Loading…
Loading…
589 live338 closing this weekmost from PUBLIC WORKS DEPARTMENT and National Highways Authority of India
589 results • Best match
Widening and Upgradation of existing highway from Khagaria (Design Ch. 270.000) to Purnea (Design Ch. 413.529) section of NH 31 and NH 231 to 4 lane with paved shoulders under NH (O) on BOT (Toll) in the State of Bihar (2 nd call)
CS for Independent Engineer for Widening and Upgradation of existing highway from Khagaria Design Ch.270.000 to Purnea Ch.413.529 section of NH31-NH231 to 4 lane with paved shoulder under NHO on BOT (Toll) in the State of Bihar (2nd Call)
Rehabilitation and Upgradation of existing 4L highway to a 6L divided carriageway of Jhansi-Orai Sec. (PKG-1) from Design Km 1378.915 near Jhansi (Sijwaha Tiraha NH27) to Design 1423.000 near Sultanpura Village NH-27 in UP on HAM mode. (TL44.085 kms)
Risk and cost works of Ms SP Pandoh Takoli Kullu Highway Pvt Ltd on Four laning of end of Pandoh bypass to Takoli section of NH 21 from km 221305 to km 242000 in the state of Himachal Pradesh International Competive Bidding
IE for (PKG1) Dev of 6L access controlled greenfield highway starting from Junction with NH-60 at Adgaon (km. 138.00) to Ahilyanagar (km. 290.000) to start of Ahilyanagar bypass (km. 126.564) of NH-160 in Maharashtra on BOT (Toll) Mode 2nd call
Rehabilitation and Upgradation of existing 4L highway to a 6L divided carriageway of Jhansi Orai Section (PKG-3) from Design Km 1469.000 near Ingui Khurd Village to Design Km 1515.710 near Orai (Bandha Village) NH-27 in Uttar Pradesh on HAM mode.
PMC SERVICES FOR DPR, PRE-CONSTR ACTIVITIES, SUPERVISION FOR CONSTR OF HIGHWAY TUNNEL OF TENTATIVE LENGTH 5.00 km (ZAMINDAR GALI TUNNEL) ON H-Z-M RD INCL APPROACHES ON BOTH SIDES (TENTATIVE LENGTH 11 KM) UNDER (P) BEACON IN UT OF J K
Expression of Interest (EOI) for Design Development Deployment, Operation and Maintenance of the Next Generation 1033 National Highways Helpline and Call Centre
Balance work of Design Construction and Maintenance of various infrastructure works (Convention Centre at new colony ward no 8 Sports Complex at new colony ward no 8, Toy Village Bazaar at ward no 5 Hatt Bazar at ward no 3 Bhopal Highway Road ...
IE Services for Construction of 6-lane Greenfield Highway starting from its Junction with NH-4B (New NH-348) near Pagote (km.0.000) till its Junction on NH-48 at Chowk (km.29.219) in Maharashtra to be executed on BOT (Toll) mode under NH (O)
CS for IE services for Development of 4 lane Badvel to Nellore Highway from Badvel Gopavaram Village on NH NH-67 (Ch.630.960) to Guruvindapudi Village on NH-16 (Ch.739.094) in Andhra Pradesh on Build-Operate-Transfer (Toll) mode for a TL 108.134 km.
Bamboo barricade at Basirhat Bridge during Durgapuja,2026 for Safety under Basirhat Highway Sub-Division of Barasat Highway Division No.I in the dist. of North 24-Parganas.
Bamboo barricade at Hasnabad Bridge during Durgapuja,2026 for Safety under Basirhat Highway Sub-Division of Barasat Highway Division No.I in the district of North 24-Parganas.
Bagnan Mankur Road, Temporary Restoration Work on Investigation Pits Under Bagnan Highway Section of Howrah Highway Division in the District of Howrah during the Year 2026-2027
Group maintenance of different Buildings i.e, the office building of Purulia Highway Division, PHSD, BHSD, MHSD and Inspection Bungalow under Purulia Highway Division in the District of Purulia.
Patch repairing work at Akalipur Bhadrapur Road from 0.00km to 2.00km, in stretches under Rampurhat Highway Sub Division of Birbhum Highway Division-I during the year 2026-27
Annual maintenance of Highway Connecting Ankali to Hanumasagara Hosur (on SH26) via Lingadevarakoppa, Kod, Hullatti, Chikkayadachi, Rattihalli, Kanavisiddageri, Tadakanahalli, Anaji, Guddada Madapura SH-256 from km 69.04-69.76, 77.42-79.39, 79.63-81.82, 82.60-89.30, 90.00-113.09 in Hirekerur/Rattihalli taluk Haveri district for the year 2026-27.
Annual Maintenance of (a) Highway Connecting from Savanur to Hanagal SH-274 km 15.34 to 24.050 , km 25.76 to 29.36 , km 29.76 to 30.910 , km 31.42 to 36.66 , km 36.81 to 37.138 & km 37.613 to 40.46 in Hangal taluk of Haveri district for the year 2026-27.
