Loading…
Loading…
2,970 results • Best match
Up-gradation existing 2 lane highway to 4 lane with construction of elevated 4 lane fly over at section Talegaon to Chakan from Ch. 0/00 to 28/300 and Up gradation of 6 lane highway Chakan to Shikrapur At grade from Ch.28/300 to 53/20
Installation of inverter for traffic signal Dapodi to Nigadi on mumbai pUne highway and improvement of system and related works 2024-25
Construction of four lane road from Pune Nashik Highway to Yedgaon Dam Under Yashvantrao Chavan Smarak Infrastructure Developement Programme (K.M- 0/00 to 3/020)
Construction of SWF/CTF at RD 90 m on SihoraBoargaon Machhera minor, Widening of State Highway Crossing on Machhera minor at RD 2454m Renovation of Machhera minor and Const of of Struc Like DO Drainage cros and VRB from RD 0to 1260
MIDC has developed 95.64 Hectors of I.A. at Parbhani. The Parbhani I.A. is situated on Parbhani Nanded state highway at a distance of 3.00 km. from Parbhani Railway Station. in this work Increasing compound wall height of water work premises is inclu
MIDC has developed Krushnoor Industrial area besides Nanded-Hyderabad state highway. The water supply to the area is made through HSR at hillock at krushnoor, the pure water pumped from Nanded WTP to low level reservoir (LLR) at krushnoor and same is
Construction of Nagpur Gondia Access Controlled Expressway in the State of Maharashtra on EPC Mode -PACKAGE NG-2A from km 58 850 Thana Tq. Bhandara to km 94 100 Jambhalpani. Tq. Mohadi Dist. Bhandara Length- 35.250 km
Purchae of Boats, Safety Equipments for Boating Along the Expressway Const of Toilet for Boaters and Citizens Seating and Stopping facility For Citizen, Drilling Borewell and Providing Drinking Water Coller Facility for Citizens at Morya Lake, Mulund
Engagement of Safety Consultant Services for Construction of Greenfield connectivity to Jewar International Airport from DND-Faridabad-Ballabgarh Bypass KMP Link-Spur to Delhi Mumbai Expressway on HAM under BMP in the state of Haryana and UP
Establishing and Managing Modern Communication system for Conference, Video Conference, Public Functions and all other sphere of activities hosted by NHAI and Ministry of Road Transport and Highways for Honble Minister for RTH anywhere in India
Engagement of user fee collection agency on the basis of e-quotation through for Pimparwadi fee plaza for the section from Sinnar-Shirdi Section of National Highways Number 160 HAM Mode in the State of Maharashtra
Development of 12 m DP Road and Footpath in Prabhag No 31 Late Ramesh Wanjale Bridge Chowk towards River adjacent to Highway
Extention of Distribution Water Supply Pipe line from Tembhode Waghoba Road Palghar West. (From Tembhode ESR towards Mahim Highway Right hand side)
Extension of HDPE Gravity and Distribution Pipeline from Panchayat samiti entry gate to old Police Station front gate along Nagar Manmad Highway
Detailed Engineering survey to streamline traffic at Vikhroli traffic Police Chwoki Nagar bur stop at Km 577/600 on Eastern Express Highway.
WIDENING OF OLD PUNE MUMBAI HIGHWAY WITHIN KHADKI CANTONMENT AREA DEVELOPMENT OF BRTS CORRIDOR AND TO COMPLETE BALANCE WORKS IN BOPODI STRETCH
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM CHIMUR HIGHWAY ROAD TO MATA MAHAKALI POLYTECHNIC COLLAGE AT BORDA, TALUKA WARORA DIST- CHANDRAPUR (MLA FUND)
HEIGHT RAISING OF FRONT SIDE OF SERVICE ROAD ADJECENT TO HIGHWAY ROAD AT A.P.M.C MAIN MARKET YARD, PHULAMBRI TQ, PHULAMBRI DIST. AURANGABAD.
Supplying Material for Construction of Cement concrete Road at Nagar Kalyan Highway to Ravsaheb Zaware Shet Road At Takali Dhokeshwar Tal- parner
Estimate No. 643/NGP/2018 19 Providing Street light pole and LED fitting from Highway to Yerkheda village at Kamtee Dist Nagpur
To Polish road divider from Jaystamb to Danda fisheries on Main road 80 foot highway under Ratnagiri Municipal Council through Vaishishtyapurn Grant
P/F Paver Block, Playing Equipment and Beautification work at Bimbisar Nagar, Western Express Highway, Goregaon (E) (27-Mumbai North West Constituency)
Selling of Cast iron bearing and expansion joints scrap of National Park Datta pada and Aarey flyover on Western Express highway Corridor
Providing and fixing mild steel railing at Taloja creek bridge km 118/890 to Kopara VUP 119/850 on Sion Panvel Highway.
