and fixing of feeder pillar box and light fittings, erection of poles of damaged foundation etc. at MAA Flyover.
Repair and Replacement of rain water pipe and fittings at different locations of MAA Flyover throughout the alignment including GD,GU,EB,WB. With 2 years restoration
Replacement of decorative flexible LED Strip Light (White and Blue Color) including accessories installation on MAA flyover with supply and fixing of luminaires after occurrence of accident.
Maintenance of CCTV Camera System installed at Garden Reach Flyover for a period of 01(one) year.
Maintenance of CCTV Camera System installed at Garden Reach Flyover for a period of 01(one) year.
Maintenance of CCTV Camera System installed at Garden Reach Flyover for a period of 01(one) year.