Loading…
Loading…
546 results • Best match
Providing and laying of sewer line RCC NP-3 pipe 400mm dia and water supply line 100mm dia from Beri wala Bagh booster near Nexa showroom to Raj Nagar chowk near highway in ward 20 zone 1 under MC Gurugram.
Construction of Vehicular Underpass at km 229.500 including Widening of New Service road, Exit-Entry, Dismantling, Reconstruction of Drain and Relocating of Highway Lighting on Panipat-Jalandhar section of old NH-1 (new NH 44) in the State of Punjab
Operation and Maintenance of 6-lane Badarpur Elevated Highway (including service roads ramps approaches PUPs toilets and Parks) on Delhi Agra section of NH-2 from Km.16.100 to 20.500 in the State of Delhi and Haryana on item rate basis.
Repair and Maintenance of Project Highway at Risk and Cost of Contractor for Four laning of Haryana-Punjab border to Jind Section of NH-71 (New NH-52-352) from km 238.695 to km 307.000 in the State of Haryana
Independent Engineer Services during Operation and Maintenance (O and M ) for Conversion of Delhi Gurgaon section of NH8 into an Access Controlled Eight/Six lane Highway from km 14.300 (Rao Tula Ram Marg) to km. 42.00 gurgaon ) in Delhi and Haryana.
HEW 89 Construction of brick toe wall with grill fencing in green belt along Delhi Mumbai Vadodara Expressway in Sector 32, Faridabad
Hiring of Ambulance Service on Eastern Peripheral Expressway from Km. 1.000 to Km 136.000 in the States of Haryana and Uttar Pradesh
Custom Bid for Services - Calibration of Civil Lab Equipment Digital water Bath Cover testing Machine CBR testing Machine Digital Bouncy Machine as per Attached Annexure A with Bid Document Similar Category Calibration Services
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant - Chemical; Chemical analysis; NABL Labs
Calibration Services - Mechanical; Calibration of Cover testing Machine Digital Water Bath Vacuum Guage Rebound Hammer Test Sieve Dial Guage Hot Air Oven as per Annexure A with the Bid Document; NABL Labs; Buyer premises (onsite)
Calibration Services - Mechanical; Calibration of Digital Universal Testing Machine(UTM) and Digital Compression Testing Machine(CTM); NABL Labs; Buyer premises (onsite)
CS for AE for Supervision of Development of 6-lane access control highway of Bareilly-Ludhiana EC under BMP from Ranipur Barsi Saharanpur district to Sadopur Ambala district Ch.45.500-121.786 of Shamli Ambala section in Haryana on EPC Mode (PKG-II)
Construction of Sump well with pumping machinery and providing and laying of 450mm dia RCC NP3 for storm water pipe line from Culvert under Delhi Mathura highway to Sump well and provision of 300mm dia rising main from Sump well to exist (Recall)
CONST. OF 2 NO LINK ROADS I.E. (1) MOHNA GOPI KHERA ROAD TO GHAGHOT (ID-9829), (2) KGP HIGHWAY NEAR JALHAKA MOR TO GHAGHOT SARDAR SIHI WALA (ID-9826) IN PRITHLA CONSTITUENCY, DISTT. FARIDABAD (CM ANNOUNCEMENT CODE NO. 25803, 25793 DATED 27.03.2022)
Engagement of user fee agency on the basis of competitive bidding through e-tender for Kherki Daula and IGI User fee plazas for Delhi-Gurgaon section of NH-8 into Access Controlled 8-6 lane Highway in the state of Delhi and Haryana
Six Laning of Panipat-Jalandhar section from km 96.000 to 387.1 of NH-44 in the State of Haryana and Punjab to be executed on BOT (Toll) project on DBFO Pattern under NHDP Phase V - Providing Highway lighting works in selected reaches