To construct road from 80 Foot Highway to Teli Aali in Ward No 14 under Ratnagiri Municipal Council through Special Road Grant
Erection of 40m BSFL NBFL Tower Infrastructure including Cable runway and Earthing at Sangli Kolhapur Highway near AIR Station in Sangli District
NDVSY work for Const. of Drain/Passage and P/F Grill From Bhajiwada to Saibaba Mandir, Western Express Highway, Vile Parle (E)
Construction of S.T.B.T road from House of Ekanath Gulchand To Highway in Prabhag No 9 Shivaji Nager At Varangaon Municipal Council Varangaon
Rectification of black spot at L.P.Bridge on Sion Panvel Highway and other allied works (Under Road Safety Permanent measures. ch.km.128/000)
Prabhg kr 33 a madhil vadgaon bk vadgaon khurd dhyari madhil vividh thikani highway parisaratil drainge laine takne v tadnushangik kame karne
Providing, Lowering and Jointing 90 mm Dia. HDPE water supply pipe line for Highway Road to Ranjeet Tanaji Mandale House at Khanapur
Providing WBM and BT on kharepatan sambhajinagar highway to bramha dev mandir road in km 0/200 to 1/00 tal kankavli
Improvement to BT Surface of Uran Flyover (Ch.126/350 to Ch.125/380 km) by Mastic Asphalt on Sion Panvel Highway.
Construction of R.C.C. Retaining Wall from Atal Bihari Vajpayee Statue to Star Toilet, Western Express Highway, Opposite Bandongari, Kandivali (E). (R-South)
RFP for Construction of Major Bridge at Kalbadevi Creek on Revas Reddi Coastal Highway in Ratnagiri District in the State of Maharashtra
MATERIAL SUPPLY FOR DRAIN CONSTRUCTION AT VILLAGE MANSAR WARD NO. 1 FORM SHARMA TO HIGHWAY UNDER D.P.D.C. NAGARISUVIDHA VISHESH ANUDAN 2022-23
Improvement to CDB Belapur Junction at Ch.123/960 to Ch.124/000 by Providing Cement Concrete Pavement on Sion Panvel Highway.
SITC of New Poles and LED Fitting for Urja Pratik to Nashik Highway under Road Widening in Kharegaon under Kalwa ward committee
Providing , Lowering and Laying Water Pipe Line From Bhavani peth pump house to Shelgi Mehetab Nagar E.S.R.(Trunk Line) Highway Crossing , Solapur.
Improvement of Pathways and Drainage system at Shastri Nagar, W E Highway, Vile Parle (East) in Beat no.85 K/East ward.
ST.BT Ahmednagar Aurangabad highway SH 60 to Usthal Dumala (Near highschool) VR 145 Road km.0/000 to 1/200 Tal. Newasa
Installation of concrete sewer and paver block on it from Mahim Manor Highway to Crystal Park Laxmi Wadi. General District Annual Plan
PROVIDING PAVING BLOCK AMD CROSSING PAVING BLOCK IN WARD NO. 14 CHANDAN ESTATE , MUNOT HOUSE TO PUNE HIGHWAY MUTHHA HOUSE FOR AMC
Construction and Improvement of Sliplane along Mankhurd VUP Panvel side between Ch. 139/260 to Ch. 139/560 on Sion Panvel Highway.
Prabhag kr 33A vadgav bk s no 55 highway parisaratil vyanktesh vrundawan yethe sanskrutik holl bandane furniture karne v iter kame karne
MKMSS work for Beautification and P/F Ladi at Vanrai Mahila Mandal, Goregaon 13-1344, MHADA Vanrai Colony, Western Express Highway, Goregaon
Strengthening And Black Topping To At Kherdi Shivajinagar Shashikant Lad Highway to Mahadik Guruji House (Marathi School) Road, Tal. Chiplun Dist. Ratnagiri.
Construction of Cement Concrete road at Khoni Undrya Baraku thakare to Ghoda Company to main road Taloja Highway tal kalyan dist thane
Prabhag kr.33 A vadgav budruk yethe vividh thikani highway, charwadvasti, gavthan parisarat navin pol basvine, durust karne, vidyut vishayak kame karne
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM SETHI HOUSE TO MAIN ROAD OF HINGOLI HIGHWAY AT TIRUPATI PARK P.NO. 04, WASHIM (UNDER N.P.FUND)