c c block nirman karya jayram sigad ke makan se nanuram jakhad ke makan ki or pratappura, jakhado ki dhani se pratappura grade mega highway nagaur road jane wale raste par c c block road nirman karya, pratappura road se yadavo ki dhani jane and other
Maintenance of Road Highway Connecting Andra Pradesh border with Putpak-Bosaga SH via Gurumitkal, Handarki, Satnur, Chitapura, Tengli, Hebbal, Arankal, Varnal, Mudbe (SH-126) Road Km 65.00 to 66.00, 72.48 to 77.20,79 to 80.03 Under 3054 (SH) for the year 2026-27 In Chittapur Taluka kalaburagi dist
PMC SERVICES FOR DPR, PRE-CONSTR ACTIVITIES, SUPERVISION FOR CONSTR OF HIGHWAY TUNNEL OF TENTATIVE LENGTH 2.20 km (KM 12.90-23.00 ON MPD RD INCL CONSTR OF APPROACH Rd TO NHDL (PS) SPCN (1) LENGTH OF 2.6 km FROM SOUTH PORTAL OF TUNNEL AT KM 12.90
Dev of 4/6L of AC Kanpur Kabrai GF highway start 0.000 (Kanpur Ring road) to 117.700 near Kabrai Sec1 and Overlay/Strengthen other road safety and improvement works on exist Kanpur Kabrai sec from 7.430 to 130.100 of NH34 in UP Sec2 on DBFOT pattern
Patch repairing work from ch 16.30km to 19.80km of Kanupur Bahutali Road in stretches under Rampurhat Highway Sub Division of Birbhum Highway Division-I during the year 2026-27
Repair and Maintenance oi Sal Bridge at 44th km of lllambazar- Dubrajpur Road (SH-14) under Illambazar Highway Sub-Division under Birbhum Highway Division-II in the district of Birbhum.
Junction Improvement work of Link road to Bolpur Nanoor -Bolpur Kankalitala Road (VR) under Bolpur Highway Sub Division of Birbhum Highway Division-II, in the District of Birbhum during 2026-2027.
Annual maintenance of Highway Connecting Davangere (on SH65) to Saatenhalli via Kamalapur (on SH26), Puradakeri, Galaginakatti, Hosakatti, Kodamaggi, Masur, Dudihalli, Hirekerur, Hadrihalli, Yattinahalli, Sriramanakoppa, Haunsbhavi SH-233 from km 69.02-76.61, 79.13-91.32, 92.97-105.64, 107.80-113.17 in Hirekerur/Rattihalli taluk Haveri district for the year 2026-27.
Construction of CC road, drains, and interlocking work on the side berms from NH-28 Highway via the house of Raghavendra Ram Tripathi and the house of Dr. S. K. Sharma up to the public toilet, and from the house of Chiranjan Dubey up to Prem Kunj in
Bethuadahari Bhagirathi Road from 3.65 km to 4.25 km, patch repairing work in stretches by jhama metal of Krishnagar Highway Sub Division No.I under Nadia Highway Division No. I in the district of Nadia.
CONSTRUCTION OF CROSS DRAIN IN FRONT OF S.P. OFFICE, BASIRHAT AT CHAINAGE 0.350 KM OF OLD SATKHIRA ROAD UNSER BASIRHAT HIGHWAY SUBDIVISION OF BARASAT HIGHWAY DIVISON NO. I IN THE DISTRICT OF NORTH 24 PARGANAS
Patch Repairing of Road in stretches at Uluberia Panpur Road from 5.50 Km to 10.50 Km, of Amta Highway Sub-Division under Howrah Highway Division in the District of Howrah in the year of 2026-27
kutcha drain to protect the flank during monsoon at Rajgram Mohorapur Road from 0.00kmp to 6.50km under Rampurhat Highway Sub Division of Birbhum Highway Division- I, in the district of Birbhum during the year 2026-27
Providing Street Light from Shiv Mandir Pali to Bilaspur Highway (Length 2.20KM) Distt. Korba (C.G.)
Providing fitting and fixing A.C.P sheet at the damaged Portion of View cutter at Mandirtala High Ramp, Multilayer Car Parking and at Kona Expressway Up Ramp of Vidyasagar Setu, Howrah side.
Temporary patch repair of potholes using instant all-weather pothole-repairing compound (supplied by the Department), as and when required, at different roads under Baguihati Highway Sub-Division of Barasat Highway Division No. I, in the district
Nalhati Rajgram Road from chainage 16.90 km to 17.00 kmp Restoration work by Paver Block (in stretches) under Rampurhat Highway Sub Division of Birbhum Highway Division-I in the district of Birbhum during the year 2026-27
Dressing and Chilchalling with cutting kutcha drain to protect the flank during monsoon at Murarai Mitrapur Road from 0.00kmp to 12.24km under Rampurhat Highway Sub Division of Birbhum Highway Division- I, in the districtofBirbhum duringtheyear 26-27
Repair and rehabilitation of chittasali Bridge at 7.15 km of Badkulla Kulgachi Road by providing wearing coat and repairing of railings of Krishnagar Highway Sub-Division No.II under Nadia Highway Division NoI, in the district of Nadia.
Construction of 75.00 mtr wide road peripherial road and sewer line between sector -09 and Airport yeida WC-03
Development work for 7 Abadi plots of village salarpur yeida. WC-03
Development work of village kadalpur to be develop as smart village , yea WC-06
Development work of village Achhepur to develop as smart village in YEA WC-06
Construction of 45mtr wide road in sector -8D yeida(between plot no-03 to plot no-1H) WC-04
Construction of 45mtr wide road in sector -8D yeida(between plot no -04 to plot-23) WC-04
Construction of 75.00mtr wide peripherial road and sewer line between sector- 5 and 6 yeida .WC-3
Development work of village .parsol (majra- bagh) to be develop as smart village ,YEA.WC-6
Development work of 7 Abadi plots of village- Acchheja Bujurg Situated at Doongarpur Reel kha, YEIDA.WC-01
Balance internal development work industrial sector -29 part -B ,YEIDA WC-04
Construction of service road along 75.00 mtr wide peripheral road (sector -08 side) between sector -08 and 8B, yeida wc-03
Providing and laying drain and sewer line in sector -10 YEA .WC-02
Construction of community center in village -chak Jalalabad, Yeida. wc-06