CS for AE for Supervision of Development of 6-lane access control highway of Bareilly-Ludhiana EC under BMP from Gogwan Jalalpur to Ranipur Barsi (from Ch.(000.600) to 45.500) of Shamli Ambala section in Uttar Pradesh on EPC Mode (Package-I)
Engagement of Safety CS during OM of (i)6-laning Strengthening of NH-248A Km2.740 Rajiv Chowk-Km11.682 in Gurugram (Package-I)(ii)from km11.682-24.536 Package-II(iii)Delhi-Gurgaon of NH-48 and other works project highway km11.060-42.00 in Haryana
CS for SC of Strengthening Road Safety works Including improvement and Routine OM of Delhi Gurgaon sec. of NH48 and works along the project highway from 14.300 to Km. 42.000 (Rao Tula RamMarg in Delhi to KherkiDhaula FP in Haryana) in Delhi Haryana
Construction of 6 lane VUP at Km 168.535 including construction of New Service Road, Exit and Entry, drain and Highway Lighting on Rectification of black spot at Hisar Cantt. Location From 167.810 to 169.445 in the state of Haryana on EPC Mode
Upgradation of Highway starting from junction with NH-44 at Panipat connecting Kairana Shamli Muzaffarnagar Miranpur Bijnor and terminating at its junction with NH-74 at Kotawali to 2-4 lane configuration in State of UP on EPC Mode Pkg-III NH-709AD
HEW 90 Construction of brick toe wall with M.S. grill fencing in green belt along Delhi Mumbai Vadodara Expressway in Sector-9, Faridabad
Providing and fixing of MS grill and gate at entry point on dividing road sector-17/18 at Delhi Mumbai Vadodara Expressway Faridabad.
Renovation work comprising of Civil Works, Electrical Works, Low Voltage, IT and Audio-Video works etc
Construction of Phirni Highway to Rohtash singh at village Chamanpura
Annual Maintenance of road including pot holes, crash barrier, median drain etc of Manesar Palwal Section of KMP Expressway in the State of Haryana
Annual Maintenance of road including pot holes, crash barrier, median drain etc. of Manesar Palwal Section of KMP Expressway in the State of Haryana
Supply of plants and shrubs in green belt (along Mumbai Vadodara Expressway) parks in different Sector-2 ,61,62,63,64,65 and 60 for Urban Forest Faridabad.
4-6 Laning of Zirakpur-Parwanoo section of NH-05 (NH-22) from KM 39.960 to KM 67.550 in the State of PB, HR, HP Repair and Maintenance of Project Highway at risk and cost of concessionaire under article 18.12 of Concession Agreement (3rd Call)
Repairing of 600 mm i/d and 800 mm i/d DI pipe line with mechanical collar including JCB, Hydra, Gen set and Submersible pump etc. at KMP highway toward Babra Bakipur Boosting station and all other works contingent there to complete in all respects
Strengthening Road Safety works Including improvement and Routine O and M of Delhi-Gurgaon section of NH-48 Other works along the project highway from Km. 14.300 to 42.000 (Rao Tula Ram Marg in Delhi to Kherki Dhaula FP in Haryana) in Delhi Haryana
Routine Operation and Maintenance of Delhi-Gurgaon section of NH-48 and Other works along the project highway from Km.11.060-Km.42.000 (Dhaula Kuan in Delhi to Kherki Dhaula Fee plaza in Haryana) for a period of one year on Item Rate basis
COLD TAPE INNER WRAP WR WASHALA, COLD TAPE OUTER WRAP WR WASHALA, PRIMER WR WASHALA, MASTIC FILLER WR WASHALA, COATING WRAPPING MACHINE WR WASHALA, COLD TAPE INNER WRAP WR GUJRI, COLD TAPE OUTER WRAP WR GUJRI, PRIMER WR GUJRI, MASTIC FILLER WR GUJRI, COATING WRAPPING MACHINE WR GUJRI, COLD TAPE INNER WRAP CR KOTA, COLD TAPE OUTER WRAP CR KOTA, PRIMER CR KOTA, MASTIC FILLER CR KOTA, COATING WRAPPING MACHINE CR KOTA, COLD TAPE INNER WRAP CR BINA Incl BPPL complete, COLD TAPE OUTER WRAP CR BINA Incl BPPL complete, PRIMER CR BINA Incl BPPL complete, MASTICFILLER CRBINA Incl BPPL complete, COLD TAPE INNER WRAP VBPLVADINAR, COLD TAPE OUTER WRAP VBPLVADINAR, PRIMER VBPLVADINAR, MASTICFILLER VBPLVADINAR, COATINGWRAPPING MACHINE VBPLVADINAR, COLD TAPE INNER WRAP SR KOCHI Incl KHPL complete, COLD TAPE OUTER WRAP SR KOCHI Incl KHPL complete, PRIMER SR KOCHI Incl KHPL complete, MASTICFILLER SR KOCHI Incl KHPL complete, COATINGWRAPPING MACHINE SR KOCHI Incl KHPL complete, COLD TAPE INNER WRAP NRPIYALA, COLD TAPE OUTER WRAP NRPIYALA, PRIMER NRPIYALA, MASTICFILLER NRPIYALA, COATINGWRAPPING MACHINE NRPIYALA
Const. of IPB street from Kabristan to Highway NH-152-D
Construction of rasta from Bhandor road to 152 D highway tak
IE for supervise of OnM of 6L AC Highway from Jn with Jaitpur Pushta Rd to Jn KMP Expway with NH148 N Delhi Vadodara Expway Sec of NH148NA 9.000 to 59.000 spur from 13.200 to Jn of Faridabad Ballabgarh Bypass with NH19 Badarpur Border in HR BMP
Six Laning of Panipat-Jalandhar section of NH-1 From Km 96 to 387.1 in the State of Haryana and Punjab to be executed as BOT (Toll) on DBFO Pattern under NHDP Phase V- Repair and Maintenance of Highway between km 96 to km 212 (Haryana Section)
Repair and rehabilitation of structure falling in the Manesar Palwal Section from Ch.82.682 to Ch.135.650 on KMP Expressway Project in the State of Haryana
A/mtc Estimate of L/S work Green Belt Along Delhi Mumbai Vadodara Expressway Sec-2,3,8,13,14,17,29,30,33,34,37,61,62,64 and 65 Faridabad (Sector side ) for the year 2026-27
A/mtc Estimate of L/S work Green Belt Along Delhi Mumbai Vadodara Expressway Sec-2,3,8,13,14,17,29,30,33,34,37,61,62,64 and 65 Faridabad (Sector side ) for the year 2026-27
Supply and installation of 08 nos Laser based Traffic Interceptor on behalf of Haryana Police
Shifting, Laying and Making inter connections in Existing pipe line enimating from WTP Chandu and WTP Basai at Dawark Expressway, at GWS tail and WTP Basai Gurugram.
Six Laning of Panipat-Jalandhar section of NH-1 From Km 96 to 387.1 in the State of Haryana and Punjab to be executed as BOT (Toll) on DBFO Pattern under NHDP Phase V- Repair and maintenance of highway in between km 212 to km 387.1 (Punjab section)
const. of IPB RASTA from Stadium towards Highway nh 11 under pass at
Providing and laying of Bituminous Concrete alongwith Kerb Stone on Manesar Palwal Section of KMP Expressway in the State of Haryana including maintenance period of five years Major Maintenance
HIRING PATROLLING TEAM WITH VEHICLE TO SAFE GUARD GREEN BELT ALONG DELHI VADODRA MUMBAI EXPRESSWAY FROM ENCROACHMENT FROM SECTOR 37 TO 59 FARIDABAD AND ALL OTHER WORKS CONTINGENT THERETO
Construction of Phirni Highway to Rohtash singh at village Chamanpura, Block Beri, District Jhajjar
HEW 73 HIRING PATROLLING TEAM WITH VEHICLE TO SAFE GUARD GREEN BELT ALONG DELHI VADODRA MUMBAI EXPRESSWAY FROM ENCROACHMENT FROM SECTOR-37 TO 59 FARIDABAD AND ALL OTHER WORKS CONTINGENT THERETO.
CONST. OF PLATFORM AT PANCHAYAT LAND
Development of Sarasvati River Front from RD 48.70KM to 46.91KM (Highway Bypass bridge to Kaithal Ambala road bridge)